• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Australia Market
    Australia News
    Australia Stocks
    • Australia Market
    • Australia News
    • Australia Stocks
    gold investing

    Newcrest Mining Limited – Quarterly Report for the Three Months Ended 31 December 2020

    Written by Investing News Network
    |
    Jan. 27, 2021 04:24PM PST

    Strong quarterly production, safety and unit cost records, progress on growth Strong operating performance in the December 2020 quarterGold production of 535koz and copper production of 35kt All-In Sustaining Cost of $968oz, delivering an AISC margin of 46% or $836oz Cadia records lowest ever quarterly AISC at negative $6oz Safety Transformation Plan delivering resultsRecord low TRIFR outcomes for Red Chris and …

    (figures are unaudited and in US$ except where stated)

    Strong quarterly production, safety and unit cost records, progress on growth

    • Strong operating performance in the December 2020 quarter(1)
      • Gold production of 535koz(2) and copper production of 35kt
      • All-In Sustaining Cost (AISC) of $968/oz(2), delivering an AISC margin of 46% or $836/oz(3)
      • Cadia records lowest ever quarterly AISC at negative $6/oz
    • Safety Transformation Plan delivering results
      • Record low TRIFR outcomes for Red Chris and Telfer
      • Overall Group TRIFR of 1.6, an equal record low for a quarter
    • Growth agenda advanced with significant progress made at the Havieron Project
      • Initial Inferred Mineral Resource estimate of 3.4Moz of gold and 160kt of copper(4)
      • Early works construction underway in relation to the box cut and exploration decline
    • Renewable energy transition progressed with Cadia renewable energy Power Purchase Agreement
      • Expected to help deliver a ~20% reduction in Newcrest’s greenhouse gas emissions from 2024
      • A significant step towards achieving Newcrest’s target of a 30% reduction by 2030(5)
    • New compensation, relocation and benefits sharing agreements signed at Lihir
    • Environment Permit granted for Wafi-Golpu Project

    Newcrest Mining Limited (ASX: NCM) (TSX: NCM) Newcrest Managing Director and Chief Executive Officer, Sandeep Biswas, said, “Our results for the December quarter were underpinned by a strong operational and safety performance together with significant advancements in our growth agenda and sustainability commitments.”

    “Newcrest’s quarterly gold production was 6% higher than the prior period reflecting a stronger performance from Lihir and Telfer combined with a reduction in scheduled maintenance events in the quarter. Our world-class Cadia asset continues to break records, reporting its lowest ever quarterly All-In Sustaining Cost of negative $6/oz, which equates to an All-In Sustaining Cost margin of $1,821/oz on its almost 200,000 ounces in the quarter.”

    “At Lihir, we are on track to release the outcomes of the mine optimisation study with our Half Year Results in February. The continued improvement of the handling and processing of the argillic ores has contributed to an increase in throughput and recovery, and culminated in a 13% increase in gold production in the quarter. We recently announced the signing of a new compensation, relocation and benefits sharing agreement with the mining lease area landholders, building on the strong relationships we have developed over recent years.”

    “Red Chris and Telfer also achieved new safety records in the quarter, reporting their lowest ever injury rates. This fantastic achievement demonstrates the success of Newcrest’s Safety Transformation Plan and highlights the commitment and dedication of all our people in embedding the safety culture in our workplace.”

    “In December 2020, we took a major step towards defining the potential of the Havieron Project with the announcement of an initial Inferred Mineral Resource estimate. In January 2021, the Board approved funding to construct the box cut, exploration decline and associated infrastructure, following receipt of the necessary regulatory approvals to commence these activities. With work now well underway at the Project, we see the potential of achieving commercial production from Havieron within the next three years.”

    “During the period we also entered into a landmark renewable energy power purchasing agreement to secure a significant part of the future energy requirements at Cadia. This agreement is expected to help deliver a ~20% reduction in Newcrest’s greenhouse gas emissions, assist in maintaining competitive energy costs and is a significant step in achieving our target of a 30% reduction in emissions intensity by 2030.”

    “Progress was also made at the Wafi-Golpu Project with the granting of the Environment Permit in December 2020, which is a prerequisite for the grant of a Special Mining Lease under the Mining Act,” said Mr Biswas.

    HighlightsMetric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance
    TRIFR(6)mhrs1.62.62.22.3
    Group production(2) – goldoz535,477503,0891,038,5661,062,7511,950-2,150koz
     – coppert34,55734,76369,32062,468135-155kt
    All-In Sustaining Cost(2),(7)$/oz968980974877(8)
    Realised gold price(9)$/oz1,8151,8371,8261,446
    All-In Sustaining Cost margin(3)$/oz836847842569

     

    Overview

    Gold production was 6% higher than the prior period primarily driven by a reduction in scheduled maintenance events in the quarter, combined with a stronger operational performance from Lihir and Telfer. Gold production for the December 2020 quarter includes 31koz relating to Newcrest’s 32% equity interest in Lundin Gold Inc which owns the Fruta del Norte mine.

    Newcrest’s AISC for the December 2020 quarter of $968/oz(2) was $12/oz lower than the prior period. The marginal improvement in Newcrest’s AISC/oz was primarily driven by the benefit of a higher realised copper price, higher copper sales volumes at Cadia and a reduction in the amount of production stripping. These benefits were largely offset by timing of gold sales volumes at Lihir, timing of sustaining capital expenditure and the impact of a strengthening Australian and Canadian dollar on operating costs.

    Metric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance(10)
    Group(2)-gold oz535,477503,0891,038,5661,062,7511,950-2,150koz
    -coppert34,55734,76369,32062,468135-155kt
    -silveroz230,769214,412445,181470,567
    Cadia -goldoz194,088196,504390,592411,452680-760koz
    -coppert26,64325,32951,97245,42395-105kt
    Lihir -goldoz200,173177,337377,510381,500720-820koz
    Telfe-goldoz98,85586,452185,307182,464360-420koz
    -coppert2,4432,3844,8267,27310-20kt
    Red Chris(11)-goldoz11,37512,63624,01211,29445-55koz
    -coppert5,4717,05012,5219,77325-30kt
    Gosowong(12)-goldoz–––76,040
    Fruta del Norte(2),(13) -goldoz30,98630,16061,146–95-110koz
    FatalitiesNumber0000
    TRIFR(6)mhrs1.62.62.22.3
    All-In Sustaining Cost(2),(7)$/oz968980974877(8)
    All-In Cost(14)$/oz1,3491,2751,3101,029
    All-In Sustaining Cost margin(3)$/oz836847842569
    Realised gold price(9)$/oz1,8151,8371,8261,446
    Realised copper price(9)$/lb3.262.973.122.66
    Realised copper price(9)$/t7,1876,5486,8785,864
    Average exchange rateAUD:USD0.73030.71470.72250.6846
    Average exchange ratePGK:USD0.28530.28720.28620.2940
    Average exchange rateCAD:USD0.76670.75040.75850.7575

     

    All figures are shown at 100% unless stated otherwise.

    Operations

    Cadia, Australia

    HighlightsMetricDec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance
    TRIFRmhrs7.53.65.54.3
    Total production  – gold oz194,088196,504390,592411,452680-760koz
     – coppert26,64325,32951,97245,42395-105kt
    Head Grade  – gold g/t0.951.020.981.18
     – copper%0.390.400.390.40
    Sales   – goldoz194,183195,146389,329398,648
     – coppert26,47724,59651,07344,170
    All-In Sustaining Cost$/oz(6)11354167([15])
    All-In Sustaining Cost margin $/oz1,8211,7241,7721,279

     

    Gold production of 194koz was 1% lower than the prior period due to lower grade and recovery, largely offset by the realisation of a number of debottlenecking initiatives in Concentrator 1 which, together with a reduction in scheduled maintenance events, culminated in a 7% increase in mill throughput.

    Gold recovery was 2% lower than the prior period reflecting a reduction in mineral liberation and flotation residence time which was a consequence of the higher throughput rates. The completion of Stages 1 and 2 of the Cadia Expansion Project is expected to deliver increased recoveries at the higher throughput rates, as well as further increasing plant capacity to 35mtpa. The lower gold grade in the period was in line with expectations.

    Mill throughput in the March 2021 quarter will be lower than the current period reflecting planned shutdowns for Concentrator 1 and the material handlings system.

    Cadia has set a new quarterly record, reporting an AISC for the period of negative $6/oz which reflects a higher realised copper price, higher copper sales volumes and timing of sustaining capital expenditure. These benefits were partially offset by the impact on operating costs from the strengthening of the Australian dollar against the US dollar and higher royalty and concentrate treatment, refining and transporting costs.

    Newcrest announced in December 2020 that it had entered into a 15 year renewable Power Purchase Agreement (“PPA”) with Tilt Renewables Limited, the owner and developer of the Rye Park Wind Farm, to secure a significant portion of Cadia’s future projected energy requirements. The PPA, together with the forecast decarbonisation of electricity generation in New South Wales, is expected to deliver a ~20% reduction in Newcrest’s greenhouse gas emissions and is a significant step towards the achievement of Newcrest’s targeted 30% reduction by 2030(16). The PPA will act as a partial hedge against future electricity price increases and will provide Newcrest with access to large-scale generation certificates which Newcrest intends to surrender to achieve a reduction in its greenhouse gas emissions.

    In December 2020, Newcrest submitted the statement of environmental effects to the Department of Planning, Industry and Environment for Modification 14. The Modification seeks approval from the Department to increase Cadia’s current processing capacity from 32mtpa to 35mtpa and includes the proposal for the repair of the slumped section of the Northern Tailings Storage Facility (“NTSF”) together with a minor change to the footprint of the NTSF and Southern Tailings Storage Facility to allow for a change from upstream to centreline lift design.

    The Molybdenum Plant is on track to be fully commissioned in the fourth quarter of FY21. The Molybdenum Plant is expected to deliver an additional revenue stream for Cadia in the form of a molybdenum concentrate which will be recognised as a by-product credit to AISC.

    Lihir, Papua New Guinea

    HighlightsMetricDec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance
    TRIFRmhrs0.00.50.20.5
    Production  – goldoz200,173177,337377,510381,500720-820koz
    Head Grade  – goldg/t2.272.342.302.38
    Sales  – goldoz170,308210,831381,139362,955
    All-In Sustaining Cost$/oz1,4381,2831,3521,154
    All-In Sustaining Cost margin $/oz377554474292

     

    Gold production of 200koz was 13% higher than the prior period driven by an increase in throughput and recovery, partially offset by lower grade.

    The higher throughput in the December quarter reflects the completion of scheduled maintenance events which commenced in the prior quarter, together with a reduction in unplanned downtime. Mill throughput also benefited from improved blending and operational practices combined with modifications to chutes and conveyors which improved the ability to process argillic ores.

    Gold recovery improvements were realised through improved flotation performance notwithstanding gold head grades were 3% lower than the prior period as a result of lower mined ore and stockpile grades.

    Additional modifications are planned in the March 2021 shutdown to manage the processing of argillic ores, including trommel spray upgrades, which will further increase confidence in managing the increased proportion of these ores.

    Newcrest expects to announce the findings of its Lihir mine optimisation study in its Half Year Results which will be released on 11 February 2021. The mine optimisation study was focused on improving ore presentation to the processing plant, accounting for clay management study outcomes and optimising the integration sequence of the seepage barrier project with the mine schedule.

    In accordance with Lihir’s bi-annual shutdown strategy, a planned shutdown will be executed in the March 2021 quarter which will result in a reduction in mill throughput when compared to the December 2020 quarter.

    Lihir’s AISC was 12% higher than the prior period primarily driven by the timing of gold sales volumes and the timing of sustaining capital expenditure.

    On 22 December 2020, Newcrest announced that it had signed new compensation, relocation and benefits sharing agreements with the mining lease area landholders at Lihir. It is expected that these new agreements will enhance socio-economic development outcomes for mining lease area landholders and enable benefits to be distributed directly to their intended beneficiaries. The agreements also enable the efficient and transparent distribution of compensation and benefits without a material increase in quantum.

    Lihir – Material Movements

    Ore SourceMetricDec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    Ex-pit crushed tonneskt1,9181,2363,1542,614
    Ex-pit to stockpilekt6151,6102,2254,051
    Wastekt4,7936,26911,0639,471
    Total Ex-pitkt7,3269,11516,44016,137
    Stockpile reclaimkt1,7652,1923,9573,853
    Stockpile relocationkt2,8843,3066,1907,293
    Total Otherkt4,6495,49810,14711,146
    Total Material Movedkt11,97514,61326,58727,283

     

    Lihir – Processing

    EquipmentMetric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    Crushingkt3,6833,4267,1096,467
    Millingkt3,6913,2556,9466,645
    Flotationkt2,8352,7805,6154,729
    Total Autoclavekt1,9981,5923,5903,658

     

    Telfer, Australia

    HighlightsMetricDec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance
    TRIFRmhrs1.84.63.64.3
    Production – goldoz98,85586,452185,307182,464360-420koz
    – coppert2,4432,3844,8267,27310-20kt
    – gold g/t0.940.860.900.91
    – copper%0.090.090.090.15
    Sales – goldoz87,99285,096173,089185,470
    – coppert2,1522,3114,4636,998
    All-In Sustaining Cost$/oz1,5601,7971,6761,380
    All-In Sustaining Cost margin(17)$/oz2554015066

     

    Telfer’s TRIFR outcome of 1.8 injuries per million hours worked is its lowest reported quarterly safety outcome on record. This significant achievement demonstrates the success of Newcrest’s Safety Transformation Plan in embedding safe practices and behaviours at its operations, reflecting strong visible safety leadership, proactive hazard reporting and a workforce committed to improve the safety culture at their workplace.

    Gold production of 99koz was 14% higher than the prior period, driven by the completion of planned maintenance in the prior quarter enabling an increase in mill throughput, a 9% increase in gold grade, the injection wells pilot which has positively contributed to an increase in the realisation of Dump Leach ounces in the period and higher recovery. The 9% increase in gold grade reflects a higher proportion of underground ore feed with the 2% improvement in gold recovery attributable to the optimisation of sulphur grades through successful blending strategies.

    Telfer’s AISC of $1,560/oz was 13% lower than the prior period reflecting lower site costs due to lower open pit mining activity and maintenance shutdown timing, the benefit to site operating costs from the 14% increase in gold production, a reduction in freight costs and a higher realised copper price. These benefits were partially offset by the impact on operating costs from the strengthening of the Australian dollar against the US dollar, gold and copper sales volumes being below production due to rain affected delays to shipping, timing of sustaining capital expenditure and an increase in exploration activities.

    Red Chris, Canada

    Highlights(18)MetricDec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    YTD
    FY20
    FY21 Guidance
    TRIFRmhrs1.811.16.716.9
    Production  – goldoz11,37512,63624,01211,29445-55koz
    – coppert5,4717,05012,5219,77325-30kt
    Head Grade – gold g/t0.420.400.410.28
    – copper%0.450.460.460.45
    Sales – goldoz12,64111,83424,4759,789
    – coppert6,0726,64212,7148,679
    All-In Sustaining Cost$/oz3,2782,6212,9612,323([19])
    All-In Sustaining Cost margin$/oz(1,463) (784)(1,135) (877)

     

    Red Chris’ TRIFR outcome of 1.8 injuries per million hours worked is its lowest reported quarterly safety outcome since Newcrest acquired its 70% interest and became operator of the Red Chris mine. This significant milestone highlights the success of Newcrest’s Safety Transformation Plan in transforming on-site safety behaviours and improved working conditions. Red Chris continues to build on its safety reporting culture and incident investigation with a particular focus on hazard identification and mitigation through sound pre-task planning and on-task assessment.

    Gold production of 11koz was 10% lower than the prior period primarily driven by lower mining and throughput rates. Mining in the open pit was impacted by excessive melt water from a higher than average winter snow pack and unseasonal rain in the quarter which flooded both open pits and caused extended periods of adverse road conditions. This delayed ore release from Phase 4 and led to material handling issues in the primary crusher, coarse ore stockpile and mill feed systems. These impacts were partially offset by the benefit of a higher residence time in the circuit which improved gold recovery and a higher feed grade.

    Red Chris’ AISC of $3,278/oz was 25% higher than the prior period driven by higher operating costs in the open pit due to unseasonably high rainfall, lower copper sales volumes and the impact to site operating costs from a strengthening Canadian dollar against the US dollar. These impacts were partially mitigated by a higher realised copper price and lower sustaining capital expenditure.

    Over the course of FY21, Red Chris is planning to implement a number of additional improvement initiatives across the site including a new fleet management system, the replacement of the conventional CAT 793 truck tubs with high performance trays to realise payload benefits and a number of throughput and recovery related projects.

    The latest drilling results for Red Chris are included in the December 2020 Quarterly Exploration Report which was also released today. Newcrest expects to commence the construction of the box-cut for the exploration decline later this quarter, subject to regulatory approvals.

    Fruta Del Norte, Ecuador

    As announced on 30 April 2020, Newcrest acquired the gold prepay and stream facilities and an offtake agreement in respect of Lundin Gold Inc’s Fruta del Norte mine for $460 million. In the December 2020 quarter, Newcrest received net pre-tax cash flows of ~$26 million from these financing facilities.

    Included within Newcrest’s gold production for the December 2020 quarter is 31koz relating to Newcrest’s 32% equity interest in Lundin Gold Inc, the owner of the Fruta del Norte mine.

    Project Development

    Havieron, Western Australia

    The Havieron Project is located 45km east of Newcrest’s Telfer operation and is operated by Newcrest under a Joint Venture Agreement with Greatland Gold plc.

    In December 2020, Newcrest released an initial Inferred Mineral Resource Estimate for the Havieron Project of 52Mt @ 2.0g/t Au and 0.31% Cu for 3.4Moz Au and 160kt Cu(20). Mineralisation remains open in multiple directions outside of the initial Inferred Mineral Resource estimate, which indicates the possibility that the resource could continue to grow over time with additional planned drilling activity.

    Additionally, on 13 January 2021 Newcrest announced that its Board had approved funding of A$146 million (~US$112 million(21)) for the construction of the box cut, exploration decline and associated surface infrastructure at the Havieron Project. This followed receipt of the necessary regulatory approvals to commence these construction activities.

    Work is ongoing to finalise the Water Management Plan for the early works program and to progress the necessary approvals and permits that are required to commence the development of an operating underground mine and associated infrastructure at the Project(22).

    The latest drilling results for the Havieron Project are included in the December 2020 Quarterly Exploration Report which was also released today.

    Wafi-Golpu, Papua New Guinea

    In December 2020, following a rigorous environmental impact assessment, the Papua New Guinean Conservation and Environment Protection Authority approved, and the Director of Environment issued, the Environment Permit for the Wafi-Golpu Project. The Environment Permit is required under the Papua New Guinean Environment Act and is a pre-requisite for the grant of a Special Mining Lease under the Mining Act.

    Newcrest, together with its WGJV partner Harmony, looks forward to re-engaging with the State of Papua New Guinea and progressing discussions on the Special Mining Lease for the Wafi-Golpu Project.

    Molybdenum Plant, Cadia, Australia

    The Molybdenum Plant is on track to be fully commissioned in the fourth quarter of FY21. The Molybdenum Plant is expected to deliver an additional revenue stream for Cadia in the form of a molybdenum concentrate which will be recognised as a by-product credit to AISC.

    Exploration

    See the separately released “Quarterly Exploration Report” for the December 2020 quarter.

    COVID-19 Update

    To date, Newcrest has not experienced any material COVID-19 related disruptions to its operations or to the supply of goods and services.

    Newcrest is managing a number of positive COVID-19 cases at its Red Chris mine in British Columbia and on Lihir Island, Papua New Guinea. Comprehensive testing, quarantine and precautionary contact tracing procedures continue to be enforced across all Newcrest sites with the cases identified to date at Lihir and Red Chris being largely asymptomatic or presenting minor symptoms.

    The Lihir and Red Chris operations remain unaffected by the positive cases with strict hygiene, social distancing and other COVID-19 management protocols in place. As previously highlighted, all of Newcrest’s operations have business continuity plans and contingencies in place to minimise disruptions to the operations in the event of a significant number of operational employees and/or contractors contracting the virus. It is expected that these plans will enable the operations to continue producing in line with the production schedule, and if there are any material impacts, Newcrest will inform the market in line with its continuous disclosure obligations.

    Costs associated with managing COVID risks in FY21 are now expected to be higher than anticipated at the start of the year due to more extensive testing, longer quarantining periods, roster and other labour costs, and other preventative actions. This has resulted in costs associated with managing COVID of approximately $30 million in the first half to end December 2020. The full year estimate is expected to be in the order of $60-70 million, up from the original estimate of $30-40 million.

    Corporate

    Community Support Fund

    Newcrest’s A$20 million Community Support Fund strives to help its host communities in Papua New Guinea, Australia, Canada (British Columbia) and Ecuador cope with the challenges associated with COVID-19. A number of initiatives, ranging from immediate health assistance to livelihood restoration and economic recovery, have been funded to date.

    Newcrest continues to work with its partners, host governments, communities and Indigenous Peoples to prioritise and deliver programs under the Fund in the most effective manner.

    Toronto Stock Exchange Listing

    On 13 October 2020, Newcrest listed its common shares on the Toronto Stock Exchange (TSX) under the symbol “NCM”. Newcrest retains its primary listing on the Australian Securities Exchange and its secondary listing on PNGX Markets. Newcrest’s listing on the TSX supports its pursuit of growth in the Americas following the 70% acquisition of the Red Chris mine in Canada, its investments in Ecuador and its expanding portfolio of exciting exploration and early stage entry prospects in the Americas.

    Modern Slavery Statement

    On 21 December 2020, Newcrest submitted its first Modern Slavery Statement to the Australian Department of Home Affairs in compliance with the 2018 Australian Modern Slavery Act. The Report sets out Newcrest’s public commitments to assess and address modern slavery risks in its global operations and supply chains, including due diligence and remediation processes. Newcrest’s Modern Slavery statement can be located within the Corporate Governance section of its website (www.newcrest.com).

    Sustainability Report

    On 4 November 2020, Newcrest released its 2020 Sustainability Report which outlines Newcrest’s performance against its public sustainability targets for FY20 together with its expanded suite of sustainability targets for FY21. Newcrest’s Sustainability Report for FY20 can be located within the Sustainability section of its website (www.newcrest.com).

    Interactive Analyst CentreTM

    Newcrest’s financial and operational information can now be viewed via the Interactive Analyst CentreTMwhich is locatedunder the Investor tab on Newcrest’s website (www.newcrest.com). This interactive tool allows users to chart and export Newcrest’s current and historical results for further analysis.

    Sandeep Biswas
    Managing Director and Chief Executive Officer

    Gold Production Summary

    December 2020
    Quarter
    Mine
    Production
    Tonnes
    (000’s)(23)
    Tonnes
    Treated

    (000’s)
    Head
    Grade
    (g/t Au)
    Gold
    Recovery

    (%)
    Gold
    Production
    (oz)
    Gold Sales
    (oz)
    All-In
    Sustaining
    Cost

    ($/oz)(2)
    Cadia East Panel Cave 1763
    Cadia East Panel Cave 26,304
    Cadia East Panel Cave 2-3284
    Cadia(24)7,3528,2460.9577.2194,088194,183(6)
    Telfer Open Pit11,0513,5020.8475.370,774
    Telfer Underground6115791.5285.023,775
    Telfer Dump Leach4,305
    Telfer11,6624,0810.9477.598,85587,9921,560
    Lihir7,3263,6912.2774.2200,173170,3081,438
    Red Chris5,5081,5300.4255.511,37512,6413,278
    Fruta del Norte(25)30,98630,986810
    Total31,84817,5491.1875.4535,477496,110968

     

    All figures are shown at 100%, except for Red Chris which is shown at Newcrest’s 70% share and Fruta del Norte which is shown at Newcrest’s 32% attributable share through its 32% equity interest in Lundin Gold Inc.

    Copper Production Summary

    December 2020
    Quarter
    Copper Grade
    (%)
    Copper Recovery
    (%)
    Concentrate
    Produced

    (tonnes)
    Metal Production
    (tonnes)
    Cadia0.3982.1112,08726,643
    Telfer Open Pit0.0652.812,6761,050
    Telfer Underground0.2788.213,1441,393
    Telfer0.0968.525,8202,443
    Red Chris0.4579.624,9225,471
    Total0.2980.6162,82934,557

     

    All figures are shown at 100%, except for Red Chris which is shown at Newcrest’s 70% share.

    Silver Production Summary

    December 2020
    Quarter
    Tonnes Treated
    (000’s)
    Silver Production
    (oz)
    Cadia8,246167,864
    Telfer4,08128,047
    Lihir3,69110,126
    Red Chris1,53024,733
    Total17,549230,769

     

    All figures are shown at 100%, except for Red Chris which is shown at Newcrest 70% share.

    All-In Sustaining Cost – December 2020 Quarter

    3 Months to 31 December 2020
    UnitsCadiaTelferLihirRed Chris Corp/
    Other
    Group(26)
    Gold Producedoz194,08898,855200,17311,375–504,491
    Mining$/oz prod.1667792361,951–355
    Milling$/oz prod.3064334561,154–409
    Administration and other$/oz prod.1111793141,340–233
    Lease adjustments$/oz prod(3)(24)(6)––(8)
    Third party smelting, refining and transporting costs(27)$/oz prod.1701003732–102
    Royalties$/oz prod.102534468–69
    By-product credits$/oz prod.(1,014)(167)(1)(3,797)–(509)
    Ore inventory adjustments(28)$/oz prod.25(35)8387–37
    Production stripping adjustments(28)$/oz prod.––(131)(417)–(61)
    AOD adjustments(28)$/oz prod.–21–––4
    Net Cash Costs$/oz prod.(137)1,3399981,118–631
    Gold Soldoz194,18387,992170,30812,641–465,125
    Adjusted operating costs(29)$/oz sold(131)1,3551,0341,263–615
    Corporate general & administrative costs(30),(31)$/oz sold––––5757
    Reclamation and remediation costs$/oz sold551256–9
    Production stripping $/oz sold––154375–67
    Advanced operating development$/oz sold–(24)–––(5)
    Capital expenditure (sustaining)$/oz sold1151642281,58014219
    Exploration (sustaining)$/oz sold2192(49) –4
    Leases (sustaining)$/oz sold341853–13
    All-In Sustaining Cost$/oz sold(6)1,5601,4383,278 71979
    Growth and development costs(31)$/oz sold––––77
    Capital expenditure (non-sustaining)(32)$/oz sold568–10930211297
    Exploration (non-sustaining)$/oz sold–2–409 5264
    Leases (non-sustaining)$/oz sold6––––2
    All-In Cost$/oz sold5681,5621,5473,9891411,349
    Depreciation and amortisation(33)$/oz sold2592503741,17812336

    All figures are shown at 100%, except for Red Chris which is shown at 70%. AISC and AIC may not calculate based on amounts presented in these tables due to rounding.

    All-In Sustaining Cost – Six months to 31 December 2020

    6 Months to 31 December 2020
    UnitsCadiaTelferLihirRed Chris Corp/ OtherGroup
    Gold Producedoz390,592185,307377,51024,012– 977,421(34)
    Mining$/oz prod.1738482471,635–365
    Milling$/oz prod.3124635451,060–449
    Administration and other$/oz prod.1021942771,223–215
    Lease Adjustments$/oz prod(3)(28)(5)––(9)
    Third party smelting, refining and transporting costs(35)$/oz prod.1591133649–102
    Royalties$/oz prod.97524764–69
    By-product credits$/oz prod.(927)(171)(1)(3,623)–(493)
    Ore inventory adjustments(36)$/oz prod.12(15)7993–35
    Production stripping adjustments(36)$/oz prod.––(151)(789)–(77)
    AOD adjustments(36)$/oz prod.–10–––2
    Net Cash Costs$/oz prod.(75)1,4661,041312–658
    Gold Soldoz389,329173,089381,13924,475–968,032
    Adjusted operating costs(37)$/oz sold(79)1,4781,031276–645
    Corporate general & administrative costs(38),(39)$/oz sold––––4646
    Reclamation and remediation costs$/oz sold551064–9
    Production stripping $/oz sold––150774–78
    Advanced operating development$/oz sold–(11)–––(2)
    Capital expenditure (sustaining)$/oz sold1221461551,80910192
    Exploration (sustaining)$/oz sold3141– –4
    Leases (sustaining)$/oz sold344538–12
    All-In Sustaining Cost$/oz sold541,6761,3522,96156984
    Growth and development costs(39)$/oz sold––––66
    Capital expenditure (non-sustaining)(40)$/oz sold524–762909257
    Exploration (non-sustaining)$/oz sold–3–3825061
    Leases (non-sustaining)$/oz sold6––––2
    All-In Cost$/oz sold5841,6791,4283,6331211,310
    Depreciation and amortisation(41)$/oz sold2522533631,16312330

     

    All figures are shown at 100%, except for Red Chris which is shown at 70%. AISC and AIC may not calculate based on amounts presented in these tables due to rounding.

     

    Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7614/73004_newcrest_image1_560.jpg

    Simplified Lihir Pit Material Flow – December 2020 Quarter

    To view an enhanced version of this graphic, please visit:
    https://orders.newsfilecorp.com/files/7614/73004_newcrest_image1.jpg

     

     

    Cannot view this image? Visit: https://orders.newsfilecorp.com/files/7614/73004_newcrest_image2_560.jpg

    Simplified Lihir Process Flow – December 2020 Quarter

    To view an enhanced version of this graphic, please visit:
    https://orders.newsfilecorp.com/files/7614/73004_newcrest_image2.jpg

    Corporate Information

    Board

     Peter Hay Non-Executive Chairman 
     Sandeep Biswas  Managing Director and CEO 
     Gerard Bond  Finance Director and CFO 
     Philip Aiken AM  Non-Executive Director 
     Roger Higgins Non-Executive Director 
     Sally-Anne Layman Non-Executive Director  
     Vickki McFadden Non-Executive Director 
     Peter Tomsett Non-Executive Director 

     
    Company Secretaries

    Maria Sanz Perez and Claire Hannon

    Registered & Principal Office
    Level 8, 600 St Kilda Road, Melbourne, Victoria, Australia 3004
    Telephone: +61 (0)3 9522 5333
    Facsimile: +61 (0)3 9522 5500
    Email: corporateaffairs@newcrest.com.au
    Website: www.newcrest.com

    Stock Exchange Listings

     Australian Securities Exchange (Ticker NCM)
     Toronto Stock Exchange (Ticker NCM)
     PNGX Markets Limited (Ticker NCM)
     New York ADR’s (Ticker NCMGY)

     
    Forward Shareholder Enquiries to:

    Australia:
    Link Market Services
    Tower 4, 727 Collins Street
    Docklands, Victoria, 3008
    Australia
    Telephone: 1300 554 474
    +61 (0)2 8280 7111
    Facsimile: +61 (0)2 9287 0303
    Email: registrars@linkmarketservices.com.au
    Website: www.linkmarketservices.com.au

    Canada:
    AST Trust Company (Canada)
    P.O. Box 700, Station B
    Montreal, Quebec, H3B 3K3
    Canada
    +1 800 387 0825
    inquiries@astfinancial.com
    www.astfinancial.com

    Substantial Shareholder(s)(42) at 31 December 2020

    BlackRock Group 10.2%
    Allan Gray / Orbis Group 9.9%
    Van Eck Associates Corporation 5.1%
    The Vanguard Group 5.0%

     
    Issued Share Capital

    At 31 December 2020, Newcrest’s issued capital was 816,556,534 ordinary shares.

    Quarterly Share Price Activity

     HighLowClose
     A$A$A$
     Oct – Dec 2020 32.00  25.78 25.78

     

    Forward Looking Statements

    This document includes forward looking statements and forward looking information within the meaning of securities laws of applicable jurisdictions. Forward looking statements can generally be identified by the use of words such as “may”, “will”, “expect”, “intend”, “plan”, “estimate”, “anticipate”, “believe”, “continue”, “objectives”, “targets”, “outlook” and “guidance”, or other similar words and may include, without limitation, statements regarding estimated reserves and resources, certain plans, strategies, aspirations and objectives of management, anticipated production, study or construction dates, expected costs, cash flow or production outputs and anticipated productive lives of projects and mines. Newcrest continues to distinguish between outlook and guidance. Guidance statements relate to the current financial year. Outlook statements relate to years subsequent to the current financial year.

    These forward looking statements involve known and unknown risks, uncertainties and other factors that may cause Newcrest’s actual results, performance and achievements or industry results to differ materially from any future results, performance or achievements, or industry results, expressed or implied by these forward-looking statements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which Newcrest operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation. For further information as to the risks which may impact on Newcrest’s results and performance, please see the risk factors included in the Annual Information Form dated 13 October 2020 lodged with ASX and SEDAR.

    Forward looking statements are based on Newcrest’s good faith assumptions as to the financial, market, regulatory and other relevant environments that will exist and affect Newcrest’s business and operations in the future. Newcrest does not give any assurance that the assumptions will prove to be correct. There may be other factors that could cause actual results or events not to be as anticipated, and many events are beyond the reasonable control of Newcrest. Readers are cautioned not to place undue reliance on forward looking statements, particularly in the current economic climate with the significant volatility, uncertainty and disruption caused by the COVID-19 pandemic. Forward looking statements in this document speak only at the date of issue. Except as required by applicable laws or regulations, Newcrest does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in assumptions on which any such statement is based.

    Non-IFRS Financial Information

    Newcrest results are reported under International Financial Reporting Standards (IFRS). This document includes non-IFRS financial information within the meaning of ASIC Regulatory Guide 230: ‘Disclosing non-IFRS financial information’ published by ASIC and within the meaning of Canadian Securities Administrators Staff Notice 52-306 – Non-GAAP Financial Measures. Such information includes All-In Sustaining Cost (AISC) and All-In Cost (AIC) as per updated World Gold Council Guidance Note on Non-GAAP Metrics released in November 2018. AISC will vary from period to period as a result of various factors including production performance, timing of sales and the level of sustaining capital and the relative contribution of each asset. AISC Margin reflects the average realised gold price less AISC per ounce sold.

    These measures are used internally by Newcrest management to assess the performance of the business and make decisions on the allocation of resources and are included in this document to provide greater understanding of the underlying performance of Newcrest’s operations. The non-IFRS information has not been subject to audit or review by Newcrest’s external auditor and should be used in addition to IFRS information. Such non-IFRS information/non-GAAP measures do not have a standardised meaning prescribed by IFRS and may be calculated differently by other companies. Although Newcrest believes these non-IFRS/non-GAAP financial measures provide useful information to investors in measuring the financial performance and condition of its business, investors are cautioned not to place undue reliance on any non-IFRS financial information/non-GAAP financial measures included in this document. When reviewing business performance, this non-IFRS information should be used in addition to, and not as a replacement of, measures prepared in accordance with IFRS, available on Newcrest’s website and the ASX and SEDAR platforms.

    Technical and Scientific Information

    The technical and scientific information contained in this document relating to Wafi-Golpu and Lihir was reviewed and approved by Craig Jones, Newcrest’s Chief Operating Officer PNG, FAusIMM and a Qualified Person as defined in National Instrument
    43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). The technical and scientific information contained in this document relating to Cadia was reviewed and approved by Philip Stephenson, Newcrest’s Chief Operating Officer Australia and Americas, FAusIMM and a Qualified Person as defined in NI 43-101.

    Competent Persons’ Statement

    The information in this document that relates to Mineral Resources has been extracted from the release titled “Initial Inferred Mineral Resource estimate for Havieron of 3.4Moz of gold and 160Kt of copper” dated 10 December 2020 and which is available to view at www.asx.com.au under the code “NCM” (the original release) and on Newcrest’s SEDAR profile. Newcrest confirms that it is not aware of any new information or data that materially affects the information included in the original release and that all material assumptions and technical parameters underpinning the estimates in the original release continue to apply and have not materially changed. Newcrest confirms that the form and context in which the competent persons’ findings are presented have not been materially modified from the original release.

    Authorised by the Newcrest Disclosure Committee

    For further information please contact

    Investor Enquiries

    Tom Dixon
    +61 3 9522 5570
    +61 450 541 389
    Tom.Dixon@newcrest.com.au

    Ben Lovick
    +61 3 9522 5334
    +61 407 269 478
    Ben.Lovick@newcrest.com.au

    North American Investor Enquiries

    Ryan Skaleskog
    +1 866 396 0242
    +61 403 435 222
    Ryan.Skaleskog@newcrest.com.au

    Media Enquiries

    Tom Dixon
    +61 3 9522 5570
    +61 450 541 389
    Tom.Dixon@newcrest.com.au

    Annie Lawson
    +61 3 9522 5750
    +61 409 869 986
    Annie.Lawson@newcrest.com.au

    This information is available on our website at www.newcrest.com

    Appendix

    Reconciliation of Newcrest’s operational performance including its 32% attributable share of Fruta del Norte through its 32% equity interest in Lundin Gold Inc.

    Gold productionMetric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    Gold production – Newcrest operationsoz504,491472,929977,421
    Gold production – Fruta del Norte (32%)(43)oz30,98630,16061,146
    Gold productionoz535,477503,0891,038,566

     

    All-In Sustaining CostMetric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    All-in Sustaining Cost – Newcrest operations$m455498953
    All-in Sustaining Cost – Fruta del Norte (32%)(43),(44)$m251439
    All-In Sustaining Cost$m480512992
    Gold ounces sold – Newcrest operationsoz465,125502,907968,032
    Gold ounces sold – Fruta del Norte (32%)(43),(44)oz30,98619,89150,877
    Total gold ounces sold oz496,110522,7981,018,908
    All-In Sustaining Cost – Newcrest operations$/oz979990984
    All-In Sustaining – Fruta del Norte (32%)(43),(44)$oz810728778
    All-In Sustaining Cost $/oz968980974

     

    All-In Sustaining MarginMetric Dec 2020
    Qtr
    Sep 2020
    Qtr
    YTD
    FY21
    Realised gold price(45)$/oz1,8151,8371,826
    All-In Sustaining Cost – Newcrest operations$/oz979990984
    All-In Sustaining Cost margin$/oz836847842

     


    1See information under heading “Non-IFRS Financial Information” on Page 18 of this report for further information.

    2Includes 31koz andanestimated reduction of $11/oz based on Newcrest’s 32% attributable shareof Fruta del Norte. Refer to the Appendix for calculation andfurther details.

    3Newcrest’s AISC margin has been determined by deducting the All-In Sustaining Cost attributable to Newcrest’s operations from Newcrest’s realised gold price.Refer to the Appendix for details.

    4The initial Inferred Mineral Resource estimate is presented on a 100% basis. As announced on 30 November 2020, Newcrest has now met the Stage 3 expenditure requirement (US$45 million) and is entitled to earn an additional 20% joint venture interestin addition to its existing 40% interest, resulting in an overall joint venture interest of 60% (Greatland Gold 40%).

    5Per tonne of ore treated and compared to a baseline of FY18 emissions. Subject to market and operating conditions in respect of Cadia and the Rye ParkWind Farm

    6Total Recordable Injury Frequency Rate (injuries per million hours). TRIFR for FY20 includes safety results for Red Chris from acquisition.

    7Due to the negligible impact of Fruta del Norte on Newcrest’s Group AISC for FY20 it has been excluded from the FY20 calculation.

    8AISC for the period ending 31 December 2019 has been restated to reflect adjustments applied to Red Chris following the completion of acquisition and year end processes.

    9Realised metal prices are the US$ spot prices at the time of sale per unit of metal sold (net of Telfer gold production hedges), excluding deductions related to treatment and refining charges and the impact of price related finalisations for metals in concentrate. The realised price for the September and December quarters and for FY20 and FY21 has been calculated using sales ounces generated by Newcrest’s operations only (i.e. excluding Fruta del Norte).

    10The achievement of guidance is subject to market and operating conditions. Newcrest’s guidance for Fruta del Norte is an annualised figure based on Lundin Gold Inc’s production guidance for 1 July 2020 to 31 December 2020. See Appendix for further details.

    11The figures shown represent Newcrest’s 70% share of the unincorporated Red Chris JV.Production outcomes for FY20 are reported from the date of acquisition (15 August 2019).

    12 The figures shown represent 100%. Prior to the divestment on 4 March 2020, Newcrest owned 75% of Gosowong through its holding in PT Nusa Halmahera Minerals, an incorporated joint venture. Production and financial outcomesfor FY20 represent Newcrest’s period of ownership to the divestment date.

    13The figures shown represent Newcrest’s 32%attributable share, through its 32% equity interest in Lundin Gold Inc.

    14From Newcrest’s operations only and does not include Newcrest’s 32% attributable share of Fruta del Norte through its 32%equityinterest in Lundin Gold Inc.

    15Subsequent to the release of the December 2019 Quarterly Report, an audit adjustment was applied which reduced gold sales by ~6koz, copper sales by ~49kt and AISC by $5/oz respectively.

    16Per tonne of ore treated and compared to a baseline of FY18 emissions. Subject to market and operating conditions in respect of Cadia and the Rye Park Wind Farm.

    17 AISC margin calculated with reference to the Group average realised gold price.

    18The figures shown represent Newcrest’s 70% shareof the unincorporated Red Chris JV. Productionand financial outcomesfor FY20 are reported fromthe date of acquisition (15 August 2019).

    19AISC reported for the six month period to 31 December 2019 has been restated to reflect adjustments applied following the completion of acquisition and year end processes.

    20The initial Inferred Mineral Resource estimate is presented on a 100% basis. As announced on 30 November 2020, Newcrest has now met the Stage 3 expenditure requirement (US$45 million) and is entitled to earn an additional 20% joint venture interest in addition to its existing 40% interest, resulting in an overall joint venture interest of 60% (Greatland Gold 40%).

    21 On a 100% basis and converted to US$ using an exchange rate of 0.77, which was the spot rate on the date of the initial announcement..

    22 In addition, the development of any underground mine at the Havieron Project will also be subject to the completion of a successful exploration program and further studies, market and operating conditions, Board approvals, and a positive decision to mine.

    23 Mine production for open pit and underground includes ore and waste.

    24 Includes development tonnesfrom the Cadia East PC2-3 project. Costs associated with this production were capitalised and are not included in the AISC calculation in this report.

    25Due to timing of Lundin Gold’s December quarterly report, Newcrest has estimated its 32% attributable share, through its 32% equity interest in Lundin Gold Inc,of Fruta del Norte’s All-In Sustaining Cost for the quarter. For the purposes of All-In Sustaining Cost, Newcrest has assumed that production is equal to sales. Refer to the Appendix for further details.

    26Group AISC is for Newcrest’s operations only and does not include Newcrest’s 32% attributable share of Fruta del Norte.

    27 Includes deductions related to treatment and refining charges for metals in concentrate

    28 Represents adjustment for ore inventory movements, removal of production stripping costs and movement in Advanced Operating Development costs

    29 Adjusted operating costs represents net cash costs adjusted for finished goods inventory movements, divided by ounces sold

    30 Corporate general & administrative costs includes share-based remuneration

    31 Costs of this nature were previously reported within Corporate Costs. In accordance with the updated World Gold Council guidance, growth and development costs are now presented in AIC.

    32Represents spend on major projects that are designed to increase the net present value of the mine are not related to current production. Significant projects in the current period include key expansion projects at Cadia (including PC2-3 developmentand the molybdenum plant)and Lihir (Seepage Barrier feasibilitystudy, front end recovery and HV upgrade).

    33 Depreciation and amortisation of mine site assets is determined on the basis of the lesser of the asset’s useful economic life and the life of the mine.Life-of-mine assets are depreciated according to units of production and the remainder on a straight line basis. Depreciation and amortisation does not form part of All-In Sustaining Cost or All-in Cost with the exception of amortisation on reclamation and remediation (rehabilitation) assets

    34Group AISC is for Newcrest’s operations only and does not include Newcrest’s 32% attributable share of Fruta del Norte.

    35 Includes deductions related to treatment and refining charges for metals in concentrate

    36 Represents adjustment for ore inventory movements, removal of production stripping costs and movement in Advanced Operating Development costs

    37 Adjusted operating costs represents net cash costs adjusted for finished goods inventory movements, divided by ounces sold

    38 Corporate general & administrative costs includes share-based remuneration

    39 Costs of this nature were previously reported within Corporate Costs. In accordance with the updated World Gold Council guidance, growth and development costs are now presented in AIC.

    40Represents spend on major projects that are designed to increase the net present value of the mine are not related to current production. Significant projects in the year include key expansion projects at Cadia (including PC2-3 feasibility study and the molybdenum plant) and Lihir (Seepage Barrier feasibility study, front end recovery and HV upgrade).

    41 Depreciation and amortisation of mine site assets is determined on the basis of the lesser of the asset’s useful economic life and the life of the mine.Life-of-mine assets are depreciated according to units of production and the remainder on a straight line basis. Depreciation and amortisation does not form part of All-In Sustaining Cost or All-in Cost with the exception of amortisation on reclamation and remediation (rehabilitation) assets.

    42As notified to Newcrest under section 671B of the Corporations Act 2001

    43The All-In Sustaining Cost and gold ounces sold outcomes for Fruta del Norte for the September 2020 quarter have been restated following the release of Lundin Gold’s September quarterly report on 9 November 2020. Newcrest’s All-In Sustaining Cost outcome of $980/oz for the September quarter remains unchanged.

    44 Due to timing of Lundin Gold’s December quarterly report, Newcrest has estimated its 32% attributable share, through its 32% equity interest in Lundin Gold Inc, of Fruta del Norte’s All-In Sustaining Cost for the quarter. The estimate for All-In Sustaining Cost was derived by taking the mid-point of Newcrest’s guidance range of $810/oz (at Newcrest’s 32% attributable share). For the purposes of AISC, Newcrest has assumed that production is equal to sales. A true-up will be made in the March quarter once the outcomes for the December quarter are known. Newcrest’s guidance with respect to the gold production of Fruta del Norte is based on Lundin Gold’s July to December 2020 guidance of 150,000 – 170,000 ounces which has been annualised on the assumption that production levels will be same for the January to June 2021 period (presented at 32% and rounded to nearest 5koz). With respect to Newcrest’s guidance for AISC, the dollar million range has been derived by multiplying the low end of annualised production of Newcrest’s guidance by the high end of Lundin Gold’s July – December 2020 AISC guidance of $770/oz – $850/oz, and the high end of annualised production of Newcrest’s guidance multiplied by the low end of the same AISC guidance range.

    45Realised metal prices are the US$ spot prices at the time of sale per unit of metal sold (net of Telfer production hedges), excluding deductions related to treatment and refining charges and the impact of price related finalisations for metals in concentrate. The realised price for the September and December quarters and for FY21 has been calculated using sales ounces generated by Newcrest’s operations only (i.e. excluding Fruta del Norte).

    To view the source version of this press release, please visit https://www.newsfilecorp.com/release/73004

    News Provided by Newsfile via QuoteMedia

    gold investingncm:au
    The Conversation (0)

    Go Deeper

    AI Powered
    AGNICO EAGLE REPORTS SECOND QUARTER 2025 RESULTS - RECORD FREE CASH FLOW WITH ANOTHER QUARTER OF STRONG PRODUCTION AND COST PERFORMANCE; BALANCE SHEET FURTHER STRENGTHENED BY TRANSITION TO NET CASH POSITION AND LONG-TERM DEBT REPAYMENT

    AGNICO EAGLE REPORTS SECOND QUARTER 2025 RESULTS - RECORD FREE CASH FLOW WITH ANOTHER QUARTER OF STRONG PRODUCTION AND COST PERFORMANCE; BALANCE SHEET FURTHER STRENGTHENED BY TRANSITION TO NET CASH POSITION AND LONG-TERM DEBT REPAYMENT

    Barrick Builds Momentum in Q2 With Higher Production, Stronger Cash Flows and Key Growth Projects on Track

    Latest News

    More News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Australia Investing Stocks

    OneGold

    OneGold (/GCSPUSD)
    /GCSPUSD

    Heliostar Metals

    Heliostar Metals (HSTR:CC)
    HSTR:CC

    Investor Insight

    Heliostar combines production of ~50,000–55,000 oz in 2026 with a pipeline of high-margin development assets in Mexico led by Ana Paula. Supported by operating cash flow from La Colorada and San Agustin, a debt-free balance sheet and strategic expansion into the US with the Goldstrike project in Utah, the company is positioned to scale into a 500,000 oz per year gold producer.

    Overview

    Heliostar Metals (TSX:HSTR,OTCQX:HSTXF,FRA:RGG1) is an emerging gold producer focused on building a mid-tier, multi-asset production platform, anchored in Mexico and complemented by strategic expansion into the United States.

    Heliostar Metals - open-pit mine

    The company has rapidly transformed from an explorer into a producer through disciplined, value-accretive acquisitions, assembling a 100 percent-owned portfolio of producing mines, advanced development projects and exploration assets. This platform provides both immediate cash flow and long-term scalability.

    In 2025, Heliostar produced 34,098 gold equivalent ounces, generated US$47.4 million in mine operating earnings, and ended the year with US$40.6 million in cash and no debt, demonstrating strong execution and financial discipline.

    Production is expected to increase to 50,000–55,000 oz in 2026, driven by La Colorada and San Agustin. Development of Ana Paula and Cerro del Gallo supports a clear pathway to 500,000 oz annual production by 2030.

    Heliostar Metals portfolio

    In 2026, Heliostar formed part of the OTCQX’s Best 50 top-performing companies. The company ranked 8th overall, joining 7 other mining companies in the top 10.

    Beyond its core Mexican portfolio, the addition of the Goldstrike project in Utah introduces further growth optionality, reinforcing Heliostar’s strategy of acquiring and advancing underexplored assets with strong development potential. With a staged growth strategy, strong margins and an expanding resource base, Heliostar is positioned to evolve into a 500,000 oz per year gold producer by 2030.

    Company Highlights

    • Growing Production Base: Two producing mines targeting 50,000–55,000 oz of gold in 2026, generating cash flow to fund development.
    • Clear Path to Mid-Tier Scale: Staged growth targeting annual production of 500,000 oz by 2030.
    • High-Margin Flagship Asset: The Ana Paula PEA outlines 101,000 oz/year production (post ramp-up) with strong economics, including US$1,012M NPV5% and 51.3% IRR at higher gold price assumptions, supporting a 2028 production target.
    • Self-Funded Growth Model: Generated US$47.4 million in mine operating earnings (2025) with US$40.6 million in cash and zero debt, reducing reliance on equity dilution.
    • Robust Resource Base: Approximately 7.3 Moz measured and indicated gold resources plus ~1.4 Moz inferred, supporting long-term scalability.
    • High-Quality Development Pipeline: Cerro del Gallo targeting 86,000 GEO/year at US$1,390 AISC, alongside San Antonio’s production potential.
    • Strategic Expansion in the US: Acquisition of the Goldstrike project in Utah adds near-surface oxide potential and long-term growth optionality.
    • Strong Institutional Backing: Approximately 53 percent institutional ownership, complemented by high-net-worth investors and management alignment.

    Key Projects

    Ana Paula (Flagship Development Project)

    Heliostar Metals \u200bAna Paula Project

    Ana Paula is a high-grade underground gold project in Guerrero and the cornerstone of Heliostar’s long-term growth strategy.

    The November 2025 PEA outlines a 9 year mine life with 101,000 oz/year production, 874,700 oz total output, and strong economics, including a US$1,012M NPV5% and a 51.3 percent IRR, supported by a low AISC of US$1,011/oz.

    The project hosts approximately 742,000 oz measured and indicated at 5.4 g/t and 514,000 oz inferred, highlighting its high-grade profile and expansion potential.

    Heliostar Metals Guerrero Gold Belt

    With a feasibility study targeted for H1 2027 and construction expected in H2 of the same year, Ana Paula is expected to become the primary driver of Heliostar’s transition to mid-tier production.

    The company is targeting production at Ana Paula in 2028.

    La Colorada Mine

    Heliostar Metals \u200bLa Colorada Mine

    La Colorada in Sonora is a key cash-flowing asset that underwent a successful turnaround in 2025. The mine hosts reserves of 376,000 ounces of gold grading 0.68 g/t in 17.1 million tonnes of ore.

    The mine is expected to produce 20,000–22,300 oz in 2026 at AISC of US$1,775–1,875/oz, supported by a six-year mine life and approximately 286,000 oz total production profile.

    Mining at the project’s Veta Madre pit commenced in August 2026, a milestone that the company ties to its plan to secure cash flow through 2027 and 2028 to support construction at Ana Paula.

    Ongoing drilling, pit expansions and underground potential provide meaningful upside, reinforcing its role as a core funding engine for development.

    Heliostar Metals 2026 Guidance

    San Agustin Mine

    San Agustin in Durango is a restarted oxide heap-leach operation providing near-term production growth and cash flow.

    2026 guidance targets 30,000–32,700 oz of gold at AISC of US$2,150–2,250/oz, following a low-capital restart funded from the company’s balance sheet.

    The asset offers additional upside through oxide expansion and sulphide exploration, supporting potential mine life extension.

    Cerro del Gallo Project

    Cerro del Gallo is a large-scale gold-silver development project in Guanajuato and a key driver of future production growth.

    The 2025 PFS outlines ~86,000 GEO/year over a 15-year mine life at US$1,390 AISC, with strong economics, including US$972 million NPV5% and 59.3 percent IRR at higher gold price assumptions.

    The project is expected to play a central role in advancing Heliostar towards the goal of 500,000 oz annual production by 2030.

    San Antonio Project

    San Antonio is a 100%-owned heap-leach development project offering strong optionality and long-life production potential.

    The project hosts approximately 1.74 million ounces of measured and indicated gold and demonstrates attractive optionality, including potential 80,000 oz/year production and low AISC of US$1,063/oz.

    As permitting advances, San Antonio represents a key medium-term growth opportunity within the portfolio.

    Goldstrike Project (Utah, USA)

    Goldstrike is a newly acquired gold project that expands Heliostar’s footprint in the United States and adds exploration and development optionality. The property currently hosts an Indicated resource of 975 kilo ounces at 0.46 g/t of gold.

    The project hosts a near-surface oxide gold system with historical production of approximately 209,000 ounces of gold and defined mineralization, offering potential for low-cost, open-pit heap-leach development. Its geological setting and existing dataset provide a strong foundation for resource growth and technical advancement.

    Goldstrike complements Heliostar’s acquisition strategy by adding a scalable, underexplored asset outside its core Mexican portfolio, enhancing long-term growth potential.

    Drilling is underway at Goldstrike to test the antimony and gold potential of both Antimony Ridge and Antimony Knoll, with results expected towards the end of 2026.

    Management Team

    Charles Funk – President & CEO

    Charles Funk has over 20 years of experience in exploration and business development, including senior roles at Newcrest Mining and OZ Minerals. He led the Panuco discovery for Vizsla Silver, demonstrating strong capability in identifying high-value deposits. At Heliostar, he has driven the company’s transformation into a multi-asset gold producer through disciplined acquisitions. His leadership is focused on building a scalable, mid-tier gold platform.

    Gregg Bush – Chief Operating Officer (COO)

    Gregg Bush is a proven mine builder with extensive experience in mine development, integration and operations. He previously served as COO of Capstone Mining and held senior leadership roles at Equinox Gold. Bush brings deep expertise in optimizing operating assets and advancing projects into production. He plays a key role in executing Heliostar’s production growth strategy.

    Sam Anderson – VP Projects

    Sam Anderson has approximately 25 years of experience in mine geology and project development, including 17 years at Newmont. He played a key role in advancing the Merian Mine from resource stage through construction to steady-state production. His expertise spans exploration, resource expansion and project execution. At Heliostar, he leads the advancement of key development assets.

    Mike Gingles – VP Corporate Development

    Mike Gingles brings more than 35 years of experience in the mining industry, specializing in corporate development and M&A. He played a leadership role in major transactions including Pueblo Viejo and Turquoise Ridge. His expertise includes project evaluation, deal structuring and strategic partnerships. He supports Heliostar’s acquisition-driven growth strategy.

    Hernan Dorado – VP Sustainability & Special Projects

    Hernan Dorado is a fifth-generation miner with over 20 years of experience in mining operations, particularly in Mexico. He was a founding member of Guanajuato Silver, where he served as COO. His expertise includes permitting, community engagement and sustainability practices. He ensures responsible development across Heliostar’s operations.

    Vitalina Lyssoun – Chief Financial Officer (CFO)

    Vitalina Lyssoun is a Chartered Professional Accountant (CPA, CA) with more than 16 years of experience in financial management within the resource sector. She has extensive expertise in public company reporting, compliance and internal controls. Prior to joining Heliostar, she led the corporate accounting function at Gatos Silver. Her experience spans multiple international jurisdictions.

    Stephen Soock – VP Investor Relations & Development

    Stephen Soock has nearly 20 years of experience across mining operations and capital markets. He began his career in technical roles at mine sites before transitioning to equity research, where he spent eight years covering growth-stage mining companies. He is a mining engineer and CFA Charterholder. At Heliostar, he leads investor relations and supports capital markets strategy.

    Silver Hammer Mining

    Silver Hammer Mining (HAMR:CC)
    HAMR:CC

    Renforth Resources

    Renforth Resources (RFR:CC)
    RFR:CC

    Orosur Mining

    OMI:CC

    GoldInxs Mining

    GoldInxs Mining (INXS:CC)
    INXS:CC

    Investor Insight

    GoldInxs Mining Corp. (TSXV:INXS, OTCQB: INXGF) provides investors with exposure to early-stage gold-copper exploration in British Columbia, leveraging a portfolio of high-potential projects in Tier 1 jurisdictions, within established gold districts, surrounded by strong regional infrastructure and led by an experienced management team committed to accelerating discovery and delivering shareholder value.

    GoldInxs Mining Corp

    Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube.

    Overview

    GoldInxs Mining Corp. is a discovery-focused mineral exploration company dedicated to identifying and advancing high-potential copper-gold assets in proven geological belts. The Company's strategy centers on acquiring overlooked and underexplored projects with large-scale potential, applying modern exploration techniques to rapidly evaluate targets and unlock shareholder value through discovery.

    The Company’s. common shares started trading on the TSX Venture Exchange in July 2026 under the symbol INXS, positioning itself to capitalize on favorable copper and gold market fundamentals.

    GoldInxs Mining sample rocks

    Copper demand is forecasted to grow steadily through 2030, with the global copper market expected to expand to over US$340 billion by 2030, driven by electric vehicles, renewable energy and infrastructure growth.

    On the other hand, gold continues to provide a safe-haven hedge against policy risks and market volatility, making GoldInxs’ dual focus on copper and gold particularly compelling for investors.

    The Company’s portfolio is anchored by two priority projects: the Fishpot Project in central British Columbia, interpreted as an emerging, large epithermal system with strong infrastructure access and jurisdiction quality as well as early indications of blackwater-style mineralization, and the non-core Millar Project in the prolific B.C Golden Triangle, a district renowned for world-class discoveries. While surrounding deposits attracted billions of dollars in investment, Fishpot received only sporadic historical exploration despite widespread hydrothermal alteration and numerous anomalous gold, silver and copper results. Artemis Gold’s Blackwater Mine has announced tripling production with an intended $1.56B investment, which sits only 65 km from the Fishpot property.

    Backed by a management team with expertise in exploration, project development and capital markets, GoldInxs is positioned to rapidly advance its assets, deliver near-term exploration catalysts and create shareholder value through discovery and strategic growth.

    Company Highlights

    • Mining-friendly jurisdiction: Projects are in British Columbia, which ranked second in Canada and 20th globally in the 2025 Fraser Institute investment attractiveness rankings.
    • Flagship and district-scale assets: Portfolio is anchored by the flagship Fishpot Project (“Fishpot”) in central B.C., showing strong geological indicators of mineralization, blackwater-style mineralization potential and immense exploration upside potential with only 378 meters of historical drilling. Fishpot is strategically located in the same region as Artemis Gold’s Blackwater Mine and Evolution Mining’s optioned Clisbako property.
    • Clear path to 2026 catalysts: GoldInxs secured a drill permit for an upcoming maiden 2,000-metre drill program at Fishpot, near-term exploration programs are designed to define mineralized systems, outline blackwater-style potential and create shareholder value following the completion of a 3D IP survey and drill targeting.

    Key Projects

    Fishpot Project

    GoldInxs Mining Fishpot Project


    Fistpot property

    The Fishpot Project represents the cornerstone asset within the GoldInxs portfolio. Covering up to 5,500 hectares in Central British Columbia, and located ~95 km north of Quesnel, Fishpot hosts a large hydrothermal alteration system that exhibits many of the geological characteristics observed in major epithermal and intrusion-related gold systems throughout the region. Fishpot encompasses five claim blocks, held under an option to acquire 100 percent subject to a 2 percent NSR, representing a significant exploration opportunity in a highly prospective region.

    Fishpot represents a largely untested hydrothermal mineral system where multiple independent exploration datasets, including gold-silver-copper surface geochemistry, alteration and geology, airborne magnetics, 3D IP chargeability/resistivity and identified epithermal-to-potential-porphyry target environments, are converging to define drill targets, despite only 378 metres of historical drilling across two holes.

    Fishpot is situated within the highly prospective Stikine Terrane and is underlain by Hazelton Group volcanic rocks and intrusive units comparable to those associated with several significant deposits in British Columbia. Extensive quartz-sericite alteration, hydrothermal brecciation, pyrite mineralization and multi-element geochemical anomalies support the interpretation of a robust mineralizing system. Fishpot is strategically positioned near active and historical mining operations, including Artemis Gold’s Blackwater Deposit, Newton Gold Project, Capoose and 3Ts Project, underscoring its large-scale discovery potential. Importantly, based on early-exploration results, Fishpot shares several regional geological characteristics commonly associated with Blackwater-style gold systems, including felsic volcanics, strong alteration, pyrite-rich mineralization and gold-silver geochemical associations. Despite the similarities the Company cannot yet make any formal connections to the surrounding properties, nor can they guarantee that such deposits exist on their ground.

    Fishpot Exploration Technology: GoldInxs advanced its Fishpot targeting program by combining a conventional 3D IP survey with emerging Virtual DRILL™ remote-sensing technology as an additional targeting layer, using multiple geological, geochemical and geophysical datasets to refine and prioritize targets ahead of a planned ~2,000-metre drill program.

    Fishpot Drill Permit & Expansion: GoldInxs has received the required drilling permits and expanded Fishpot to 5,509 hectares, positioning the Company to proceed with its inaugural ~2,000-metre modern drill program on a property that has seen very limited historical drilling, while refining targets through integrated geological, geochemical and geophysical data.

    Despite multiple encouraging exploration indicators, Fishpot has been subjected to only two historic drill holes totaling 378 metres, leaving the broader mineral system largely untested and providing significant leverage to future exploration success.

    Recent exploration completed by GoldInxs generated the highest reported gold value on Fishpot to date, returning up to 5.65 g/t Au from surface sampling, while airborne geophysical surveys identified multiple coincident magnetic and geochemical anomalies that have strengthened the Company's exploration model and target pipeline.

    The 2025 program returned rock samples of up to 5.65 g/t Au, 11.35 g/t Ag and 0.42% Cu, while historical work reportedly returned up to 4.36 g/t Au and 3.2% Cu.

    The property exhibits the potential low-sulphidation epithermal targets at Fishpot North, intermediate-sulphidation signatures at Fishpot East, and a large central magnetic high being evaluated for potential porphyry mineralization at depth. The Company is focused on finalizing drill targeting and preparing for the inaugural diamond drill campaign at Fishpot in the coming months following completion of the IP survey. GoldInxs is preparing to drill-test a 5,509-hectare, largely undrilled hydrothermal system in central British Columbia where high-grade surface gold-silver-copper results, Blackwater-style geological characteristics and multiple coincident geophysical targets have converged to define a portfolio of high-priority exploration targets.

    Management Team

    Nick Michael – President and CEO

    Mr. Michael is a veteran mining executive and technical director with over 37 years of global experience spanning mine development, engineering and operational leadership. His expertise covers the full project lifecycle, including design, construction, technical due diligence and Independent Engineer assignments for institutional investors and project financiers. He also leads CJK Milling, a company focused on reprocessing historical mine waste to recover discarded gold decades ago, when it was less valuable.

    Carlo Rigillo, CPA, Chief Financial Officer

    Mr. Rigillo is an experienced Chartered Professional Accountant with over two decades of experience. He holds a Bachelor of Commerce from the University of Toronto.

    Barry Miller – Executive Chairman and Director

    Mr. Miller brings over 30 years of experience in public markets, including roles as a broker, consultant and financier. He is the founder of GoldInxs and has been actively involved in the resource sector through leadership positions, including as director of Tinova Resources Corp., an exploration company focused on tin and rare earth elements in British Columbia and Alaska.

    Tara Asfour - Vice President, Corporate Development and Communications

    An executive consultant with over 13 years of experience, Tara Asfour holds expertise in corporate development, capital markets, investor relations and strategic communications. She has led strategic financings, partnerships and offtake initiatives within the resource sector through previous corporate development and investor relations roles with multiple publicly listed companies.

    Al Fabbro – Director

    With over three decades of experience spanning both the mining and finance sectors, Mr. Fabbro previously led Yorkton Securities’ retail trading department and was part of its Natural Resources Group. He later served as Lead Director of Roxgold Inc. and currently holds executive leadership roles in the mining industry.

    Darcy Vis, P.Geo. – VP Exploration and Director

    Mr. Vis is an economic geologist with over 17 years of experience in mineral exploration. He has held senior technical roles across multiple exploration companies and is the President of Tripoint Geological Services Ltd. His expertise includes target generation, project evaluation and exploration program execution.

    Stephen Soock, P.Eng., CFA – Director

    Mr. Soock is a mining professional with nearly 20 years of experience spanning both technical operations and capital markets. He currently serves as Vice President, Investor Relations and Development at Heliostar Metals.

    Christopher Kelly, PQS, FCIArb – Director

    Mr. Kelly has over 15 years of experience in construction and natural resources. He holds a BSc in Construction Economics and Management and an MSc in Construction Law and Dispute Resolution, and runs Trachtala Consulting Ltd.

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES