Updated Mineral Resource confirms significant increases in cobalt grade and contained metal at Clean TeQ’s Syerston Project

Battery Metals

Mr Sam Riggall, Managing Director of Clean TeQ Holdings Limited (Clean TeQ or Company) (CLQ:ASX; CTEQF:OTCQX), today announced an update to the Syerston mineral resource. This update reflects a significant increase in cobalt ore grades and contained cobalt metal compared to the 2016 resource estimate (20 September 2016), which was the basis of the Pre-Feasibility …

Mr Sam Riggall, Managing Director of Clean TeQ Holdings Limited (Clean TeQ or Company) (CLQ:ASX; CTEQF:OTCQX), today announced an update to the Syerston mineral resource.
This update reflects a significant increase in cobalt ore grades and contained cobalt metal compared to the 2016 resource estimate (20 September 2016), which was the basis of the Pre-Feasibility Study (PFS). A substantial uplift in the scandium resource has also been achieved. The Platinum Mineral Resource includes significant high-grade zones of 12Mt @ 0.82 g/t Pt for 320,278 ounces, using a 0.5 g/t cut-off.
Mr Riggall commented:

“The purpose of updating the Mineral Resource Estimate was to demonstrate and confirm the significant upside that exists in the cobalt production potential at Syerston. Previous studies have focused almost exclusively on nickel, with little appreciation of the value represented by the inherent variability of cobalt grades.
By focusing on a cobalt cut-off grade, this update has led to the inclusion of higher-grade blocks that had previously been excluded from the geological model. It has also allowed for more selective rejection of low grade and waste material.”

Click here to read the full text release. 

The Conversation (0)
×