- WORLD EDITIONAustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
New Age Exploration Reports On Preliminary Mining Study for Tungsten-tin Project
New Age Exploration (ASX:NAE) reported results of further technical studies on its Redmoor Tungsten-tin project in Cornwall, UK. The company has previously completed an updated inferred mineral resource estimate and exploration target for the project.
New Age Exploration (ASX:NAE) reported results of further technical studies on its Redmoor Tungsten-tin project in Cornwall, UK. The company has previously completed an updated inferred mineral resource estimate and exploration target for the project.
As quoted in the press release:
A preliminary mining study was recently completed by technical consultants, Mining One. The study included stope optimisation, high level underground mine design and high level capital and operating costs estimates for a bulk mining option and a high grade mining option. High level mine designs for both options included a simple decline, sumps, stockpiles, ventilation system, escape way and ore access along with a crown pillar from the surface to prevent surface subsidence. The following assumptions were used for both options:
- 1.5m minimum stope width / 25m max stope width
- 15m level spacing between development roadways
- 10% stope mining dilution, 90% stope mining recovery
The underground mining method assumed in the study is bench stoping with backfill (rock fill in conjunction with a form of cemented fill where required).
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â