Colombian Mines Expands Yarumalito Drill Program to Follow-up Encouraging Results

Silver Investing

Colombian Mines Corporation (TSX VENTURE:CMJ) announced that due to encouraging results, the drill program at Yarumalito is being expanded with the addition of an LF-70 drill from contractor GEOVAL S.A.S., providing greater depth capabilities than the man-portable rigs used on the property to date.

Colombian Mines Corporation (TSX VENTURE:CMJ) announced that due to encouraging results, the drill program at Yarumalito is being expanded with the addition of an LF-70 drill from contractor GEOVAL S.A.S., providing greater depth capabilities than the man-portable rigs used on the property to date.

The press release is quoted as saying:

Through mid-July, the Company completed 2,522 meters of core drilling in, and around, the La Escuela target area. This drilling has consistently intersected broad zones of gold-copper mineralization, including 141.4 meters averaging 0.77 grams per metric tonne (g/T) gold in YAR-11.

Click here to access the entire press release

Click here to access Colombian Mines Corporate Site

The Conversation (0)
×