Osisko Metals Intersects 10.49 Percent Zinc+Lead Over 22.84 Metres at Pine Point

Base Metals Investing

The company reported that drill hole M67-18-PP-027 intersected 7.96 percent zinc and 2.53 percent lead over 22.84 metres and hole M67-18-PP-015 intersected 9.48 percent zinc and 2.67 percent lead over 17.00 metres.

Osisko Metals (TSXV:OM) has announced assay results from 29 drill holes completed at the M-67 deposit at the west end of the Central Zone in the Pine Point mining camp.

The company reported that drill hole M67-18-PP-027 intersected 7.96 percent zinc and 2.53 percent lead over 22.84 metres and hole M67-18-PP-015 intersected 9.48 percent zinc and 2.67 percent lead over 17.00 metres. Other high-grade intersections include holes M67-18-PP-004 that intersected 8.26 percent zinc and 2.82 percent lead over 8.75 metres, M67-18-PP-019 that intersected 11.49 percent zinc and 5.55 percent lead over 7.90 metres and M67-18-PP-028 that intersected 7.54 percent zinc and 1.46 percent lead over 13.09 metres.

President and CEO of Osisko, Jeff Hussey said:

“The 2018 drill campaign at Pine Point is nearly complete. We announced our 50,000 meters campaign immediately after closing the transaction back in February and we have been extremely pleased with the results released. We continue to intersect high grade, near surface zinc-lead mineralization across the entire property.”

Click here to read the full Osisko Metals (TSXV:OM) press release.

The Conversation (0)
Osisko Metals

Osisko Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

×