Precious Metals

Orsu Metals Reports Strike Length of Drill-Confirmed Gold Mineralization at Zone 23 Tripled, Sergeevskoe Gold Project, Russia

Precious Metals

Orsu Metals Corporation (TSXV:OSU) (“Orsu” or the “Company”) reports the strike length of drill-confirmed gold mineralization at Zone 23 extends to 300 m at its Sergeevskoe Gold Project in Russia. Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented: “Hole SDH17-20, primarily drilled to constrain the downdip geometry of gold-mineralized stockwork at Zone 23, confirmed …

Orsu Metals Corporation (TSXV:OSU) (“Orsu” or the “Company”) reports the strike length of drill-confirmed gold mineralization at Zone 23 extends to 300 m at its Sergeevskoe Gold Project in Russia.

Dr. Alexander Yakubchuk, Director of Exploration of Orsu commented:

“Hole SDH17-20, primarily drilled to constrain the downdip geometry of gold-mineralized stockwork at Zone 23, confirmed the presence of multiple mineralized intervals, extending for 300 m along the strike in drillholes and some 420 m in trenches.

Using historical drillholes, the steeply-dipping gold-mineralized stockwork at Zone 23 can be traced for 150-200 m downdip and some 170 m across. Mineralization remains open in all directions except to the north.”

Click here to read the full text release.

MARKETS

Markets
TSX20669.18-45.30
TSXV622.31+0.30
DOW33970.06-8.02
S&P 5004053.64-16.92
NASD11516.41-105.30
ASX7493.80+25.50

COMMODITIES

Commodities
Gold1926.06-2.32
Silver23.71+0.08
Copper4.20-0.02
Palladium1713.170.00
Platinum1087.260.00
Oil78.73-0.95
Heating Oil3.14-0.04
Natural Gas2.73-0.12

DOWNLOAD FREE REPORTS

×