- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
![altagas stockhouse](https://investingnews.com/media-library/altagas-stockhouse.png?id=27864826&width=1200&height=801)
Cache Enters into $6 Million Equity Facility with Alumina Partners
Quarterly Activities Report for the Period Ended 30 June 2024
Warriedar Resources Limited (ASX: WA8) (Warriedar or the Company) is pleased to report on its activities for the quarter ended 30 June 2024.
HIGHLIGHTS
Golden Range and Fields Find Projects, Western Australia
- Remaining nine (9) assay results from Phase 1 2024 RC drilling at Ricciardo returned significant intervals of high-grade gold mineralisation, including:
- 8m @ 11.40 g/t Au from 166m (RDRC041), including
- 3m @ 22.38 g/t Au from 167m
- 8m @ 2.63 g/t Au from 160m (RDRC034)
- 4m @ 14.49 g/t Au from 188m (RDRC039), ending in mineralisation
- 12m @ 1.91 g/t Au from 74m (RDRC040), ending in mineralisation
- 8m @ 11.40 g/t Au from 166m (RDRC041), including
- Diamond drilling program, for 29 holes and approximately 2,500m, commenced at Ricciardo and M1. Results returned after the June quarter end for the first twelve (12) diamond tails (for 770m) intersected significant gold mineralisation, including:
- 19m @ 4.94 g/t Au from 188m (RDRC039 DD) (includes contiguous final RC result of 4m @ 14.49 g/t from 188m)
- 8.9m @ 8.93 g/t Au from 156m (M1RC191 DD), including
- 2m @ 23.83 g/t from 158m
- 12m @ 6.98 g/t Au from 110m (RDRC040 DD), including
- 3m @ 22.12 g/t Au from 112m
- 16m @ 2.30 g/t Au from 243m (RDRC055 DD), including
- 6m @ 3.13 g/t Au from 252m
- 17m @ 2.38 g/t Au from 264m (RDRC055 DD) including
- m @ 4.03 g/t Au from 273m
- Results to date at Ricciardo substantially increased the known extent of the high-grade shoots beneath the historic Silverstone and Ardmore pits; confirm the presence of a (new) high-grade shoot below the Eastern Creek pit; and expand the mineralised deposit area below the Silverstone and Silverstone South area.
- Results for the first Resource infill diamond hole at M1 returned significantly higher grade than expected, confirming the high-grade extension potential at this deposit.
- Phase 2 2024 RC drilling program at Ricciardo and M1, for 25 holes and approximately 5,024m is complete. A large proportion of these RC meters are ‘pre-collars’ for the diamond tails.
- The diamond drilling program, the first at Ricciardo and M1 in over 10 years, is still ongoing and expected to be completed by mid-August.
Big Springs Project, Nevada
- Proposed Plan of Operation (PoO) application continues to progress.
Corporate
- Asset Sale Agreement pertaining to the acquisition of non-core tenements E59/1324-I, M59/386-I, M59/387-I and M59/425-I (Deferred Assets) terminated, with the date for satisfaction of required conditions precedent passing.
- Cash of A$3.6 million as at 30 June 2024 and zero debt (excluding typical trade creditor balances).
Western Australian Projects
The Golden Range and Fields Find Projects (the Projects) are located approximately 350 km northeast of Perth and 260 km east-southeast of Geraldton (refer Figure 1). The total consolidated land package of the Projects is 788 km2, extending for over 70 km of strike from north to south and covering much of the central Yalgoo-Singleton and Warriedar Archean greenstone belts.
Total historical gold production from Golden Range and Fields Find was 350 koz, with the existing oxide plant placed on care and maintenance in August 2019.
The current JORC (2012) Mineral Resource estimate for Golden Range is 15.2 Mt at 1.7 g/t Au for 816 koz contained gold (of which 412 koz at 1.7 g/t Au sits in the Measured and Indicated classifications). For further Mineral Resource estimate details, refer to ASX release dated 28 November 2022.
Click here for the full ASX Release
This article includes content from Warriedar Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Development Contract for Underground Exploration Drill Drive Awarded to Barminco
New drill drive to provide underground drill platforms to in-fill and extend existing deposits and identify new high-grade shoots
Spartan Resources Limited (“Spartan” or “Company”) (ASX: SPR) is pleased to announce that it has awarded the contract for the development of an underground exploration drill drive at its 100%-owned Dalgaranga Gold Project (“DGP”), located in the Murchison region of Western Australia, to specialist underground mining services contractor, Barminco Limited, a wholly owned subsidiary of the ASX-listed global diversified mining services company Perenti Limited (ASX: PRN).
Highlights:
- Development contract for the underground exploration drill drive at the Dalgaranga Gold Project awarded to Barminco Limited.
- The contract, which is valued at ~$18.3 million, provides for 2,350m of development to deliver twin decline access for the establishment of underground drilling platforms to in- fill and extend mineralisation within the Never Never, Pepper, Four Pillars and West Winds areas.
- The drill drive has also been designed to support future mine production activities.
- All regulatory mining approvals are now in place and all major support services have been engaged to facilitate the commencement of construction in the current quarter.
- Surface exploration drilling at Dalgaranga will shortly re-commence, with rigs arriving on site later this month.
Figure 1: Long Section of the Never Never Gold Deposit and the Pepper, Four Pillars and West Winds Gold Prospects looking east. Proposed exploration drill drive design in black.
The contract, which is valued at ~$18.3 million including an allowance for fuel and contingencies, provides for 2,350m of development to deliver twin decline access for the establishment of underground drilling platforms to in-fill and extend mineralisation across the Never Never, Pepper, Four Pillars and West Winds deposits.
All of these steeply-plunging, high-grade gold zones are located along a single 800m-long, semi- continuously mineralised north-south stratigraphic horizon (see Figure 1). The exploration drill drive has been designed to run parallel and adjacent to this horizon to provide underground drill platforms to more effectively define these existing deposits and prospects, as well as explore for further high-grade shoots and provide critical underground infrastructure as Spartan develops its future mine plan.
Construction of the drill drive is on-track to commence in the September Quarter, with all regulatory mining approvals and support services in place. In addition, the Company has established an experienced on- site project team to manage and oversee the development and construction process. Establishment of the drill drive, and an initial underground drilling programme, is fully funded from the Company’s existing cash reserves.
Management Comment
Spartan Managing Director and Chief Executive Officer, Simon Lawson, said: “We are delighted to have Barminco on board to complete the construction of this new drill drive, which represents a very exciting initiative that will enable us to drill from platforms located right alongside our high-grade deposits and targets. This will provide for cheaper, more accurate and quicker drilling to continue to accelerate our Resource growth and conversion to Ore Reserves.
“All of the high-grade deposits and prospects discovered at Dalgaranga over the past two years remain open at depth – with mineralisation at the Never Never deposit now defined to beyond 1km below surface – and we’re very excited to get the underground rigs in place to help determine just how deep this high- grade mineralisation extends.
“Importantly, the drill drive is being constructed using the same dimensions as a standard underground mine development, ensuring it can be incorporated into our infrastructure planning for the future re- commencement of mining operations.
“Construction of the drill drive is set to kick-off later this Quarter and is expected to take approximately 10 months to complete. In addition, we will also shortly re-commence surface drilling programs, targeting the Pepper, Four Pillars, West Winds and other near-surface anomalies, ensuring plenty of exciting news- flow for shareholders in the months ahead.”
Click here for the full ASX Release
This article includes content from Spartan Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Boundiali Preliminary Metallurgical Test Work Delivers Gold Recoveries up to 99%
Highlights
- Excellent Gold Recovery: Bottle roll tests on 50 samples from BDT1 confirm gold mineralization is free milling, with cyanide leach recoveries consistently exceeding 93% for samples grading 0.25 g/t gold or higher
- Oxidized Ore Excels: Oxide samples exhibit exceptional gold recoveries, averaging 97.5% and reaching a maximum of 99%
- Consistent with Expectations: The metallurgical response aligns with typical free-milling ores found in similar deposits
- Further Testing Planned: Additional metallurgical work will be conducted to establish and optimise processing flowsheets
- Well-Funded: Aurum received firm commitments for a $17M Share Placement in June with Shareholders to vote on Tranche 2 on 6 August 2024
Aurum’s Managing Director Dr. Caigen Wang said: “Preliminary gold recoveries meet our expectations and confirm gold at BDT1 is highly amenable to standard cyanide leaching. While further work is needed, these are very encouraging results.
We are well funded following a recent Share Placement and Share Purchase Plan and rapidly expanding our drilling program at Boundiali. We will have six Aurum-owned diamond rigs running from the end of August as we target delivery of an initial JORC resource for Boundiali by the end of 2024.”
Metallurgical Test Work Summary
Preliminary test work involved 50 coarse reject samples from various depths, lithologies, and oxidation states at BDT1. Samples were prepared and analysed by Intertek laboratories in Ghana.
These samples were selected from a representative range of gold grades (likely to be encountered in an open pit), lithologies and oxidation states. Samples were selected from diamond core holes drilled by Aurum at BDT1 this year and cover a subset of that prospect over a volume bounded by 300m (east to west) and 550m (south to north) and down to 328m below surface (average depth of 106m below surface).
Preparation and analysis of the samples was undertaken by Intertek laboratories in Ghana. Samples were pulverized to 85% passing 75-micron (85% of the particles are smaller than 75 microns) and then subjected to a bottle roll cyanide leach for 24 hours using the cyanide (CL1000/AA) technique with an analysis on the leach liquor to measure the leach gold grade. The residue was then filtered and analysed by 50g fire assay (FA50T/AA) to show the remaining gold (tail grade). The sum of the leach grade and the tail grade represents the calculated head grade of the original sample (total gold). The calculated gold recovery is estimated by dividing the leach grade by the total gold grade.
Click here for the full ASX Release
This article includes content from Aurum Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Aurum Resources
Investor Insights
Aurum Resources offers a compelling value proposition with a highly prospective gold asset in an emerging gold region and a cost-effective exploration strategy.
Overview
Aurum Resources (ASX:AUE) is a mineral exploration company primarily focused on gold through its flagship Boundiali gold project located in Côte d’Ivoire, West Africa.
Côte d'Ivoire's gold mining sector is experiencing significant growth and development, with several key projects contributing to the country's economic expansion. The overall gold mining sector in Côte d'Ivoire is supported by substantial investments in infrastructure and exploration.
Geopolitically, Côte d'Ivoire outperforms most developing countries in the world in political, legal, tax and operational risk metrics. Additionally, Côte d'Ivoire continues to make notable strides in its political stability and Absence of Violence and Terrorism Index.
Aurum is led by a board and management team with considerable experience and a track record of success in the mining industry and a history of creating shareholder value.
Company Highlights
- Aurum Resources is a precious metals company with exploration prospects in the same greenstone belt as the Syama (11.5 Moz), Sissingué (1.0 Moz), Tongon (5.0 Moz) and Kone Gold (4.5 Moz) deposits of West Africa.
- Upcoming catalysts include a maiden mineral resource estimate expected to be completed by the end of 2024. The company believes mineralization is open at depth and along strike and highlights the existence of numerous gold mineralization targets within the large land holding of Aurum’s Boundiali Gold Project.
- Aurum operates its own drill rigs, allowing the company to significantly reduce its exploration costs relative to peers.
- Management has a track record of creating value for shareholders from exploration through to project development, mine construction and gold production.
- Strong leverage to increasing gold prices that will benefit from a declining interest rate environment and rising global geopolitical risk factors.
- Well funded for greater than 12 months and over 100,000 metres diamond drilling programs and metallurgical study
Key Project: Boundali Gold Project
The Boundiali gold project in Cote d’Ivoire is located within the Boundiali Greenstone Belt, which hosts Resolute’s Syama gold operation (11.5 Moz) and the Tabakoroni deposit (1 Moz) in Mali. Neighbouring assets also include Barrick’s Tongon mine (5 Moz) and Montage Gold’s Kone project (4.5 Moz).
The Boundiali project area covers the underexplored southern extension of the Boundiali belt, where a highly deformed synclinal greenstone horizon traverses finer-grained basin sediments, and to the west, Tarkwaian clastic rocks lie in contact with a granitic margin. The project benefits from year-round road access and excellent infrastructure.
The first stage of drilling at Boundiali occurred in the fourth quarter of 2023 and the first quarter of 2024 for both the BM and BD tenements (BM1 and BM2; BD1, BD2 and BD3 targets) and was designed to test below-gold-in-soil anomalies oriented along NE trending structures. Having completed its initial exploration program, Aurum is now ramping up and undertaking a scout and step-back diamond drilling campaign with plans to increase its drilling fleet to include six rigs targeting a drilling rate of ~10,000 metres per month. The company expects to drill more than 45,000 metres of diamond core at Boundali to support an inaugural mineral resource estimate that is anticipated by the end of 2024.Drilling costs are estimated at US$45 per metre, as Aurum owns all of its drilling rigs and employs its operators, representing a significant value proposition relative to peers who use commercial drilling companies that charge upwards of $200 per meter. The company believes there is potential for multi-million ounce gold resources to be defined with hundreds thousands meters of drilling over years within the Boundiali Gold Project’s land holding areas.
The Boundiali gold project comprises four contiguous granted licenses: PR0808 (80 percent interest), PR0893 (80 to 88 percent interest), PR414 (100 percent interest), and PR283 (70 percent interest). Historic exploration at PR0893 includes 93 AC drill holes and four RC holes. Airborne geophysical surveying, geological mapping and extensive soil sampling have also been performed at PR0893, while PR0808 has had 91 RC holes drilled for 6,229 metres along with geochemical analysis and modeling. Detailed geochemical sampling and drilling at PR414 revealed three strong gold anomalies and returned impressive high-grade results.
Management Team
Troy Flannery – Non-Executive Chairman
Troy Flannery has more than 25 years’ experience in the mining industry, including nine years in corporate and 17 years in senior mining engineering and project development roles. He has a degree in mining engineering, masters in finance, and first class mine managers certificate of competency. Flannery has performed non-executive director roles with numerous ASX listed companies and was the CEO of Abra Mining until October 2021. He has worked at numerous mining companies, mining consultancy and contractors, including BHP, Newcrest, Xstrata, St Barbara Mines and AMC Consultants.
Dr. Caigen Wang – Managing Director
Dr. Caigen Wang founded Tietto Minerals (ASX:TIE), where he led the company as managing director for 13 years through private exploration, ASX listing, gold resource definition, project study and mine building to become one of Africa’s newest gold producers at its Abujar gold mine in Côte d’Ivoire. He holds a bachelor, masters and PhD in mining engineering. He is a fellow of AusIMM and a chartered professional engineer of Institution of Engineer, Australia. Wang has 13 years of mining academic experience in China University of Mining and Technology, Western Australia School of Mine and University of Alberta, and over 20 years of practical experience in mining engineering and mineral exploration in Australia, China and Africa. Other professional experience includes senior technical and management roles in mining houses, including St. Barbara, Sons of Gwalia, BHP Billiton, China Goldmines PLC and others.
Mark Strizek – Executive Director
Mark Strizek has nearly 30 years’ experience in the resource industry, having worked as a geologist on various gold, base metal and technology metal projects. He brings invaluable geological, technical and development expertise to Aurum, most recently as an executive director at Tietto Minerals’, which progressed from an IPO to gold production at the Abujar gold project in West Africa. Strizek has worked as an executive with management and board responsibilities in exploration, feasibility, finance and development-ready assets across Australia, West Africa, Asia and Europe.
Brien Lundin: Gold to be Last Asset Standing, Price Outlook for End of Cycle
Speaking to the Investing News Network, Brien Lundin, editor of Gold Newsletter, explained what factors kicked off gold's price run earlier in 2024, and what could drive it even higher as the year continues.
He also shared his thoughts on why gold stocks haven't yet moved as much as investors might have hoped.
"When you would have expected (gold) to maybe drop a couple hundred dollars if the (US Federal Reserve) pivot was being postponed — instead we're about US$300 higher," he said on the sidelines of the Rule Symposium.
"So we're going to hopefully take off with that big new factor from a much higher price level."
Watch the interview for more from Lundin on gold and gold stocks, as well as silver.
You can also click here to view the Investing News Network's Rule Symposium playlist on YouTube. Recorded presentations from the Rule Symposium are available here.
Don't forget to follow us @INN_Resource for real-time updates!
Securities Disclosure: I, Charlotte McLeod, hold no direct investment interest in any company mentioned in this article.
Editorial Disclosure: The Investing News Network does not guarantee the accuracy or thoroughness of the information reported in the interviews it conducts. The opinions expressed in these interviews do not reflect the opinions of the Investing News Network and do not constitute investment advice. All readers are encouraged to perform their own due diligence.
Affiliate Disclosure: The Investing News Network may earn commission from qualifying purchases or actions made through the links or advertisements on this page.
Diamond Drilling Program Expanded and High-Grade M1 Intercept Returned
Warriedar Resources Limited (ASX: WA8) (Warriedar or the Company) is pleased to provide an update on drilling progress and assay results from its Golden Range Project, located in the Murchison region of Western Australia (Figure 1).
HIGHLIGHTS:
- Drilling activities along the ‘Golden Corridor’ progressing well; current Reverse Circulation (RC) program complete (28 holes for 5,024m) and diamond tails program expanded to 2,500m (approx. 1,900m complete across 19 holes).
- Represents the first diamond drilling undertaken at the 2.3km-long Ricciardo deposit, and the nearby M1 deposit, by any operator in ten years.
- Assay results for the first diamond hole at M1 (infill focus) were significantly higher grade than expected:
- 8.9m @ 8.93 g/t Au from 156m, incl. 2m @ 23.83 g/t from 158.3m
- M1 offers clear high-grade extension potential, which is planned to be a focus of further drilling in H2 2024.
- Diamond holes drilled beneath the Silverstone Central pit (Ricciardo), in an area with no historical drilling, returned:
- 7m @ 2.59 g/t Au from 229m, incl. 1m @ 10.81 g/t Au from 233.7m
- 4.6m @ 1.20 g/t Au from 235m
- Extensional RC drilling under the Eastern Creek pit (Ricciardo) returned:
- 7m @ 2.54 g/t Au from 170m, incl. 1m @ 7.48 g/t from 172m
- 9m @ 1.42 g/t Au from 180m
- Ricciardo and M1 both sit in the 25km-long ‘Golden Corridor’ at Golden Range, which hosts six discrete deposits (18 historic pits) that are all open at depth and possess immediate growth potential.
- Diamond drilling set to be completed in mid-August, with all assays expected by mid-September and update of the Ricciardo MRE targeted for Q4 2024.
- Further growth-focussed drilling of the ‘Golden Corridor’ planned for H2 2024.
The results reported in this release are for a further eight (8) of the diamond holes and the first nine (9) of the RC holes drilled in the current program (representing all outstanding results received to date). Results for the first four (4) diamond holes were previously reported (refer WA8 ASX release dated 3 July 2024). The new results continue to demonstrate the outstanding Mineral Resource Estimate (MRE) growth potential that exists at Ricciardo, M1, and along the broader ‘Golden Corridor’ trend.
Figure 1: The Golden Range and Fields Find Projects. Mines and projects within trucking distance of the Warriedar tenure are shown. The location of the Ricciardo deposit within the 25km-long ‘Golden Corridor’ at Golden Range is annotated.
M1 deposit
The M1 deposit is located 7km north of the Ricciardo deposit, and right alongside the existing processing plant (refer Figure 2); within the 25km long Golden Corridor trend.
Initial results have been returned from diamond tails drilled at the M1 deposit, with significant intersections returned in both holes. The holes were planned to test the existing MRE model,
Figure 2: The Golden Corridor within the Golden Range Project. The M1 deposit is located 7km north of the Ricciardo deposit. The image on the LEFT is gravity over shaded residual magnetic RTP.
potential parallel lodes and gaps within the MRE area. This drilling represents the first time this deposit has been revisited and drilled since 2013.
Hole M1RC191 was drilled in the centre of the modelled resource area and returned significantly higher grade than expected (refer Figure 3). This is an excellent result and aids Warriedar in the larger goal of building high-priority MRE areas for rapid development.
Click here for the full ASX Release
This article includes content from Warriedar Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
Latest News
Latest Press Releases
Related News
TOP STOCKS
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.