East Africa Metals Provides Results from Drill Program at the Harvest and Adyabo Projects

Base Metals Investing

East Africa Metals Inc. (TSXV: EAM) (or the “Company”) is pleased to announce results from a multi targeted drill program at the Harvest and Adyabo Projects in the Arabian Nubian Shield of Ethiopia. The Company has conducted additional drill testing of the Harvest Project Mayshehagne and VTEM09 VMS prospects to potentially upgrade targets, confirm interpretation …

East Africa Metals Inc. (TSXV: EAM) (or the “Company”) is pleased to announce results from a multi targeted drill program at the Harvest and Adyabo Projects in the Arabian Nubian Shield of Ethiopia. The Company has conducted additional drill testing of the Harvest Project Mayshehagne and VTEM09 VMS prospects to potentially upgrade targets, confirm interpretation of mineralization, and assess targets for inclusion as potential satellite resource zones. Both prospects are located near the EAM’s Terakimti resource deposit. Drill intercepts continue to reflect very strong metal grades seen in previous drilling, and identifies the need for further delineation work on the VMS prospects.
As quoted in the press release:

Highlight intersections include:
At Silica Hill – 31.55 metres grading 9.40 grams per tonne gold, and 0.10 % copper, from 111.32 metres drill depth, and;
At VTEM09 – 24.06 metres grading 1.88 % copper, 3.08 grams per tonne gold, 66.4 grams per tonne silver, and 2.54 % zinc, from 35.84 metres drill depth, and;
At Mayshehagne – 21.19 metres grading 4.32 % copper, 1.04 grams per tonne gold, 35.9 grams per tonne silver, and 6.98 % zinc, from 36.58 metres drill depth.

Click here for the full text release

The Conversation (0)
×