Beyond Lithium Finds Three Beryl Bearing Pegmatites with Elevated Lithium Muscovite Samples at Gathering Lake Project

Beyond Lithium Finds Three Beryl Bearing Pegmatites with Elevated Lithium Muscovite Samples at Gathering Lake Project

HIGHLIGHTS 

  • Assays from muscovite samples from pegmatites at the Gathering Lake South project show up to 2,075 ppm lithium (0.208%). 

  • Summary of recent exploration at Gathering Lake: 

    • Fifteen new pegmatites mapped and three new beryl bearing pegmatites discovered. 

    • Additional 49 more grab samples sent to the lab and 86 more LIBS samples taken. 

    • Two new trends along the regional batholith-sediment contact orientation established. 

  • Additional news: 

    • Prospected the three projects located in the Case Lake area and identified and sampled eight prospective pegmatites. 

    • Most recent exploration at the Cosgrave Lake project resulted in an additional 50 pegmatites being mapped, 71 rock samples sent to the lab and about 100 LIBS samples taken. 

    • Received the final LiDAR survey DEM and files for the Wisa Lake Project. 

  • Beyond Lithium releases interview with President & CEO Allan Frame explaining the significance of today's announcement: https://youtu.be/fn-6Z3SNfFM.

Winnipeg, Manitoba--(Newsfile Corp. - August 24, 2023) - Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce the results of a recent exploration program at one of its many properties located in the Georgia Lake district in Ontario. Beyond Lithium has three properties totalling 6,948 ha in the northeast of the district, namely Gathering Lake South (3,864 ha), Gathering Lake East (986 ha), and the Gathering Lake West (2,098 ha) (Figure 1 and 2) which were the focus of the Company's most recent exploration work. The projects are located in the northeastern region of the Georgia Lake district which is associated with the regional source of LCT pegmatite formation and fractionation, the Glacier Lake batholith.

The exploration program consisted primarily of detailed sampling and mapping at the Gathering Lake South project which led to the discovery of three new beryl-bearing pegmatites with elevated Li muscovite samples. The Company also identified and mapped fifteen new pegmatites and established two new trends following the regional batholith-sediment contact orientation.

Regional samples in the Georgia Lake area were collected in 2008 by Frederick W Breaks Ph. D. for the Ontario Geological Survey1. Results of his research into the rare-element pegmatite and related S-type peraluminous granites in the area outlined an anomalous zone of Cesium (Cs) greater than 15 ppm and Rubidium (Rb) greater than 300 ppm which coincides with most of the known rare-element mineral occurrences in the Gathering Lake area. The two newly identified trends at Beyond Lithium's Gathering Lake South project also envelops samples with Cs of greater than 15 ppm and Rb greater than 300 ppm extending Breaks' rare-element anomalous zone in the area for the potential to explore for new rare-element or LCT pegmatites within the Gathering Lake South project.

"A total of twenty-five samples were collected across our three Gathering Lake projects in June as part of our Phase 1 exploration program (Figure 2)," said Lawrence Tsang, VP Exploration for Beyond Lithium. "Of particular interest were four muscovite samples collected from pegmatites outcrops at the Gathering Lake South project which showed assays up to 1,477 and 2,075 ppm (0.148% and 0.208%) in lithium."

"The results published today are significant as they suggest these samples are likely related to beryl-spodumene pegmatites as lithium contents for muscovite from a spodumene pegmatite is usually greater than 1,000 ppm Li and lithium contents for muscovite from a fertile granite is greater than 200 ppm Li. These estimates are based on data collected by Frederick W. Breaks in 2003 and published in a report published by the Ontario Geological Survey2."

Mr. Tsang added: "After evaluating the results which showed the elevated lithium in the muscovite samples and the higher fractionated samples in the southern part of the project, a five day follow up program was carried out by Beyond Lithium team for detailed mapping and sampling at the Gathering Lake South project. The follow up program mapped 15 new pegmatites with local pegmatites measuring up to 20m wide around the south-central area. The crews also discovered three new beryl-bearing pegmatites marked as green stars in the Figure 4 below. The follow up program also collected an additional of 49 grab samples which have been sent to the lab and 86 LIBS samples taken."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_004.jpg
Figure 1. The Georgia Lake District

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_004full.jpg

"I could not be more pleased with the progress made by our technical team thus far in 2023," said Allan Frame, President and CEO. "During my 47-year career in the investment business I had the benefit of financing and being associated with multiple major discoveries, including the Snip Deposit now owned by Skeena Resources Ltd. All of these discoveries had one thing in common: an experienced technical team focused on the long-term success of the company. We have such a team at Beyond Lithium. The progress they are making on several of our 64 properties is clearly refining our exploration plans which in the fall will include drilling."

He concluded: "It is important for our shareholders to keep in mind that while we are as anxious as they are to share all assay results as they come in, it is sometimes a better course of action to first consolidate our land position either through staking, optioning or both in certain districts. This can take several weeks, most of which is now behind us. We look forward to sharing additional assay results in the near term."

Geological information on the Gathering Lake area

According to 2003 Ontario Geological Survey report by Breaks2, the northeastern Glacier Lake batholith, where the Gathering Lake projects are located, is significantly more peraluminous or in other words is more fractionated with higher rare-element contents than the southwestern region with A/CNK value varies between 1.00 to 1.98 and is linked to the Gathering Lake pegmatite group including the Nelson and the Koshman spodumene bearing pegmatite showings with grab samples up to 3.22% and 2.88% Li2O illustrated as the Li Showing in the map below (Figure 2)3.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_005.jpg

Figure 2. Location of the Gathering Lake Projects and Phase 1 Samples Location

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_005full.jpg

Potassium (K) over Rubidium (Rb) expressed as a ratio (K/Rb) versus Cesium variation plot of samples is a common and convenient diagram to display the fractionation trend or the relative degree of evolution of S-type, peraluminous granites and related pegmatite granites and the rare-element pegmatite groups that fractionated from the parent granitic rocks. With increasing fractionation of the pegmatite-forming melt, the compositions of the potassium feldspar and mica become more enriched in rubidium and cesium thus the fractionation trend points to the lower right corner of the plot as the higher fractionated area.

The K/Rb vs Cs plot of the 25 samples in comparison with the samples collected by Breaks1 from the SW and the NE Glacier Lake batholith and the Gathering Lake pegmatite group established a gradual fractionation trend at the Gathering Lake projects in relation to the Glacier Lake batholith and outlined a higher fractionated sample with 192 ppm Cs was located in the south-central part of the Gathering Lake South project closely related to the highly fractionated sample from the nearby known Gathering Lake pegmatite group (Figure 3).This sample supports the potential presence of more fractionated pegmatites with higher rare-element contents in the Gathering Lake South area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_006.jpg

Figure 3. K/Rb vs Cs Plot of the Gathering Lake Project Samples with Glacier Lake Batholith and Gathering Lake Pegmatite Group (Breaks 2008)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_006full.jpg

Moreover, the detailed mapping from the follow up program mapped out two East-West trending sediments packages in contact with the batholith. These batholith-sediments contacts coincide with the greater than 15 ppm Cs zone established by Breaks in the area and the three newly discovered beryl bearing pegmatites on the project. The alignment of these beryl pegmatites with the elevated Li muscovite samples and the higher fractionated sample following the batholith-sediment contact delineated two new E-W exploration trends at the Gathering Lake South project outlined in orange in Figure 4.

These E-W orientated contacts between the batholith and sediment are good host and fluid pathway for the formation and the fractionation of pegmatites. As most LCT pegmatites bodies that have been discovered so far show some sort of structural control. Pegmatites tend to be intruded along faults, fractures, foliation and bedding or concordant with the regional foliation in the metamorphic host rock, like the metasediment in contact with the batholith in the Gathering Lake area4. These batholith-sediment contacts and the main foliation orientation in the host rocks become the obvious follow up exploration direction in the area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_007.jpg

Figure 4. Gathering Lake Projects Exploration Trends and New Beryl Pegmatite Locations

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_007full.jpg

Summary of Case Lake Phase 1 Exploration

Beyond Lithium's properties in the Case Lake area are Stimson (1,630 ha), Case Lake South (2,711 ha), and Case Lake North (7.476 ha). Beyond Lithium field crew prospected the three projects last week and was able to locate and sample a few prospective pegmatites at the Case Lake South and North projects. This short program allowed us to assess the accessibility of the three projects and the few samples we collected will give us a baseline for geochemistry of the projects.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_008.jpg

Figure 5. Case Lake Area Projects: Stimson, Case Lake South, and Case Lake North

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_008full.jpg

Summary of the Cosgrave Lake Project Most Recent Exploration

On August 1st, 2023, Beyond Lithium announced the discovery of an LCT pegmatite intrusive stock covering an area of over 266 hectares, which is comparable in size to the MNW pluton (351 ha) and the Pine Portage pluton (311 ha). The analogous size of this discovery to other fertile plutons strongly suggests that it has generated substantial amounts of concentrated fluids and volatiles, serving as the source of lithium and rare earth minerals in lithium pegmatite formations in the vicinity.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_009.jpg

Figure 6. Beyond Lithium Geological Map of the Cosgrave Lake Project Outlining the 11 km Main NE-SW Trend Conformable to the Sediment Contact

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_009full.jpg

Further to the discovery, Beyond Lithium sent crews to the project for further exploration which resulted in an additional 50 mapped pegmatites, 71 rock samples sent to the lab and about 100 LIBS samples taken.

Summary of Wise Lake LiDAR Survey

A LiDAR survey was completed for the Wisa Lake Lithium project next to the Green Technology Metals' Wisa Project. The final has been delivered for interpretation. The LiDAR data will be a useful exploration tool for identifying potential outcrop and structure on the project. LiDAR is a remote sensing method that is utilized to create digital terrain (DTM) and DEM of the landscape. As the topography of the area is generally flat, a subtle change to elevation high may indicate pegmatite outcrops or features worthwhile to prospect. The Beyond Lithium team will begin the interpretation of the LiDAR data and shortly come up with an exploration plan for the Wisa Lake Project.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_010.jpg

Figure 7: Wisa Lake Project Hillshade Map from the LiDAR Survey

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/178353_8e87467ad4885aeb_010full.jpg

Sources:

1 Breaks, F.W., Selway, J.B. and Tindle, A.G. 2008. The Georgia Lake rare-element pegmatite field and related S-type, peraluminous granites, Quetico Subprovince, north-central Ontario; Ontario Geological Survey, Open File Report 6199, 176p.

2 Breaks, F.W., Selway, J.B. and Tindle, A.G. 2003. Fertile peraluminous granites and related rare-element mineralization in pegmatites, Superior Province, northwest and northeast Ontario: Operation Treasure Hunt; Ontario Geological Survey, Open File Report 6099, 179p.

3 Pleson, A.J., 2019. Technical Report On the Gathering Lake Lithium Pegmatite Property.

4 Bradley, Dwight, and McCauley, Andrew, 2013, A preliminary deposit model for lithium-cesium-tantalum (LCT) pegmatites (ver. 1.1, December 2016): U.S. Geological Survey Open-File Report 2013-1008, 7 p., https://doi.org/10.3133/ofr20131008.

Quality Assurance/Quality Control

All collected rock samples were put in sturdy plastic bags, tagged, and sealed at site. Sample bags were then put in rice bags and kept securely before being sent by road transport or delivered by the crew supervisor to SGS's preparation facility in Red Lake or Sudbury, Ontario, for sample preparation. Pulps are analyzed at the SGS facility in Burnaby, BC. All samples are analyzed with Four-Acid Digestion/Combined ICP-AES/MS package (49 elements). The QA/QC protocol included the insertion and monitoring of appropriate reference materials, in this case high concentration and low concentration certified OREAS and CDN lithium standards to validate the accuracy and precision of the assay results.

Qualified Person and Third-Party Data

The scientific and technical information in this news release has been reviewed and approved by Lawrence Tsang, P.Geo., VP Exploration of the Company. Lawrence Tsang is a "qualified person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Beyond Lithium Inc.

Beyond Lithium Inc. is the largest greenfield lithium exploration player in Ontario with 64 high potential greenfield lithium properties totalling over 150,000 hectares. The Company has adopted the project generator business model to maximize funds available for exploration projects, while minimizing shareholder dilution. Beyond Lithium is advancing certain of its projects with its exploration team and will seek to option other properties to joint venture partners. Partnering on various projects will provide a source of non-dilutive working capital, partner-funded exploration, and long-term residual exposure to exploration success.

Beyond Lithium currently has 28,259,658 common shares outstanding.

Please follow @BeyondLithium onTwitter, Facebook, LinkedIn, InstagramandYouTube.

For more information, please refer to the Company's website at www.beyondLithium.ca

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding future capital expenditures, anticipated content, commencement, and cost of exploration programs in respect of the Company's projects and mineral properties, anticipated exploration program results from exploration activities, resources and/or reserves on the Company's projects and mineral properties, and the anticipated business plans and timing of future activities of the Company, are forward-looking information. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Often, but not always, forward-looking information can be identified by words such as "pro forma", "plans", "expects", "will", "may", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. In stating the forward-looking information in this news release, the Company has applied several material assumptions, including without limitation, that market fundamentals will result in sustained precious and base metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration of the Company's properties, the availability of financing on suitable terms, and the Company's ability to comply with environmental, health and safety laws.

Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the statements of forward-looking information. Such risks and other factors include, among others, statements as to the anticipated business plans and timing of future activities of the Company, the proposed expenditures for exploration work on its properties, the ability of the Company to obtain sufficient financing to fund its business activities and plans, delays in obtaining governmental and regulatory approvals (including of the Canadian Securities Exchange), permits or financing, changes in laws, regulations and policies affecting mining operations, risks relating to epidemics or pandemics such as COVID-19, the Company's limited operating history, currency fluctuations, title disputes or claims, environmental issues and liabilities, as well as those factors discussed under the heading "Risk Factors" in the Company's prospectus dated February 23, 2022 and other filings of the Company with the Canadian securities regulatory authorities, copies of which can be found under the Company's profile on the SEDAR website at www.sedar.com.

Readers are cautioned not to place undue reliance on forward-looking information. The Company undertakes no obligation to update any of the forward-looking information in this news release except as otherwise required by law.

For further information, please contact:

Allan Frame
President and CEO
Tel: 403-470-8450
Email: allan.frame@beyondLithium.ca

Jason Frame
Manager of Communications
Tel: 587-225-2599
Email: jason.frame@beyondLithium.ca

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/178353

News Provided by Newsfile via QuoteMedia

BY:CC
Beyond Lithium

Beyond Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Beyond Lithium (CSE:BY)

Beyond Lithium


Keep reading...Show less
Beyond Lithium Announces Flow-Through Offering for Gross Proceeds Of $500,000

Beyond Lithium Announces Flow-Through Offering for Gross Proceeds Of $500,000

Beyond Lithium Inc. (CSE:BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium"), today announced a proposed non-brokered private placement of 2.5 million common shares of the Company that will qualify as "flow-through shares" (within the meaning of subsection 66 (15) of the Income Tax Act (Canada) (the "Flow-Through Shares") at a price of $0.20 per share for aggregate gross proceeds of $500,000 (the "Offering").

The gross proceeds from the Offering will be used by the Company to incur eligible "Canadian exploration expenses" that will qualify as "flow-through critical mineral mining expenditures" as such terms are defined in the Income Tax Act (Canada) (the "Qualifying Expenditures") related to the Company's projects in Ontario. All Qualifying Expenditures will be renounced in favour of the subscribers of the Flow-Through Shares effective December 31, 2024.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce that the Company and its exploration team have been awarded the prestigious 2023 Bernie Schnieders Discovery of the Year Award for the spodumene discovery at its Victory Project in Ontario, Canada.

The award, presented by the Northwestern Ontario Prospectors Association (NWOPA), annually recognizes an exceptional discovery in Northwestern Ontario during the previous calendar year. It was presented on April 24 to Beyond Lithium and its exploration team at the annual awards banquet hosted during the 2024 Ontario Prospectors Exploration Showcase in Thunder Bay, Ontario. Past recipients of this prestigious award include Great Bear Resources Inc., Frontier Lithium Inc. and Delta Resources Ltd.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Finalizes Make up of Lithium Exploration Portfolio in Ontario

Beyond Lithium Finalizes Make up of Lithium Exploration Portfolio in Ontario

Highlights

  • No option cash payments due until August 31st, 2024.
  • The four primary projects are: the Victory Spodumene, the Ear Falls Spodumene, the Cosgrave Lake, and the Wisa Lake Projects where the exploration priorities will include advanced mapping and sampling programs to delineate more targets for mechanical stripping as well as diamond drilling.
  • Beyond Lithium's 2024 portfolio will consist of a total of 27 projects totalling over 119,000 hectares each either meriting further exploration or are part of joint venture and option discussions with interested parties.
    • Four primary projects.
    • Additional 23 projects located within well-known districts with significant LCT pegmatites discoveries and deposits.
  • Continue to engage and consult with the Ontario Ministry of Mines and the Aboriginal Communities as part of its current Exploration Permit applications for the Ear Falls Spodumene and the Victory Spodumene Projects.

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium"), today announced the list of projects which will form part of its exploration portfolio going into the 2024 season. The Company also announced that it has entered into a binding letter of intent with Bounty Gold Corp. ("Bounty Gold") and Last Resorts Resources Ltd. ("Last Resort") to amend the terms of the March 30, 2023 option agreements between the parties (the "March 2023 Agreements").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Announces 2024 Strategic Plan

Beyond Lithium Announces 2024 Strategic Plan

Highlights

  • Plan to advance the four primary projects, the Ear Falls Spodumene, the Victory Spodumene, the Cosgrave Lake, and the Wisa Lake Projects with diamond drilling and advanced mapping and sampling programs to delineate more targets for mechanical stripping and further diamond drilling.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Announces Shares for Debt Transactions

Beyond Lithium Announces Shares for Debt Transactions

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") announces that it has agreed to settle debts relating to certain consulting fees owed to two arm's length parties by issuing an aggregate of 171,554 common shares of the Company at a deemed price of $0.185 per share, representing an aggregate value of $31,737.50 (the "Debt Settlement").

All common shares to be issued pursuant to the Debt Settlement will be subject to the statutory hold period of four months and one day from their date of issuance and 58,750 of the shares shall be subject to additional contractual hold period expiring on July 10, 2024.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
GMV Minerals Inc. Files Notice of Intent to Drill Daisy Creek Project in Lander County, Nevada

GMV Minerals Inc. Files Notice of Intent to Drill Daisy Creek Project in Lander County, Nevada

GMV Minerals Inc. (the "Company" or "GMV") (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce that it has filed permitting documentation with the Bureau of Land Management (BLM) for GMV's Daisy Creek lithiumuranium project in Lander County, Nevada

The Notice of Intent (NOI) covers a six hole drill program up to a total depth of 3000 feet and focuses on the most prospective lithium targets as defined by recent geophysical work. Upon approval and receipt of permits, GMV is targeting to drill its Daisy Creek project in June/July 2024 and will provide further updates as new information comes available.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
South Star Battery Metals Announces Appointment of Richard Vigil as Vice President of Operations

South Star Battery Metals Announces Appointment of Richard Vigil as Vice President of Operations

South Star Battery Metals Corp. ("South Star" or the "Company") (TSXV:STS)(OTCQB:STSBF), is pleased to announce that Richard Vigil has been appointed as Vice President of Operations of the Company

Mr. Vigil is a mining engineer with an MBA specializing in international business and finance. He has 15 years of experience evaluating mines and projects globally but with a focus on the Americas. His expertise includes assessing the technical and economic merits of operations/projects and risks for international banks, stream and royalty companies, and being an independent technical mining consultant. He has evaluated mines/projects in graphite, gold, silver, lead, zinc, copper, uranium, molybdenum, iron ore, and metallurgical coal. His background as both a mining engineer in operations and as a technical advisor will contribute to Santa Cruz's ramp-up and expansion, as well as BamaStar's advancement from studies to the future planned production. His technical focus has been on mining methods, mine design, resource and reserve estimation, processing, market studies, National Instrument 43-101 reports, risk assessment, OPEX/CAPEX/margin analysis, and corporate advisory. He went to the Colorado School of Mines and Tulane University, and is US based.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
ALX Resources Corp. Announces Hydra Lithium Project Exploration Update

ALX Resources Corp. Announces Hydra Lithium Project Exploration Update

alx resources corp. (TSXV: AL) (FSE: 6LLN) (OTC: ALXEF) ("ALX" or the "Company") is pleased to announce that planning is underway for 2024 summer exploration at the Hydra Lithium Project ("Hydra") located in the Eeyou Istchee-James Bay region of Quebec, Canada. Hydra is the subject of a joint venture between ALX and Forrestania Resources Limited of West Perth, Australia ("Forrestania", ASX: FRS) formed to explore for lithium-cesium-tantalum ("LCT") bearing pegmatites, with ALX as operator.

2024 Hydra Exploration Plans

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Lancaster Resources Receives Drill Permit Approval for Alkali Flat Lithium Brine Project

Lancaster Resources Receives Drill Permit Approval for Alkali Flat Lithium Brine Project

Lancaster Resources Inc. (CSE:LCR) (OTCQB:LANRF) (FRA:6UF0) (" Lancaster ") announces that the New Mexico Mining and Minerals Division (" MMD ") has provided Lancaster with a "Technically Complete Letter" regarding a permit for the Alkali Flat Lithium Brine Phase 1 drill program (the " Drill Permit ").

"The approval of our maiden drilling application is confirmation of our commitment to responsible, minimal impact exploration and the last major hurdle before launching our maiden drilling program at Alkali Flat," says Andrew Watson, Lancaster's VP Engineering & Operations. "We are one step closer to drilling the first well at Alkali Flat and proving the quality of the potential lithium brine deposit we believe is in the subsurface aquifers previously identified by our geophysics program."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
CleanTech Lithium to Present at Metals & Mining Virtual Investor Conference May 1st

CleanTech Lithium to Present at Metals & Mining Virtual Investor Conference May 1st

CleanTech Lithium (OTCQX:CTLHF, AIM:CTL), an exploration and development company advancing sustainable lithium projects in Chile, today announced that Steve Kesler, Executive Chairman, will present live at the Metals & Mining Virtual Investor Conference hosted by VirtualInvestorConferences.com, on May 1 st .

DATE : May 1 st
TIME: 10:00AM
LINK: https://bit.ly/3ISIVUN
Available for 1x1 meetings: May 1 st /May 2 nd

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Victory Sells Tahlo Lake Property in British Columbia

Victory Sells Tahlo Lake Property in British Columbia

Victory Battery Metals Corp. (CSE:VR)(FWB:VR61)(OTC PINK:VRCFF) ("Victory" or the "Company") is pleased to announce its sale of its Tahlo Lake, British Columbia property to a private company, Trimera Metals Corp., of Vancouver, British Columbia

Highlights of the Tahlo Lake Sale:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Beyond Lithium

Beyond Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×