- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
NexGen Energy has released a report outlining the radioactivity for an additional twenty holes at its solely owned, Rook I property.
NexGen Energy (TSX:NXE,NYSEMKT:NXE) has released a report outlining the radioactivity for an additional twenty holes comprising 7,969.5 m from the company’s feasibility stage drilling program at its solely owned, Rook I property in the Athabasca Basin of Saskatchewan.
As quoted from the press release:
Objective I: Conversion of Indicated Mineral Resources to Measured Category
This current phase of the 2019 drilling program is targeting the A2 and A3 High-Grade Domain mine planning sections at a spacing between 9.0 m and 16.7 m. The target spacing incorporates the results of a geostatistical data spacing report compiled by Clayton V. Deutsch from Resource Modeling Solutions based on 189 drill holes, totaling 121,923.15 m, which forms the basis of the Indicated Mineral Resource of 256.6 M lbs at 4.04 percent U3O8. All drill holes are collared at a steep inclination, then shallowed out between -55° and -60° before intersecting the target by utilizing the latest in directional drilling technology.
Highlights:
A2 High-Grade Domains and Sub-zone
- AR-19-229c2 intersected 46.5 m of total composite mineralization including 12.05 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 86.0 m section (602.0 to 688.0 m);
- AR-19-229c4 intersected 39.0 m of total composite mineralization including 8.55 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 88.0 m section (578.0 to 666.0 m);
- AR-19-230c3 intersected 30.5 m of total composite mineralization including 7.55 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 93.0 m section (564.0 to 657.0 m). Additionally, of the 7.55 m of off-scale mineralization intersected in the hole, 0.5 m of massive-to-semi massive pitchblende with minimum-greater-than-61,000 cps;
- AR-19-235c1 intersected 43.0 m of total composite mineralization including 7.15 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 93.0 m section (517.0 to 610.0 m). Additionally, of the 7.15 m of off-scale mineralization intersected in the hole, 3.0 m of massive-to-semi massive pitchblende with minimum-greater-than-61,000 cps;
- AR-19-236c2 intersected 26.0 m of total composite mineralization including 6.35 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 89.0 m section (579.0 to 668.0 m.
A3 High-Grade Domains
AR-19-231c2 intersected 48.0 m of total composite mineralization including 5.75 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within a 102.0 m section (469.0 to 571.0 m);
AR-19-232c3 intersected 26.0 m of total composite mineralization including 5.1 m of total composite off-scale radioactivity (>10,000 to >61,000 cps) within an 89.0 m section (560.0 to 649.0 m).
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.