Great Bear Completes Phase 1 Grid Drilling to 450 m Depth at LP Fault: 440 Holes, 222,500 m Drilled Since May 2019 Discovery
Great Bear Provides Assays Across Width of LP Fault Zone, Drills Separate Intervals of 400.00 g/t Gold Over 0.50 m and 2.23 g/t Gold Over 77.40 m in Same Hole
Great Bear Provides Two New Detailed High-Grade Long Sections and Reaches 318 Drill Holes Reported on Two Year Anniversary of LP Fault Discovery
Great Bear Provides First Detailed High-Grade Long Section, Drills 22.79 g/t Gold Over 4.80 metres from Bedrock Surface, and Reaches 300 Reported LP Fault Drill Holes
Great Bear to Host a Webinar on Monday, June 7 at 11:00am PDT/ 2:00pm EDT to Provide a Company Update on the Dixie Project Drill Program
Great Bear Reports Successful LP Fault Extension and Infill Drilling: 10.50 g/t Gold Over 13.10 m, 16.50 g/t Gold Over 6.25 m, and 11.18 g/t Gold Over 6.75 m
Great Bear Doubles Vertical Extent of LP Fault, Intersects High-Grade Gold at 942.20 m Downhole: 15.57 g/t Gold Over 3.05 m
Great Bear Drills 29.17 g/t Gold Over 15.50 m and 18.08 g/t Gold Over 15.80 m From Bedrock Surface at LP Fault