• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Precious Metals Market
    Precious Metals News
    Precious Metals Stocks
    • Precious Metals Market
    • Precious Metals News
    • Precious Metals Stocks
    gold investing

    Wallbridge Reports Positive Prefeasibility Results at Fenelon

    Written by Matthew Spizziri
    |
    Feb. 02, 2017 10:05AM PST

    Toronto, Ontario — February 2, 2017 – Wallbridge Mining Company Ltd. (TSX:WM, FWB:WC7) is pleased to announce positive results of a Pre-Feasibility Study (“PFS”) (prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”)) for the development of its Fenelon Gold Mine (“Fenelon”) in Quebec, Canada.

    Toronto, Ontario — February 2, 2017 – Wallbridge Mining Company Ltd. (TSX:WM, FWB:WC7)  is pleased to announce positive results of a Pre-Feasibility Study (“PFS”) (prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”)) for the development of its Fenelon Gold Mine (“Fenelon”) in Quebec, Canada. The PFS estimates a Pre-tax Net Cash Flow of $6.62M and a Project pre-tax Internal Rate of Return (“IRR”) of 92% for the initial approximate 18 month mine life for the known reserves located above 100 meters depth and in close proximity to the existing ramp.
    Marz Kord, CEO of Wallbridge, commented, “With a high margin pre-tax return of 92%, the PFS supports that Fenelon is well placed to become one of the high margin, low cost producers in the camp. The next key step in the development of Fenelon is the continuation of the permitting process as well as exploration around the existing deposit to add potential ounces and extend mine life.”
    “In tandem with the permitting and exploration, we will be seeking required funding for the pre-production costs through a variety of options including offtake partners. With recent exploration results at Fenelon, we are optimistic that we can add additional ounces with very limited drilling by initially pursuing high quality targets around the existing deposit. This exploration effort will continue from underground when in production in order to expand the deposit to depth and along strike.”
    Following the results of the PFS, we will continue with the required studies and permitting of the project as we look to bring the project to a production decision and into production.
    The PFS demonstrates the attractive economics of Fenelon within the top 100 meters of the deposit and key findings are shown in the table below:
    Table 1: Key Results (in Canadian dollars)

    • Estimated Project pre-tax IRR of 92%; NPV of US$5.84M, (at a 5% discount rate); and simple payback of twelve months, based on a $1,689 Canadian per ounce of gold- 6-month trailing average gold price in Canadian dollars.
    • Most cost estimates are based on firm quotations from mining and transportation contractors. Mining contractors have shown interest to supply the working capital (part of capital expenses) until mill payments are received.
    • Milling cost is based on an indicative quote from a gold toll milling facility where the previous two bulk samples were processed (295 kilometers distance from Fenelon).
    • Wallbridge intends to continue the permitting and the required studies with the intent to make a production decision in the second quarter of 2017.

    Project Introduction
    The Fenelon Project covers 1,052 hectares and is located in West-Central Quebec about 75 kilometres northwest of the town of Matagami. Geologically it is situated proximal to the Sunday Lake Deformation Zone which hosts the Detour Gold Mine in Ontario as well as the Martiniere gold project being explored by Balmoral Resources Ltd.
    A total of over 50,000 metres of drilling have been completed on the project and, very significantly, two bulk samples have been mined and processed from the Discovery Zone deposit. In 2001, a 13,713 tonne bulk sample mined from a small open pit at the Discovery Zone was test milled at the Camflo mill in Malartic and returned 132,039 grams (4,213 ounces) of gold giving a reconciled grade of 9.84g/t gold using a calculated recovery of 97%. A second bulk sample, mined from underground and also milled at Camflo was comprised of 8,073 tonnes and returned 80,731 grams (2,596 ounces) of gold giving a reconciled grade of 10.7 g/t gold at a calculated gold recovery of 93.5%. Without operational problem occurring during the ore processing of this second bulk sample, the gold recovery should normally be in the range of 97 %.
    Mineral Resources
    The 2016 resource area measures 500 m along strike, 210 m wide and 280 m deep. The resource estimate is based on a compilation of historical and recent diamond drill holes and wireframed mineralized zones largely inspired by previous work and Wallbridge’s interpretation. The final model was constructed by InnovExplo Inc. (“InnovExplo”).
    In order to conduct accurate resource modelling of the deposit, InnovExplo based its mineralized-zone wireframe model on the drill hole database and their knowledge of the Fenelon mine and similar deposits. A total of nine mineralized solids (coded 102 to 110) that honour the drill hole database were created.
    Table 2 below displays the results of the In Situ Mineral Resource Estimate for the Fenelon Project at the official 5.00 g/t Au cut-off grade.
    Table 2 : Fenelon Project Mineral Resource Estimate at a 5.00 g/t Au cut-off grade

    • The Independent and Qualified Persons for the Mineral Resource Estimate, as defined by NI 43-101, are Pierre-Luc Richard, P.Geo., M.Sc. and Catherine Jalbert, P.Geo., B.Sc., of InnovExplo, and the effective date of the estimate is July 5, 2016.
    • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
    • The model includes nine gold-bearing zones, eight of which include resources at the official cut-off grade.
    • Results are presented in situ and undiluted.
    • Sensitivity was assessed using cut-off grades from 2.00 to 10.00 g/t Au with 1.00 g/t Au increments. The official resource is reported at a cut-off of 5.00 g/t Au. Cut-off grades must be re-evaluated in light of prevailing market conditions (gold price, exchange rate and mining cost).
    • A fixed density of 2.80g/cm3 was used for all zones supported by limited information.
    • A minimum true thickness of 2.0 m was applied, using the grade of the adjacent material when assayed, or a value of zero when not assayed.
    • High grade capping (Au) was done on raw assay data and varies from 30 g/t to 140 g/t based on statistical analysis of individual mineralized zones. Restricted search ellipsoids were used during interpolation using 1X variography ranges and a threshold of 30 g/t Au.
    • Compositing was done on drill hole intercepts falling within the mineralized zones (composite lengths vary from 1m to 3m in order to distribute the tails adequately).
    • Resources were evaluated from drill holes using a 2-pass ID3 interpolation method in a block model (block size = 5 m x 5 m x 5 m).
    • The inferred category is only defined within the areas where blocks were interpolated during pass 1 or pass 2 where continuity is sufficient to avoid isolated blocks being interpolated by only one drillhole. The indicated category is only defined by blocks interpolated by a minimum of two drillholes in areas where the maximum distance to the closest drill hole composite is less than 20m for blocks interpolated in pass 1. The measured category is only defined by blocks interpolated by a minimum of two drillholes in areas where the maximum distance to the closest drill hole composite is less than 20m for blocks interpolated in pass 1 and in close proximity with sampled drifts (<10m).
    • Ounce (troy) = metric tons x grade / 31.10348. Calculations used metric units (metres, tonnes and g/t).
    • The number of metric tons was rounded to the nearest hundred. Any discrepancies in the totals are due to rounding effects. Rounding followed the recommendations in NI 43-101.
    • InnovExplo is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issue that could materially affect the Mineral Resource Estimate.

    Mineral Reserves
    Mineral reserves were estimated from the resource block model, using manually generated wireframes (stopes), which were designed based on the established 5.0 g/t cut-off grade.
    At a pre-feasibility level, longhole open stoping, uppers open stoping and drift & fill are the three methods selected for Fenelon, as they satisfy the following design criteria:

    • Maintain maximum productivities by incorporating bulk-mining methods and operational flexibility, which should result in lower operating costs; and
    • Maintain high overall recovery rates.

    The following tables illustrate the estimated reserve by stope type as well as Reserve Statement by category:
    Table 3: Reserve Statement


    Table 4: Reserve Statement by category


    The following longitudinal looking South shows the development layout schematics of the ramp and levels.


    Metallurgy
    The Fenelon ore responds well to conventional gold leaching with gold recoveries up to 98-99 % in the limited laboratory testwork done to date. The two bulk samples tested in the past returned gold recoveries of 97% and 93.5%, but with operational problems reported on both occasions. The problems were associated with liquid losses at the gold precipitation stage and not with gold dissolution. This situation could normally be avoided by process adjustments. Taking into account the excess gold liquid losses that occurred during the second bulk processing, both campaigns returned similar gold recoveries with extraction close to 97%.
    The additional testwork done in 2016 on historical core samples failed to confirm by direct cyanidation the gold recoveries on the discovery zone and deposit. However, intensive leaching on the leach tails from those tests returned similar high gold recoveries up to the 98-99% at the target grind size.
    Considering the bulk sample and laboratory results to date, the 97% gold recovery appears appropriate at this stage. Test work will continue when new samples become available.

    Read the full company profile.
    Capital and Operating Costs
    For the purpose of the pre-feasibility study, all mining activities on site should be completed by contractors. No processing activities, other than crushing, are planned on site so the ore should be trucked to a toll mill facility for processing. A very small owner’s team is envisioned to manage the contractors on site and oversee the geology aspect of the project. Thus capital and operating costs have been widely derived from contractor quotes, local to the area and have been validated based on the estimator experience with similar projects.
    The estimated pre-tax capital and operating expenditures are summarized in the following table based on the information available at the time of the release.
    Table 5: Fenelon Cost expenditure summary (000 Cdn$)


    The estimated global contingency included in the cost estimate represents 9.9% of the total cost before contingency at P50. This percentage was determined by evaluating the quantity and cost precision of each system element of the cost estimate. As a result, contingency by item varies between 5.6% and 50%. In other words, each system element was assigned a precision level on quantity development and a precision level on cost origin.
    Cash Flow Analysis
    The project is currently estimated to have a payback period of twelve months. Cash flows are based on a 100% equity funding basis and the economic analysis indicates a pre-tax NPV, discounted at 5%, of $5.84M and IRR of 92%. Post tax the NPV is approximately $2.8M and IRR 60%.
    The economic evaluation was performed using the IRR and the NPV methods using estimates of capital and operating costs, a construction schedule, a production schedule, and estimates of future gold ore prices provided. Since the financial analysis is based on a cash flow estimate, it should be expected that actual financial results should vary from these predictions.
    A 6 month trailing average for commodity prices and exchange rates as of September 2016 were used for the purpose of this study. The 6 month trailing average at the time of the report (July to December 2016) was calculated at 1,686 Cdn$/ounce which is consistent with the September 2016 value of 1,689 Cdn$/ounce used in the financial analysis. All costs are in Q4 2016 Canadian dollars with no allowance for inflation or escalation.
    The pre-tax Project NPV sensitivity was calculated for various gold prices and discount rates. This sensitivity is illustrated in Table 6 below.
    Table 6: Pre-tax NPV for varying gold prices and discount rates (000 Cdn$)


    Community and Environment
    Wallbridge has been working on a consultation plan to assess the perceptions of the Fenelon Project by the Cree, Algonquin and Jamesian communities within which the Project is located.
    None of the environmental data to date has identified any critical elements that could seriously impact the future development of the Fenelon Project. Additional studies will have to be conducted in order to complete an environmental baseline. The project will have to undergo the Northern Quebec environmental and social impact assessment and review procedure. An environmental baseline study was completed in 2004 which will require additional studies and Wallbridge will have to submit an environmental impact assessment statement.
    Project Timetable
    Table below shows the project milestones in months with project start date to be when permits are received (month 0). The project duration is approximately 18 months from the receipt of production permits. The start date is dependent on the receipt of production permits from various regulatory agencies.
    Table 7: Fenelon Main Milestones


    Report Filing
    A technical report on this PFS (prepared in accordance with NI 43-101) will be filed on SEDAR at www.sedar.com and at www.wallbridgemining.com within 45 (forty-five) days of the date of this news release.
    Qualified Persons
    Each of the Qualified Persons below has reviewed and approved the technical information for their specific items contained in this press release and is independent of Wallbridge. The Qualified Persons are:
    Catherine Jalbert, P.Geo., B.Sc., and Pierre-Luc Richard, P.Geo., M.Sc. (InnovExplo Inc.), who prepared the Mineral Resource Estimate in this press release.
    George Darling, P. Eng., (SNC-Lavalin Inc., at the time of preparation of the report), who prepared the Mineral Reserve Estimate, mine plan infrastructure, cost estimate and financial evaluation.
    Marie-Claude Dion St-Pierre (WSP Canada Inc.) who prepared the Community & Environment item.
    Pierre Pelletier, ing. (InnovExplo Inc.) who prepared the Metallurgical item.
    Marz Kord, P. Eng. is the Qualified Person on behalf of Wallbridge and has approved the scientific and technical disclosures in this press release.
    About Wallbridge Mining
    Wallbridge is establishing a pipeline of projects that will support sustainable production and revenue as well as organic growth through exploration and scalability.
    Wallbridge is currently exploring and completing a prefeasibility study on its recently purchased 100%-owned high-grade gold Fenelon project in Quebec with a production decision targeted for 2017. Wallbridge is also in discussions regarding several other advanced stage projects which could become the company’s next mines. These discussions benefit from the operating capabilities Wallbridge demonstrated by safely and efficiently mining the Broken Hammer deposit in Sudbury, which was completed in October 2015.
    Wallbridge is also continuing active partner-funded exploration on its large portfolio of nickel, copper, and PGM projects in Sudbury, Ontario. Currently, Wallbridge is completing a 20,000 metre fully partner-funded drilling program on its Parkin project designed to follow up on wide high-grade intersections in 2016.
    Wallbridge also has exposure to active exploration for copper and gold in Jamaica and British Columbia through its 15.5% ownership of Carube Copper Corp. (“Carube Copper”) (CUC:TSX-V, formerly Miocene Resources Limited).
    For Further Information
    Please visit Wallbridge’s website at www.wallbridgemining.com, or contact:
    Wallbridge Mining Company Limited
    Marz Kord
    President and CEO,
    Tel: (705) 682-9297 ext. 251
    Email: mkord@wallbridgemining.com
    Linda Zubal
    Vice President Corporate Communications
    Tel: (705) 682-9297 ext. 263
    Email: lzubal@wallbridgemining.com
    This press release may contain forward-looking statements (including “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the US Private Securities Litigation Reform Act of 1995) relating to, among other things, the operations of Wallbridge and the environment in which it operates. Generally, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”.
    Wallbridge has relied on a number of assumptions and estimates in making such forward-looking statements, including, without limitation, the ability to acquire the necessary permits and approvals to advance the Fenelon Mine Property toward production, the ability to safely and successfully dewater the underground workings at Fenelon, the ability to add to the existing resource base at Fenelon through drilling, the costs associated with the development and operation of its properties. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actual results, level of activity, performance or outcomes of such exploration and/or mine development to be materially different from those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will result in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans continue to be refined, the ability to execute planned exploration and future drilling programs, the need for additional funding to continue exploration and development efforts, changes in general economic, market and business conditions, and those other risks set forth in Wallbridge’s most recent annual information form under the heading “Risk Factors” and in its other public filings. Forward-looking statements are not guarantees of future performance and such information is inherently subject to known and unknown risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Wallbridge. Although Wallbridge has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking statements. In addition, all forward-looking statements in this press release are given as of the date hereof.
    Wallbridge disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws. The forward-looking statements contained herein are expressly qualified by this disclaimer.
    Connect with Wallbridge Mining Company Ltd. (TSX:WM, FWB:WC7) to receive an Investor Presentation.

    critical elementscanadagold investingbalmoral resourcesfinancial resultsmining methodsmine lifedetour gold
    The Conversation (0)

    Go Deeper

    AI Powered
    Golden Independence Announces M&I Resource of 506,052 Gold Ounces and Inferred Resource of 905,146 Gold Ounces at the Independence Project

    Golden Independence Announces M&I Resource of 506,052 Gold Ounces and Inferred Resource of 905,146 Gold Ounces at the Independence Project

    Latin Resources Logo

    Thickest Intersection Recorded to Date with 21.1M @ 1.2% Li2

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Precious Metals Investing Stocks

    OneGold

    OneGold (/GCSPUSD)
    /GCSPUSD

    Heliostar Metals

    Heliostar Metals (HSTR:CC)
    HSTR:CC

    Investor Insight

    Heliostar combines production of ~50,000–55,000 oz in 2026 with a pipeline of high-margin development assets in Mexico led by Ana Paula. Supported by operating cash flow from La Colorada and San Agustin, a debt-free balance sheet and strategic expansion into the US with the Goldstrike project in Utah, the company is positioned to scale into a 500,000 oz per year gold producer.

    Overview

    Heliostar Metals (TSX:HSTR,OTCQX:HSTXF,FRA:RGG1) is an emerging gold producer focused on building a mid-tier, multi-asset production platform, anchored in Mexico and complemented by strategic expansion into the United States.

    Heliostar Metals - open-pit mine

    The company has rapidly transformed from an explorer into a producer through disciplined, value-accretive acquisitions, assembling a 100 percent-owned portfolio of producing mines, advanced development projects and exploration assets. This platform provides both immediate cash flow and long-term scalability.

    In 2025, Heliostar produced 34,098 gold equivalent ounces, generated US$47.4 million in mine operating earnings, and ended the year with US$40.6 million in cash and no debt, demonstrating strong execution and financial discipline.

    Production is expected to increase to 50,000–55,000 oz in 2026, driven by La Colorada and San Agustin. Development of Ana Paula and Cerro del Gallo supports a clear pathway to 500,000 oz annual production by 2030.

    Heliostar Metals portfolio

    In 2026, Heliostar formed part of the OTCQX’s Best 50 top-performing companies. The company ranked 8th overall, joining 7 other mining companies in the top 10.

    Beyond its core Mexican portfolio, the addition of the Goldstrike project in Utah introduces further growth optionality, reinforcing Heliostar’s strategy of acquiring and advancing underexplored assets with strong development potential. With a staged growth strategy, strong margins and an expanding resource base, Heliostar is positioned to evolve into a 500,000 oz per year gold producer by 2030.

    Company Highlights

    • Growing Production Base: Two producing mines targeting 50,000–55,000 oz of gold in 2026, generating cash flow to fund development.
    • Clear Path to Mid-Tier Scale: Staged growth targeting annual production of 500,000 oz by 2030.
    • High-Margin Flagship Asset: The Ana Paula PEA outlines 101,000 oz/year production (post ramp-up) with strong economics, including US$1,012M NPV5% and 51.3% IRR at higher gold price assumptions, supporting a 2028 production target.
    • Self-Funded Growth Model: Generated US$47.4 million in mine operating earnings (2025) with US$40.6 million in cash and zero debt, reducing reliance on equity dilution.
    • Robust Resource Base: Approximately 7.3 Moz measured and indicated gold resources plus ~1.4 Moz inferred, supporting long-term scalability.
    • High-Quality Development Pipeline: Cerro del Gallo targeting 86,000 GEO/year at US$1,390 AISC, alongside San Antonio’s production potential.
    • Strategic Expansion in the US: Acquisition of the Goldstrike project in Utah adds near-surface oxide potential and long-term growth optionality.
    • Strong Institutional Backing: Approximately 53 percent institutional ownership, complemented by high-net-worth investors and management alignment.

    Key Projects

    Ana Paula (Flagship Development Project)

    Heliostar Metals \u200bAna Paula Project

    Ana Paula is a high-grade underground gold project in Guerrero and the cornerstone of Heliostar’s long-term growth strategy.

    The November 2025 PEA outlines a 9 year mine life with 101,000 oz/year production, 874,700 oz total output, and strong economics, including a US$1,012M NPV5% and a 51.3 percent IRR, supported by a low AISC of US$1,011/oz.

    The project hosts approximately 742,000 oz measured and indicated at 5.4 g/t and 514,000 oz inferred, highlighting its high-grade profile and expansion potential.

    Heliostar Metals Guerrero Gold Belt

    With a feasibility study targeted for H1 2027 and construction expected in H2 of the same year, Ana Paula is expected to become the primary driver of Heliostar’s transition to mid-tier production.

    The company is targeting production at Ana Paula in 2028.

    La Colorada Mine

    Heliostar Metals \u200bLa Colorada Mine

    La Colorada in Sonora is a key cash-flowing asset that underwent a successful turnaround in 2025. The mine hosts reserves of 376,000 ounces of gold grading 0.68 g/t in 17.1 million tonnes of ore.

    The mine is expected to produce 20,000–22,300 oz in 2026 at AISC of US$1,775–1,875/oz, supported by a six-year mine life and approximately 286,000 oz total production profile.

    Mining at the project’s Veta Madre pit commenced in August 2026, a milestone that the company ties to its plan to secure cash flow through 2027 and 2028 to support construction at Ana Paula.

    Ongoing drilling, pit expansions and underground potential provide meaningful upside, reinforcing its role as a core funding engine for development.

    Heliostar Metals 2026 Guidance

    San Agustin Mine

    San Agustin in Durango is a restarted oxide heap-leach operation providing near-term production growth and cash flow.

    2026 guidance targets 30,000–32,700 oz of gold at AISC of US$2,150–2,250/oz, following a low-capital restart funded from the company’s balance sheet.

    The asset offers additional upside through oxide expansion and sulphide exploration, supporting potential mine life extension.

    Cerro del Gallo Project

    Cerro del Gallo is a large-scale gold-silver development project in Guanajuato and a key driver of future production growth.

    The 2025 PFS outlines ~86,000 GEO/year over a 15-year mine life at US$1,390 AISC, with strong economics, including US$972 million NPV5% and 59.3 percent IRR at higher gold price assumptions.

    The project is expected to play a central role in advancing Heliostar towards the goal of 500,000 oz annual production by 2030.

    San Antonio Project

    San Antonio is a 100%-owned heap-leach development project offering strong optionality and long-life production potential.

    The project hosts approximately 1.74 million ounces of measured and indicated gold and demonstrates attractive optionality, including potential 80,000 oz/year production and low AISC of US$1,063/oz.

    As permitting advances, San Antonio represents a key medium-term growth opportunity within the portfolio.

    Goldstrike Project (Utah, USA)

    Goldstrike is a newly acquired gold project that expands Heliostar’s footprint in the United States and adds exploration and development optionality. The property currently hosts an Indicated resource of 975 kilo ounces at 0.46 g/t of gold.

    The project hosts a near-surface oxide gold system with historical production of approximately 209,000 ounces of gold and defined mineralization, offering potential for low-cost, open-pit heap-leach development. Its geological setting and existing dataset provide a strong foundation for resource growth and technical advancement.

    Goldstrike complements Heliostar’s acquisition strategy by adding a scalable, underexplored asset outside its core Mexican portfolio, enhancing long-term growth potential.

    Drilling is underway at Goldstrike to test the antimony and gold potential of both Antimony Ridge and Antimony Knoll, with results expected towards the end of 2026.

    Management Team

    Charles Funk – President & CEO

    Charles Funk has over 20 years of experience in exploration and business development, including senior roles at Newcrest Mining and OZ Minerals. He led the Panuco discovery for Vizsla Silver, demonstrating strong capability in identifying high-value deposits. At Heliostar, he has driven the company’s transformation into a multi-asset gold producer through disciplined acquisitions. His leadership is focused on building a scalable, mid-tier gold platform.

    Gregg Bush – Chief Operating Officer (COO)

    Gregg Bush is a proven mine builder with extensive experience in mine development, integration and operations. He previously served as COO of Capstone Mining and held senior leadership roles at Equinox Gold. Bush brings deep expertise in optimizing operating assets and advancing projects into production. He plays a key role in executing Heliostar’s production growth strategy.

    Sam Anderson – VP Projects

    Sam Anderson has approximately 25 years of experience in mine geology and project development, including 17 years at Newmont. He played a key role in advancing the Merian Mine from resource stage through construction to steady-state production. His expertise spans exploration, resource expansion and project execution. At Heliostar, he leads the advancement of key development assets.

    Mike Gingles – VP Corporate Development

    Mike Gingles brings more than 35 years of experience in the mining industry, specializing in corporate development and M&A. He played a leadership role in major transactions including Pueblo Viejo and Turquoise Ridge. His expertise includes project evaluation, deal structuring and strategic partnerships. He supports Heliostar’s acquisition-driven growth strategy.

    Hernan Dorado – VP Sustainability & Special Projects

    Hernan Dorado is a fifth-generation miner with over 20 years of experience in mining operations, particularly in Mexico. He was a founding member of Guanajuato Silver, where he served as COO. His expertise includes permitting, community engagement and sustainability practices. He ensures responsible development across Heliostar’s operations.

    Vitalina Lyssoun – Chief Financial Officer (CFO)

    Vitalina Lyssoun is a Chartered Professional Accountant (CPA, CA) with more than 16 years of experience in financial management within the resource sector. She has extensive expertise in public company reporting, compliance and internal controls. Prior to joining Heliostar, she led the corporate accounting function at Gatos Silver. Her experience spans multiple international jurisdictions.

    Stephen Soock – VP Investor Relations & Development

    Stephen Soock has nearly 20 years of experience across mining operations and capital markets. He began his career in technical roles at mine sites before transitioning to equity research, where he spent eight years covering growth-stage mining companies. He is a mining engineer and CFA Charterholder. At Heliostar, he leads investor relations and supports capital markets strategy.

    Silver Hammer Mining

    Silver Hammer Mining (HAMR:CC)
    HAMR:CC

    Renforth Resources

    Renforth Resources (RFR:CC)
    RFR:CC

    Orosur Mining

    OMI:CC

    GoldInxs Mining

    GoldInxs Mining (INXS:CC)
    INXS:CC

    Investor Insight

    GoldInxs Mining Corp. (TSXV:INXS, OTCQB: INXGF) provides investors with exposure to early-stage gold-copper exploration in British Columbia, leveraging a portfolio of high-potential projects in Tier 1 jurisdictions, within established gold districts, surrounded by strong regional infrastructure and led by an experienced management team committed to accelerating discovery and delivering shareholder value.

    GoldInxs Mining Corp

    Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube.

    Overview

    GoldInxs Mining Corp. is a discovery-focused mineral exploration company dedicated to identifying and advancing high-potential copper-gold assets in proven geological belts. The Company's strategy centers on acquiring overlooked and underexplored projects with large-scale potential, applying modern exploration techniques to rapidly evaluate targets and unlock shareholder value through discovery.

    The Company’s. common shares started trading on the TSX Venture Exchange in July 2026 under the symbol INXS, positioning itself to capitalize on favorable copper and gold market fundamentals.

    GoldInxs Mining sample rocks

    Copper demand is forecasted to grow steadily through 2030, with the global copper market expected to expand to over US$340 billion by 2030, driven by electric vehicles, renewable energy and infrastructure growth.

    On the other hand, gold continues to provide a safe-haven hedge against policy risks and market volatility, making GoldInxs’ dual focus on copper and gold particularly compelling for investors.

    The Company’s portfolio is anchored by two priority projects: the Fishpot Project in central British Columbia, interpreted as an emerging, large epithermal system with strong infrastructure access and jurisdiction quality as well as early indications of blackwater-style mineralization, and the non-core Millar Project in the prolific B.C Golden Triangle, a district renowned for world-class discoveries. While surrounding deposits attracted billions of dollars in investment, Fishpot received only sporadic historical exploration despite widespread hydrothermal alteration and numerous anomalous gold, silver and copper results. Artemis Gold’s Blackwater Mine has announced tripling production with an intended $1.56B investment, which sits only 65 km from the Fishpot property.

    Backed by a management team with expertise in exploration, project development and capital markets, GoldInxs is positioned to rapidly advance its assets, deliver near-term exploration catalysts and create shareholder value through discovery and strategic growth.

    Company Highlights

    • Mining-friendly jurisdiction: Projects are in British Columbia, which ranked second in Canada and 20th globally in the 2025 Fraser Institute investment attractiveness rankings.
    • Flagship and district-scale assets: Portfolio is anchored by the flagship Fishpot Project (“Fishpot”) in central B.C., showing strong geological indicators of mineralization, blackwater-style mineralization potential and immense exploration upside potential with only 378 meters of historical drilling. Fishpot is strategically located in the same region as Artemis Gold’s Blackwater Mine and Evolution Mining’s optioned Clisbako property.
    • Clear path to 2026 catalysts: GoldInxs secured a drill permit for an upcoming maiden 2,000-metre drill program at Fishpot, near-term exploration programs are designed to define mineralized systems, outline blackwater-style potential and create shareholder value following the completion of a 3D IP survey and drill targeting.

    Key Projects

    Fishpot Project

    GoldInxs Mining Fishpot Project


    Fistpot property

    The Fishpot Project represents the cornerstone asset within the GoldInxs portfolio. Covering up to 5,500 hectares in Central British Columbia, and located ~95 km north of Quesnel, Fishpot hosts a large hydrothermal alteration system that exhibits many of the geological characteristics observed in major epithermal and intrusion-related gold systems throughout the region. Fishpot encompasses five claim blocks, held under an option to acquire 100 percent subject to a 2 percent NSR, representing a significant exploration opportunity in a highly prospective region.

    Fishpot represents a largely untested hydrothermal mineral system where multiple independent exploration datasets, including gold-silver-copper surface geochemistry, alteration and geology, airborne magnetics, 3D IP chargeability/resistivity and identified epithermal-to-potential-porphyry target environments, are converging to define drill targets, despite only 378 metres of historical drilling across two holes.

    Fishpot is situated within the highly prospective Stikine Terrane and is underlain by Hazelton Group volcanic rocks and intrusive units comparable to those associated with several significant deposits in British Columbia. Extensive quartz-sericite alteration, hydrothermal brecciation, pyrite mineralization and multi-element geochemical anomalies support the interpretation of a robust mineralizing system. Fishpot is strategically positioned near active and historical mining operations, including Artemis Gold’s Blackwater Deposit, Newton Gold Project, Capoose and 3Ts Project, underscoring its large-scale discovery potential. Importantly, based on early-exploration results, Fishpot shares several regional geological characteristics commonly associated with Blackwater-style gold systems, including felsic volcanics, strong alteration, pyrite-rich mineralization and gold-silver geochemical associations. Despite the similarities the Company cannot yet make any formal connections to the surrounding properties, nor can they guarantee that such deposits exist on their ground.

    Fishpot Exploration Technology: GoldInxs advanced its Fishpot targeting program by combining a conventional 3D IP survey with emerging Virtual DRILL™ remote-sensing technology as an additional targeting layer, using multiple geological, geochemical and geophysical datasets to refine and prioritize targets ahead of a planned ~2,000-metre drill program.

    Fishpot Drill Permit & Expansion: GoldInxs has received the required drilling permits and expanded Fishpot to 5,509 hectares, positioning the Company to proceed with its inaugural ~2,000-metre modern drill program on a property that has seen very limited historical drilling, while refining targets through integrated geological, geochemical and geophysical data.

    Despite multiple encouraging exploration indicators, Fishpot has been subjected to only two historic drill holes totaling 378 metres, leaving the broader mineral system largely untested and providing significant leverage to future exploration success.

    Recent exploration completed by GoldInxs generated the highest reported gold value on Fishpot to date, returning up to 5.65 g/t Au from surface sampling, while airborne geophysical surveys identified multiple coincident magnetic and geochemical anomalies that have strengthened the Company's exploration model and target pipeline.

    The 2025 program returned rock samples of up to 5.65 g/t Au, 11.35 g/t Ag and 0.42% Cu, while historical work reportedly returned up to 4.36 g/t Au and 3.2% Cu.

    The property exhibits the potential low-sulphidation epithermal targets at Fishpot North, intermediate-sulphidation signatures at Fishpot East, and a large central magnetic high being evaluated for potential porphyry mineralization at depth. The Company is focused on finalizing drill targeting and preparing for the inaugural diamond drill campaign at Fishpot in the coming months following completion of the IP survey. GoldInxs is preparing to drill-test a 5,509-hectare, largely undrilled hydrothermal system in central British Columbia where high-grade surface gold-silver-copper results, Blackwater-style geological characteristics and multiple coincident geophysical targets have converged to define a portfolio of high-priority exploration targets.

    Management Team

    Nick Michael – President and CEO

    Mr. Michael is a veteran mining executive and technical director with over 37 years of global experience spanning mine development, engineering and operational leadership. His expertise covers the full project lifecycle, including design, construction, technical due diligence and Independent Engineer assignments for institutional investors and project financiers. He also leads CJK Milling, a company focused on reprocessing historical mine waste to recover discarded gold decades ago, when it was less valuable.

    Carlo Rigillo, CPA, Chief Financial Officer

    Mr. Rigillo is an experienced Chartered Professional Accountant with over two decades of experience. He holds a Bachelor of Commerce from the University of Toronto.

    Barry Miller – Executive Chairman and Director

    Mr. Miller brings over 30 years of experience in public markets, including roles as a broker, consultant and financier. He is the founder of GoldInxs and has been actively involved in the resource sector through leadership positions, including as director of Tinova Resources Corp., an exploration company focused on tin and rare earth elements in British Columbia and Alaska.

    Tara Asfour - Vice President, Corporate Development and Communications

    An executive consultant with over 13 years of experience, Tara Asfour holds expertise in corporate development, capital markets, investor relations and strategic communications. She has led strategic financings, partnerships and offtake initiatives within the resource sector through previous corporate development and investor relations roles with multiple publicly listed companies.

    Al Fabbro – Director

    With over three decades of experience spanning both the mining and finance sectors, Mr. Fabbro previously led Yorkton Securities’ retail trading department and was part of its Natural Resources Group. He later served as Lead Director of Roxgold Inc. and currently holds executive leadership roles in the mining industry.

    Darcy Vis, P.Geo. – VP Exploration and Director

    Mr. Vis is an economic geologist with over 17 years of experience in mineral exploration. He has held senior technical roles across multiple exploration companies and is the President of Tripoint Geological Services Ltd. His expertise includes target generation, project evaluation and exploration program execution.

    Stephen Soock, P.Eng., CFA – Director

    Mr. Soock is a mining professional with nearly 20 years of experience spanning both technical operations and capital markets. He currently serves as Vice President, Investor Relations and Development at Heliostar Metals.

    Christopher Kelly, PQS, FCIArb – Director

    Mr. Kelly has over 15 years of experience in construction and natural resources. He holds a BSc in Construction Economics and Management and an MSc in Construction Law and Dispute Resolution, and runs Trachtala Consulting Ltd.

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES