Pure Energy Minerals Completes Nevada Drill Program

Battery Metals

Pure Energy Minerals (TSXV:PE,FWB:AHG) provided an operational and drilling update for its lithium brine project in Clayton Valley, Nevada. The property is contiguous to Rockwood Lithium’s Silver Peak mine.

Pure Energy Minerals (TSXV:PE,FWB:AHG) provided an operational and drilling update for its lithium brine project in Clayton Valley, Nevada. The property is contiguous to Rockwood Lithium’s Silver Peak mine.

As quoted in the press release:

Pure Energy, through its operator GeoXplor Corp., has successfully completed the CV-1 lithium brine proto-production well to a depth of 274 m (900 feet), twinning a historically drilled hole, SPD-9, that defined a lithium enriched zone from the 145 m (475 feet) to 317 m ( 1040 feet).

This proto-production well, CV-01, is located 20 m to the south of the historical SPD-9 drill hole. The CV-1 well was cased from the surface to the 274 m level. Perforated casing was installed from the top of the enriched zone to the bottom of the well.

Pure Energy CEO, Robert Mintak, said:

We are pleased with the successful exploration developments on the Clayton Valley project, the Company’s focus is on rapidly advancing exploration and process development, the successful drilling of the CV-01 proto- production well is the first step towards our goal of producing advanced grade battery materials utilizing environmentally friendly and sustainable practices.

Click here to read the Pure Energy Minerals (TSXV:PE,FWB:AHG) press release
Click here to see the Pure Energy Minerals (TSXV:PE,FWB:AHG) profile.

The Conversation (0)
×