
December 14, 2021
GTI Resources Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have now completed 24 holes of its 50,000‐foot (~15,000 metre) ~100‐hole maiden drill program within exploration area 1 (Exp area1) at the Thor ISR uranium project in Wyoming’s Great Divide basin (Figure1).
Highlights:
- 24 holes completed to date of ~100‐hole maiden drill program
- 10 of 24 holes (42%) drilled to date met or exceeded the Grade Thickness (GT) cutoff with an average of 0.68GT
- Encouraging results continue with over 40% of holes drilled recording better than the minimum economic Grade Thickness (GT) cutoff of 0.2GT1
- Mineralisation continues to demonstrate characteristics conducive to ISR recovery
- 1st phase of drilling to conclude December 17th with balance of holes planned for early 2022
The first 24 drill holes at the Thor Project were completed for a total of 12,041 feet (3,670 metres) within Area 1 (Figures1&3). Typical economically viable ISR grade and GT cut‐offs are: 0.02% (200ppm) U3O8 and 0.2GT ‐‐ i.e., 10 ft (3m) @ 0.02% (200ppm) U3O8. Results from the first 24 holes (including those previously reported) were characterised by (Table1):
- 10 of 24 holes (42%) drilled to date met both grade and GT cutoff with an average of 0.68GT; and
- Of the remaining 14 holes 2 met grade cutoff but not GT, 6 had trace mineralisation & 6 were barren.
These results are in line with expectation and are viewed by the Company as indicative of high potential for economic ISR uranium mineralisation.
Click here for the full ASX Release
This article includes content from GTI Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
GTR:AU

Sign up to get your FREE
American Uranium Investor Kit
and hear about exciting investment opportunities.
- Corporate info
- Insights
- Growth strategies
- Upcoming projects
GET YOUR FREE INVESTOR KIT
The Conversation (0)
27 July
American Uranium
Disrupting the uranium supply chain through highly prospective ISR projects in Wyoming
Disrupting the uranium supply chain through highly prospective ISR projects in Wyoming Keep Reading...
11 August
Snow Lake Completes Due Diligence and Confirms Placement
GTI Energy (GTR:AU) has announced Snow Lake Completes Due Diligence and Confirms PlacementDownload the PDF here. Keep Reading...
28 July
Quarterly Activities/Appendix 5B Cash Flow Report
GTI Energy (GTR:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
23 July
Lo Herma Drilling Permit & Contract Confirmed
GTI Energy (GTR:AU) has announced Lo Herma Drilling Permit & Contract ConfirmedDownload the PDF here. Keep Reading...
14 July
Company Update - Name Change to 'American Uranium Limited'
GTI Energy (GTR:AU) has announced Company Update - Name Change to 'American Uranium Limited'Download the PDF here. Keep Reading...
10 July
Placement Shares Issued & Drilling Approval Expected August
GTI Energy (GTR:AU) has announced Placement Shares Issued & Drilling Approval Expected AugustDownload the PDF here. Keep Reading...
10h
Niger Moves to Sell Uranium From Orano's Seized SOMAÏR Mine
Niger’s military government announced that it intends to put uranium produced by the SOMAÏR mine on the international market.Head of the junta, General Abdourahamane Tiani, told state television Tele Sahel that “Niger's legitimate right to dispose of its natural riches to sell them to whoever... Keep Reading...
30 November
Expands REE and Uranium Footprint at Sybella-Barkly
Basin Energy (BSN:AU) has announced Expands REE and uranium footprint at Sybella-BarklyDownload the PDF here. Keep Reading...
28 November
Orano Condemns Illegal Uranium Transfer from Niger Mine
Orano said it “strongly condemns” the removal of uranium from the SOMAÏR mine in Northern Niger.The French firm called the transfer illegal and a direct breach of the International Center for Settlement of Investment Disputes’ (ICSID) September ruling, which prohibits the material's sale or... Keep Reading...
25 November
Canada, India Close to Resuming Uranium Trade After Diplomatic Freeze
Canada and India are preparing to unveil a multibillion-dollar uranium export agreement, marking the strongest sign yet that the two countries are rebuilding ties after a diplomatic freeze. Two people familiar with the negotiations revealed that the deal, valued at roughly US$2.8 billion, would... Keep Reading...
19 November
Hydrogeological Testing Underway at Lo Herma
Hydrogeological testing has commenced at AMU’s flagship Lo Herma ISR Project in Wyoming’s Powder River Basin to validate aquifer performance concurrent with Phase 1 drilling which aims expand the 8.57Mlb resource at Lo Herma.
American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to advise that hydrogeological testing at its Lo Herma ISR uranium project in Wyoming’s Powder River Basin has commenced. Testing is being undertaken by Petrotek Corporation, a leading injection well... Keep Reading...
Latest News

Sign up to get your FREE
American Uranium Investor Kit
and hear about exciting investment opportunities.
- Corporate info
- Insights
- Growth strategies
- Upcoming projects
GET YOUR FREE INVESTOR KIT
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00







