• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Energy Market
    Energy News
    Energy Stocks
    • Energy Market
    • Energy News
    • Energy Stocks

    Denison Announces Stantec & ENGCOMP to Lead Pre-Feasibility Study for Wheeler River Project and Provides Update on Status of Gryphon Resource Estimate

    Written by Melissa Shaw
    |
    Jan. 04, 2018 08:36AM PST

    Denison Mines (“Denison” or the “Company”) (TSX:DML)(NYSE MKT:DNN)(NYSE American:DNN) is pleased to announce that it has retained Stantec Consulting (“Stantec”) and ENGCOMP Engineering and Computing Professionals (“ENGCOMP”) to lead and author the Pre-Feasibility Study (“PFS”) for the Wheeler River project, which is the largest undeveloped high-grade uranium project in the infrastructure rich eastern portion of …

    Denison Mines (“Denison” or the “Company”) (TSX:DML)(NYSE MKT:DNN)(NYSE American:DNN) is pleased to announce that it has retained Stantec Consulting (“Stantec”) and ENGCOMP Engineering and Computing Professionals (“ENGCOMP”) to lead and author the Pre-Feasibility Study (“PFS”) for the Wheeler River project, which is the largest undeveloped high-grade uranium project in the infrastructure rich eastern portion of the Athabasca Basin region in northern Saskatchewan.
    In addition to the Company’s in-house project development team, Denison has assembled a group of leading engineering and consulting firms, with mine development, metallurgical, and environmental experience applicable to the development of a large-scale uranium mining operation in northern Saskatchewan, to support the completion of the PFS for the Wheeler River project.

    The purpose of the PFS is to establish the best economic options for the development of Wheeler River’s Gryphon and Phoenix deposits into a large scale, low cost uranium mining operation.

    Click here to read the full text release. 

    pre feasibility studytsx:dmlathabasca basin
    The Conversation (0)

    Go Deeper

    AI Powered
    Skyharbour Resources (TSXV:SYH)

    Skyharbour Resources

    Standard Uranium

    Standard Uranium: Fuel the Future!

    Latest News

    Drilling Commences at Tundulu Rare Earths Project

    Tenement Application Expands Newmans Rare Earth Target Area

    Alvopetro Announces Q2 2026 Dividend of US$0.12 Per Share and Initial 183-D1 Well Results

    ROTH to Host Its 16th Annual London Conference, June 16-18, 2026

    QIMC Highlights Technical Advisory Role on First Atlas Matane Natural Hydrogen Project Following Quebec Parliamentary Committee Appearance

    More News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES