• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Precious Metals Market
    Precious Metals News
    Precious Metals Stocks
    • Precious Metals Market
    • Precious Metals News
    • Precious Metals Stocks
    gold investing

    First Mining Finance Releases Additional Set of Assay Results from its Goldlund Infill Drilling Program

    Investing News Network
    Jul. 10, 2017 08:20AM PST
    Precious Metals

    First Mining Finance Corp. (TSX:FF)(OTCQX:FFMGF)(FRANKFURT:FMG) (“First Mining” or the “Company”) is pleased to announce the fifth set of assay results, comprising 11 drill holes (Tables 1 and 2) from its Phase 1, 24,000 metre diamond drill infill program on its 100% owned Goldlund Gold Project (“Goldlund”), located near the town of Sioux Lookout in northwestern …

    First Mining Finance Corp. (TSX:FF)(OTCQX:FFMGF)(FRANKFURT:FMG) (“First Mining” or the “Company”) is pleased to announce the fifth set of assay results, comprising 11 drill holes (Tables 1 and 2) from its Phase 1, 24,000 metre diamond drill infill program on its 100% owned Goldlund Gold Project (“Goldlund”), located near the town of Sioux Lookout in northwestern Ontario, Canada.
    Highlights:
    • Hole GL-17-002 intersected 14.0 metres of 1.48 grams per tonne gold
      • Including 2.0 metres of 8.00 grams per tonne gold
    • Hole GL-17-042 intersected 22.0 metres of 1.20 grams per tonne gold
      • Including 2.0 metres of 9.66 grams per tonne gold
    • Hole GL-17-002 intersected 28.0 metres of 0.85 grams per tonne gold
      • Including 14.0 metres of 1.14 grams per tonne gold

    Note: Assaying for the Goldlund 2017 drill program is being done by SGS at their laboratories in Red Lake, ONT, and Burnaby, BC. Reported widths are drilled core lengths; true widths are unknown at this time. Assay values are uncut.
    The goal of the 2017 drilling campaign at Goldlund is to upgrade Inferred resources into the Measured and Indicated categories, with the majority of the drilling focused on Zone 7 and Zone 1 (Figures 1 and 2), and to gain further knowledge of the geology and gold mineralization in preparation for a Phase 2 drilling program. The Phase 1 drilling program, comprising 100 holes (24,300 metres), was completed at the end of May and the remaining assay results from the Phase 1 program will continue to be released in batches as they are received.
    Since the commencement in January of the Phase 1 drilling program, the Company has issued four press releases (on April 25, May 2, May 24, and June 20, 2017) comprising a total of 49 drill hole results. With today’s latest press release, the Company has now released the results for 60 drill holes from the Phase 1 program, of which 57 drill holes contain significant intervals of gold mineralization, a 95% success rate.
    Commenting on the results, Dr. Chris Osterman, CEO of First Mining stated, “We are very pleased with the success of the Phase 1 drilling program, and as a result, we are now re-mobilizing a drill to re-commence drilling at the Goldlund Project to test the deeper portions of Zone 1. This series of deeper drill holes is expected to test the granodiorite dike hosting gold mineralization 50 to 200 metres below the historic mine workings in Zone 1. We anticipate that this drill program could evolve into a Phase 2 drill program once all assays are received by the Company of the first 100 holes.”
    In addition, Keith Neumeyer, the Chairman of First Mining, stated, “So far during the 2017 drilling campaign at Goldlund we have intersected gold mineralization in 57 out of the 60 holes drilled which is an impressive accomplishment. Given this excellent success rate, we have decided to send the rigs back to work to continue to drill at Goldlund as we develop a more concise Phase 2 program.”
    Table 1. Drill Hole Assay Results from Goldlu

    Hole IDFrom (m)To (m)Length (m)Au g/t
    GL-17-00217.031.014.01.48
    inc17.019.02.08.00
    GL-17-002and69.091.022.00.64
    and129.0135.06.01.40
    inc129.0131.02.03.83
    GL-17-00350.076.026.00.29
    and94.096.02.01.24
    and106.0108.02.011.12
    GL-17-003and140.0168.028.00.85
    inc140.0154.014.01.14
    and208.5209.51.02.86
    and245.0247.02.01.26
    and269.0273.04.01.50
    inc269.0271.02.02.57
    GL-17-00793.097.04.01.42
    and145.0155.010.00.86
    inc149.0151.02.02.34
    and183.0235.052.00.63
    GL-17-007inc207.0213.06.01.81
    and inc207.0209.02.02.74
    and inc211.0213.02.02.61
    and inc233.0235.02.04.70
    and269.0271.02.01.83
    GL-17-008203.0205.02.01.05
    and225.0233.08.01.40
    inc225.0227.02.02.25
    GL-17-008and inc231.0233.02.03.33
    and249.0265.016.00.40
    inc255.0257.02.01.28
    and282.0290.08.00.63
    inc285.0286.01.03.69
    Hole IDFrom (m)To (m)Length (m)Au g/t
    GL-17-01012.058.046.00.37
    inc12.014.02.01.45
    and inc22.024.02.01.41
    and inc28.030.02.01.66
    GL-17-010and inc52.054.02.01.07
    and182.0184.02.01.20
    and252.0256.04.01.53
    inc254.0256.02.02.62
    and280.0286.06.01.07
    inc284.0286.02.02.45
    GL-17-011GL-17-01144.054.010.00.74
    inc46.048.02.02.46
    GL-17-012186.0208.022.00.71
    GL-17-012inc200.0208.08.01.71
    and inc204.0206.02.05.02
    and246.0248.02.01.52
    GL-17-01374.082.08.01.49
    inc74.076.02.04.04
    GL-17-013and166.0168.02.02.69
    and266.0275.09.00.95
    inc274.0275.01.02.92
    GL-17-023GL-17-02348.052.04.01.23
    inc48.050.02.02.05
    GL-17-042210.0236.026.00.30
    inc210.0212.02.01.62
    and278.0351.073.00.51
    inc278.0279.01.016.38
    and inc331.0333.02.02.11
    GL-17-042and inc337.0339.02.01.22
    and367.0387.020.00.53
    inc367.0369.02.01.37
    and inc383.0385.02.01.85
    and409.0431.022.01.20
    inc409.0411.02.09.66
    and inc423.0425.02.02.28
    Hole IDFrom (m)To (m)Length (m)Au g/t
    GL-17-04970.096.026.00.65
    inc70.072.02.01.45
    and inc78.080.02.04.96
    and inc94.096.02.01.13
    and124.0136.012.00.52
    GL-17-049inc124.0126.02.01.10
    and inc128.0130.02.01.04
    and170.0172.02.01.43
    and230.0248.018.00.62
    inc230.0232.02.01.21
    and inc242.0244.02.01.49
    and inc246.0248.02.01.38
    and296.0298.02.02.19
    Assaying for the 2017 Goldlund drill program is being done by SGS at their laboratories in Red Lake, Ontario, and Burnaby, BC. Prepared samples are analyzed for gold by either Bulk Leach Extractable Gold (BLEG) assay techniques or by lead fusion fire assay with an atomic absorption spectrometry (AAS) finish. Multi-element analysis on the mineralized zones is also being undertaken by two-acid aqua regia digestion with ICP-MS and AES finish.

    To view Figure 1. Plan Map, please visit the following link: https://media3.marketwire.com/docs/Figure1-PlanMap.jpg
    To view Figure 2. Cross-Section through the Goldlund Project, please visit the following link: https://media3.marketwire.com/docs/GodlundProperty.jpg
    Table 2. Drill Hole Locations

    NRHole IDAzimuth °Dip °Length (m)UTM EastUTM NorthSection
    NR5GL-17-0020-901585457015527232545700E
    NR5GL-17-003180-803025457015527231545700E
    NR5GL-17-0070-902935457015527176545700E
    NR5GL-17-0080-903005457015527156545700E
    NR5GL-17-010180-803055457525527244545750E
    NR5GL-17-0110-901525457525527235545750E
    NR5GL-17-012180-802995457505527224545750E
    NR5GL-17-0130-902755457485527213545750E
    NR5GL-17-023180-801315458015527255545800E
    NR5GL-17-0420-904475458515527209545850E
    NR5GL-17-0490-903265455525527134545550E

    Gold observed during the current drilling program at Goldlund occurs both as fine disseminations in quartz vein stockworks and as more discrete larger grains up to 2 mm spatially associated with pyrite in the quartz veins. Calaverite, a gold telluride mineral, has been noted occasionally in higher grade intervals on fracture surfaces in the quartz veins. Higher grade gold distribution in the granodiorite dike is often, but not always, associated with zones of more intense quartz stockworking and potassic alteration. Figure 2 above displays a cross-section of the geology and gold mineralization with drill holes GL-17-02 to GL-17-08.
    QA/QC Procedures
    The QA/QC program for the 2017 drilling program at Goldlund consists of the submission of duplicate samples and the insertion of certified reference materials and blanks at regular intervals. These are inserted at a rate of one standard for every 20 samples (5% of total) and one blank for every 30 samples (3% of total). The standards used in the 2017 program consist of 5 different gold grades ranging from 1 to 9 g/t, and are sourced from CDN Resource Laboratories in Langley, BC. Blanks have been sourced locally from barren granitic material.
    Field duplicates from quartered core, as well as ‘coarse’ or ‘pulp’ duplicates taken from coarse reject material or pulverized splits, are also submitted at regular intervals with an insertion rate of 4% for field duplicates and 4% for coarse or pulp duplicates. Additional selected duplicates are being submitted for screened metallic fire assay analysis and to an umpire lab for check assaying. SGS also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.
    Dr. Chris Osterman, P.Geo., CEO of First Mining, is the “qualified person” for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects and he has reviewed and approved the scientific and technical disclosure contained in this news release.
    ABOUT THE GOLDLUND PROJECT
    The Goldlund deposit is situated within a land package of approximately 280 square kilometres (28,000 hectares) referred to as the Goldlund Gold Project. The Property has a strike-length of over 50 kilometres in the Wabigoon Subprovince. Goldlund is an Archean lode-gold project located in northwestern Ontario, approximately 60 kilometres from the township of Dryden. The claims that make up the land package cover the historic Goldlund and Windward mines.
    On January 9, 2017, the Company announced an initial mineral resource estimate for Goldlund. At a 0.4 g/t Au cut-off grade, the Goldlund deposit contains pit constrained Indicated Resources of 9.3 million tonnes at 1.87 grams per tonne or 560,000 ounces of gold. At a 0.4 g/t Au cut-off grade, the Goldlund deposit contains pit constrained Inferred Resources of 40.9 million tonnes at 1.33 grams per tonne or 1,750,000 ounces of gold. The technical report for this resource estimate has been filed on SEDAR and is also available on the Company’s website at www.firstminingfinance.com.
    ABOUT FIRST MINING FINANCE CORP.
    First Mining is a mineral property holding company whose principal business activity is to acquire high quality mineral assets with a focus in the Americas. The Company currently holds a portfolio of 25 mineral assets in Canada, Mexico and the United States with a focus on gold. Ultimately, the goal is to continue to increase its portfolio of mineral assets through acquisitions that are expected to be comprised of gold, silver, copper, lead, zinc and nickel.
    ON BEHALF OF FIRST MINING FINANCE CORP.
    Keith Neumeyer, Chairman
    Cautionary Note Regarding Forward-Looking Statements
    This news release includes certain “forward-looking information” and “forward-looking statements”(collectively “forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included herein, without limitation, statements relating the future operating or financial performance of the Company, are forward-looking statements.
    Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible”, and similar expressions, or statements that events, conditions, or results “will”, “may”, “could”, or “should” occur or be achieved. Forward-looking statements in this news release relate to, among other things: the potential results of the remainder of the Company’s Phase 1 drilling program at Goldlund and the timing of the dissemination of such results by the Company; the re-mobilization of drills at Goldlund for the purposes of drilling deeper holes in Zone 1; the Company’s expectation that a Phase 2 drilling program at Goldlund will confirm that Zones 1 and 7 are connected and continuous; plans relating to a Phase 2 drilling program at the Goldlund project and the anticipated timing of such a program; any upgrade to, or expansion of, the resources on the Goldlund project; and the potential for further value to be unlocked at the project. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies.
    Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the results of future exploration efforts at the Goldlund project; management’s discretion to refocus its exploration efforts; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; and title to properties. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these times. Except as required by law, First Mining does not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law.

    First Mining Finance Corp.
    Patrick Donnelly
    President
    604-639-8854
    First Mining Finance Corp.
    Derek Iwanaka
    Vice President, Investor Relations
    604-639-8824
    www.firstminingfinance.com
    first mining financelocal governmentcanadagold investing
    The Conversation (0)

    Go Deeper

    AI Powered
    Goliath Resources

    Goliath Intersects 10.62 g/t Gold Over 22.82 Meters, Drilling Maintains 100% Hit Rate, 95% Of Holes Contain Visible Gold, Remains Wide Open, Surebet Discovery, Golddigger Property, Golden Triangle, B.C.

    Heliostar Drills 30.2m Grading 6.29g/t Gold in First Resource Conversion Holes at Ana Paula

    Heliostar Drills 30.2m Grading 6.29g/t Gold in First Resource Conversion Holes at Ana Paula

    Latest News

    Cobre Limited: Unlocking Copper and Critical Minerals for a Low-carbon Future

    Harvest Gold Announces Mosseau Drill Program Update; Urban Barry Regional Till Program Completed

    Earthwise Advertising & Investor Awareness Campaign

    Kobo Resources to Recommence 2025 Drill Program at the Kossou Gold Project; Appoints Industry Veteran to Support Technical and Regional Growth Strategy

    Angkor Advances Exploration Independently On Andong Bor License, Cambodia

    More News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Precious Metals Stocks

    Triumph Gold

    TIG:CA

    Horizon Minerals

    HRZ:AU

    Alice Queen

    AQX:AU

    Pinnacle Silver and Gold

    PINN:CC

    1911 Gold

    AUMB:CC

    Kobo Resources

    KRI:CC
    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×