Great Bear Completes Phase 1 Grid Drilling to 450 m Depth at LP Fault: 440 Holes, 222,500 m Drilled Since May 2019 Discovery
Great Bear Provides Assays Across Width of LP Fault Zone, Drills Separate Intervals of 400.00 g/t Gold Over 0.50 m and 2.23 g/t Gold Over 77.40 m in Same Hole
Great Bear Provides Two New Detailed High-Grade Long Sections and Reaches 318 Drill Holes Reported on Two Year Anniversary of LP Fault Discovery
Great Bear Provides First Detailed High-Grade Long Section, Drills 22.79 g/t Gold Over 4.80 metres from Bedrock Surface, and Reaches 300 Reported LP Fault Drill Holes
Great Bear to Host a Webinar on Monday, June 7 at 11:00am PDT/ 2:00pm EDT to Provide a Company Update on the Dixie Project Drill Program
Great Bear Reports Successful LP Fault Extension and Infill Drilling: 10.50 g/t Gold Over 13.10 m, 16.50 g/t Gold Over 6.25 m, and 11.18 g/t Gold Over 6.75 m
Great Bear Doubles Vertical Extent of LP Fault, Intersects High-Grade Gold at 942.20 m Downhole: 15.57 g/t Gold Over 3.05 m
Great Bear Drills 29.17 g/t Gold Over 15.50 m and 18.08 g/t Gold Over 15.80 m From Bedrock Surface at LP Fault
Noble Mineral highlights Successful Exploration Results announced by Canada Nickel, including Highest Grade to Date at Mann West
CHARBONE Hydrogen and ABB Sign Agreement to Advance North American Green Hydrogen Production Facilities
CHARBONE Hydrogene et ABB signent une entente pour accelerer les usines de production d'hydrogene vert en Amerique du Nord