Orsu Metals Reports Strike Length of Drill-Confirmed Gold Mineralization at Zone 23 Tripled, Sergeevskoe Gold Project, Russia

Precious Metals

Orsu Metals Corporation (TSXV:OSU) (“Orsu” or the “Company”) reports the strike length of drill-confirmed gold mineralization at Zone 23 extends to 300 m at its Sergeevskoe Gold Project in Russia. Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented: “Hole SDH17-20, primarily drilled to constrain the downdip geometry of gold-mineralized stockwork at Zone 23, confirmed …

Orsu Metals Corporation (TSXV:OSU) (“Orsu” or the “Company”) reports the strike length of drill-confirmed gold mineralization at Zone 23 extends to 300 m at its Sergeevskoe Gold Project in Russia.

Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented:

“Hole SDH17-20, primarily drilled to constrain the downdip geometry of gold-mineralized stockwork at Zone 23, confirmed the presence of multiple mineralized intervals, extending for 300 m along the strike in drillholes and some 420 m in trenches.

Using historical drillholes, the steeply-dipping gold-mineralized stockwork at Zone 23 can be traced for 150-200 m downdip and some 170 m across. Mineralization remains open in all directions except to the north.”

Click here to read the full text release.

The Conversation (0)
×