Viva Gold Announces Drill Results at Tonopah Project Including 100.6 meters at 1.33 grams per tonne

Precious Metals

Viva Gold is pleased to announce assay results for an additional three drill-holes in its 2018-2019 winter reverse circulation drill program at its Tonopah gold project located near Tonopah, Nevada.

Viva Gold (TSXV:VAU; OTCBB:VAUCF) is pleased to announce assay results for an additional three drill-holes in its 2018-2019 winter reverse circulation drill program at its Tonopah gold project located near Tonopah, Nevada.

As quoted in the press release:

“Mineralization in TG 1902 commenced at 10 meters below surface and produced an impressive column of over 100 meters of mineralization. This drill-hole infills an area of the north discovery structural zone that was previously carried in the resource model as low-grade inferred material. We anticipate that this result will add confidence and upgrade the near surface “starter pit” area of the project. TG 1901, TG 1820 and the previously announced TG 1819 were all drilled in a large gap of low-grade inferred mineralization and uncharacterized material between two pods of indicated resource east of the Dauntless zone. We believe that these results will help to infill and connect those two existing pods,” states James Hesketh, President & CEO.

Click here for the full text release

The Conversation (0)
×