- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
ALX Completes Geophysical Program at Hook-Carter Property, Patterson Lake South Area
ALX Uranium Corp. (TSXV:AL, FWB:6LLN, OTCQX:ALXEF) announced that geophysical programs are complete at its Hook-Carter Propertylocated in the Patterson Lake South area in the southwestern Athabasca Basin, Saskatchewan.
ALX Uranium Corp. (TSXV:AL, FWB:6LLN, OTCQX:ALXEF) announced that geophysical programs are complete at its Hook-Carter Propertylocated in the Patterson Lake South area in the southwestern Athabasca Basin, Saskatchewan.
According to the news:
Work consisted of an advanced combined airborne and ground Sub-Audio Magnetic Transient Electromagnetic (HeliSAM TEM) geophysical survey conducted by Gap Discovery Geophysics over the Patterson and Carter Corridors of the Hook-Carter Property. The survey lines were flown 100 metres apart with a helicopter-borne transient EM receiver and covered two large areas approximately 3.8 km long by 1.9 km wide (W1/W2 area) and 2.3 km long by 1.9 km wide (A1 area). A total of 115 line-km of HeliSAM TEM was completed.
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â