Discussions commenced with metal traders and smelters regarding offtake for Superior Lake Zinc Project

Discussions commenced with metal traders and smelters regarding offtake for Superior Lake Zinc Project

(TheNewswire)

Metallum Resources Inc.

HIGHLIGHTS

  • Discussions with multiple global metal traders and smelters have commenced regarding future offtake for the zinc and copper concentrates to be produced at the Superior Lake Project

    • Forecasted annual production of 69,819t of Zn and 5,308t of Cu concentrate per annum.

  • Both the zinc and copper concentrates are of a high quality with favorable grades and minimal deleterious elements (Table 1 and Table 2)

  • The Project has established transportation routes to North American and international smelters, giving the Project its unique location 30km from an operating rail terminal (Image 1)

  • The market outlook for zinc is strong, due to declining production from existing primary zinc mines, and increased forecasts on long-term demand driven by decarbonization

May 31, 2022 – TheNewswire - Metallum Resources Inc. (TSXV:MZN) ( "Metallum" or the "Company") is pleased to announce the commencement of discussions with multiple global metal traders regarding future offtake from the Company's Superior Lake Zinc and Copper Project ("Project") in Ontario, Canada.

Preliminary discussions with a number of these groups have indicated a willingness to have offtake linked to additional funding solutions. An offtake related financing is typically in the form of mezzanine debt or concentrate pre-payments.


Click Image To View Full Size

Image 1: Location of Zinc smelter in north America and transportation routes

The concentrate produced at Superior Lake can access smelters using existing rail and road infrastructure to North American smelters as well as smelters in Asia, using the Vancouver port. The Thunder Bay port, which is located 214km from the mine gate, will provide access to smelters in Europe. The Project's unique location and access to the Canadian rail and highway network will provide access to Canadian port systems, both East and West coasts, allowing easy access to major smelters around the globe.

Both the Zinc and Copper concentrates are well understood given the Project successfully operated for a decade before closing in 1998 due to sustained low zinc prices. This historical production as well as additional metallurgical test work carried out by SGS Lakefield in Canada (Superior Zinc and Copper Project Feasibility Study N.I. 43-101 compatible, DRA – October 2021), provides detailed information and certainty to these groups. Detailed information regarding the concentrate grades and quality can be found in Table 1 below.

Table 1: Historical Winston Lake Detailed Zinc Concentrate Specifications

Element

% (LOM Average)

Zn

54

Cu

0.6

Fe

11

Pb

0.01

S

32

Si0 2

0.5

Element

ppm (LOM Average)

Ag

40

As

Al 2 O 3

6500

Au

0.4

BaO

100

Bi

80

CaO

490

Cd

1,300

Cl

150

Cr

80

Co

100

F

300

Ge

20

Hg

5

In

330

MgO

1,900

Mn

1,500

Mo

Ni

25

Sb

20

Se

310

Sn

180

Te

1

Table 1: Historical Winston Lake Detailed Copper Concentrate Specifications

Element

Forecast LOM Average

Cu

24

Zn

7.5

Fe

29

Pb

0.07

S

35

Si0 2

1.1

Element

ppm (LOM Average)

Ag

344

As

110

Al 2 O 3

1,300

Au

12.9

BaO

270

Bi

230

CaO

570

Cd

180

Cl

70

Cr

100

Co

190

F

50

Ge

20

Hg

3

In

110

MgO

3,700

Mn

240

Mo

Ni

80

Sb

50

Se

300

Sn

170

Te

5

Qualified Person

The news release has been reviewed and approved by Andrew Tims, P.Geo., Exploration Manager of the Company, and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects .

ON BEHALF OF THE BOARD

For further information, contact:

Kerem Usenmez, President & CEO

Tel: 604-688-5288;  Fax: 604-682-1514

Email: info@metallumzinc.com

Website: metallumzinc.com

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Certain statements contained in this news release constitute forward-looking statements within the meaning of Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-looking statements and include, without limitation, statements about the estimated economics of the Project, potential offtake related financing, and the Company's development plans for the Project. Often, but not always, these forward looking statements can be identified by the use of words such as "estimate", "estimates", "estimated", "potential", "open", "future", "assumed", "projected", "used", "detailed", "has been", "gain", "upgraded", "offset", "limited", "contained", "reflecting", "containing", "remaining", "to be", "periodically", or statements that events, "could" or "should" occur or be achieved and similar expressions, including negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by forward-looking statements. Such uncertainties and factors include, among others, the uncertainties inherent in the estimated economics of the Project, and whether the Company will arrange any offtake related financing; whether exploration and development of the Company's properties will proceed as planned; changes in general economic conditions and financial markets; the Company or any joint venture partner not having the financial ability to meet its exploration and development goals; risks associated with the results of exploration and development activities, estimation of mineral resources and the geology, grade and continuity of mineral deposits; unanticipated costs and expenses; risks associated with COVID-19 including adverse impacts on the world economy, exploration and development efforts and the availability of personnel; and such other risks detailed from time to time in the Company's quarterly and annual filings with securities regulators and available under the Company's profile on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to: the accuracy of the estimated economics of the Project; that the Company will arrange offtake related financing; that the Company's stated goals and planned exploration and development activities will be achieved; that there will be no material adverse change affecting the Company or its properties; and such other assumptions as set out herein. Forward-looking statements are made as of the date hereof and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on forward-looking statements.

ABOUT Metallum Resources

Metallum Resources (MZN.TSXV ) owns 100% of the Superior Lake Zinc and Copper Project in Ontario, Canada.  The Project ranks as the highest-grade zinc project in North America with a resource of 2.35 Mt at 17.9% Zn, 0.9% Cu, 0.4 g/t Au and 34 g/t Ag.

The Company completed a positive Feasibility Study that highlights the Project will rank in the lowest quartile of operating costs (C1 costs – C$0.44 / lb; AISC C$0.51 / lb).  These low costs driven by the high grade of the Project drive robust economic returns. The majority of permits and licenses are in place allowing for a quick re-development following a Final investment Decision.

For further details about the Company and the Superior Project, please visit the Company's website at metallumzinc.com .


Click Image To View Full Size

Copyright (c) 2022 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

MZN:CA
The Conversation (0)
Metallum signs Negotiation Agreement with the Pays Plat First Nation

Metallum signs Negotiation Agreement with the Pays Plat First Nation

(TheNewswire)

Metallum Resources Inc.

HIGHLIGHTS

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources: Copper and Zinc, CEO Clip Video

Metallum Resources: Copper and Zinc, CEO Clip Video

Metallum Resources Inc. (TSXV: MZN) (OTCQB: MTLLF is developing a high-grade zinccopper project in Ontario. BTV chats with President & CEO, Kerem Usenmez to learn more.

Metallum Resources Inc.(TSXV: MZN) (OTCQB: MTLLF)

https://www.metallumzinc.com/

About CEO Clips:

CEO Clips is the largest library of publicly traded company CEO videos in Canada and the US. These 60 second video profiles broadcast on national TV and online via 12 financial sites including: Thomson Reuters, Bloomberg, Yahoo! Finance and Stockhouse.com.

BTV - Business Television/CEO Clips

Discover Companies to Invest in

www.b-tv.com

Contact: Trina Schlingmann (604) 664-7401 x 5 trina@b-tv.com

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/127151

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
NPV increases to C$383M with average EBITDA of C$102m pa for Superior Lake Zinc Project

NPV increases to C$383M with average EBITDA of C$102m pa for Superior Lake Zinc Project

(TheNewswire)

Metallum Resources Inc.

HIGHLIGHTS

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources completes $5.2 million private placement to advance the development of the Superior Lake Zinc Project and Board changes

Metallum Resources completes $5.2 million private placement to advance the development of the Superior Lake Zinc Project and Board changes

(TheNewswire)

Metallum Resources Inc.

April 21, 2022 TheNewswire - Vancouver, British Columbia: Metallum Resources Inc. (TSXV:MZN) is pleased to report that it has closed its previously announced non-brokered private placement with the issuance of 87,371,674 units at $0.06 each, for gross proceeds of $5,242,300.  Each unit consists of one common share of the Company and one warrant which entitles the holder to purchase one additional common share at $0.14 for two years from closing.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources increases proposed non-brokered private placement financing to $5.242 million

Metallum Resources increases proposed non-brokered private placement financing to $5.242 million

(TheNewswire)

Metallum Resources Inc.

April 8, 2022 TheNewswire - Vancouver, British Columbia - Metallum Resources Inc. (TSXV:MZN) is pleased to report that its previously announced non-brokered private placement has been oversubscribed and, subject to TSX Venture Exchange approval, has been increased to 87.37 million units at $0.06 each, to raise gross proceeds of up to $5.242 million. Each unit consists of one common share of the Company and one warrant which will entitle the holder to purchase one additional common share at $0.14 for two years from closing.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Bold Ventures Identifies New Gold Zone at Its Burchell Gold and Copper Property

Bold Ventures Identifies New Gold Zone at Its Burchell Gold and Copper Property

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") is pleased to announce that it has received assays up to 56.9 gt gold (Au) from a newly identified zone at its Burchell Property ("the Property"), sampled during a prospecting and field reconnaissance program in November of this year. The high-grade sample was collected approximately 15 meters southwest of 2023 samples which returned between 0.04 and 0.51 gt Au. The zone has now been named the 111 (one-eleven) Zone. A geological sketch map of the outcrop exposure was made and three grab samples were collected along or near the zone during the 2024 program (see Table 1 below for coordinates, descriptions, and results). Assay results ranged from

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Power-up Gravity Gold Plant at Reward

Vertex Minerals Limited Power-up Gravity Gold Plant at Reward

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX) (OTCMKTS:VTXXF) is pleased to announce an update on the Reward Gold mine start up, with powering the plant up now completed and mechanical commissioning underway.

The processing facility rebuild, refurbishment and installation has progressed safely, efficiently and to plan, with the focus now turning to dry and wet commissioning of the respective operating circuits.

HIGHLIGHTS

- Vertex power up the newly installed Gravity Gold plant at the Reward Gold Mine.

- The Power generation units have now been installed and plugged into the Gravity plant.

- The plant components are now all installed and connected electrically.

- Completion of the dry stack tailing storage facility and tailings pipework installation.

- The plant can now be started up and mechanically tested and operated.

- Wet commissioning and ore feed commissioning will follow.

- Ore Sorter installation will be a retrofitted in early January

- Commissioning will be with stockpiled gold ore located alongside the gold plant

Vertex's Executive Chairman, Roger Jackson, said: "On time and within budget, the refurbishment and installation activities at the Reward gravity gold processing plant are almost complete with power up testing now underway. Our focus is now switching to dry and wet commissioning in the lead up to first gold next month. This is an exciting milestone for the company given the quality of the plant and the low capex required to get to this stage".

The Reward gold mine is well placed for a simple start -up:

- The new processing plant has been installed adjacent to the underground mine portal (640 Level) and over the existing footprint of the existing plant

- The 640 Level extends into the resource and no stripping required.

- Second egress in place with existing ladder way from 640 Level to surface.

- Some underground fleet and utility services are already owned by Vertex. With new fleet arriving.

*To view photographs, please visit:
https://abnnewswire.net/lnk/B92995G8



About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.



Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Osisko Metals Announces Closing of C$107.4 Million "Bought Deal" Private Placement

Osisko Metals Announces Closing of C$107.4 Million "Bought Deal" Private Placement

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Osisko Metals Incorporated (the " Company " or " Osisko Metals ") (TSX-V: OM; OTCQX: OMZNF; FRANKFURT: OB51) is pleased to announce that it has closed its previously-announced "bought deal" brokered private placement offering (the " Offering ") for aggregate gross proceeds of C$107.4 million, including the partial exercise the option granted to the Underwriters (as defined herein). In connection with the Offering, the Company issued an aggregate of (i) 70,326,229 flow-through units of the Company (" FT Units ") consisting of 64,215,117 FT Units at an issue price of C$0.50 per FT Unit and 6,111,112 FT Units at an issue price of C$0.54 per FT Unit, for aggregate gross proceeds of C$35,407,558.98 and (ii) 277,051,466 units of the Company (" HD Units ") at a price of C$0.26 per HD Unit, for aggregate gross proceeds of C$72,033,381.16.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Noble Minerals Announces Update to Drilling Results from Noble Minerals-Canada Nickel Joint Venture on Mann Twp

Noble Minerals Announces Update to Drilling Results from Noble Minerals-Canada Nickel Joint Venture on Mann Twp

(TheNewswire)

Noble Mineral Exploration Inc.

Highlights

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×