Brixton Metals Drills its Highest Silver Grades Ever in a New Shallow Brownfields Discovery at its Langis Project, Ontario

Brixton Metals Drills its Highest Silver Grades Ever in a New Shallow Brownfields Discovery at its Langis Project, Ontario

Hole 477 Yields 142,770 g/t Silver or 4,164 oz/t Silver over 0.3 m Within 1.1 m of 39,675 g/t Silver, All Within 3.0 m of 14,559 g/t Silver 

Hole 480 Returned 5.0 m of 704 g/t Silver Including 1.4 m of 2,479 g/t Silver

Brixton Metals Corporation (TSX-V: BBB, OTCQX: BBBXF) (the "Company" or "Brixton") is pleased to announce a new brownfields discovery in the Shaft 4 area (S4) at its wholly owned Langis Silver Project, located in the historic silver mining camp of Cobalt, Ontario, Canada. Brixton has not drilled in this area previously, and hole 477 is the first hole ever. Drilling at the Shaft 4 area has intersected native silver in veins at shallow vertical depths of approximately 50 to 55 m, within the upper section of the Huronian conglomerate. Shaft 4 area is the second brownfields discovery at Langis this year, following the discovery of the Shaft 6 South East area (S6-SE) announced on July 21, 2026. The Company is also reporting results from 28 holes (6,741 m) in the S4, S6-SE, Shaft 6 (S6), Shaft 6 West (S6-W), and Shaft 3 East (S3E) areas. So far in 2026, the Company has completed 49,946.55 m across 234 drill holes, working toward its near-term objective of establishing a maiden Mineral Resource Estimate ("MRE") at Langis.

Highlights

  • In Brixton's first hole ever in the Shaft 4 Area (S4), native silver veins were intersected at 68.5 m downhole depth in the upper section of the conglomerate; most known mineralization at Langis sits at its lower contact, near the Huronian unconformity, which suggests potential for silver mineralization in the lower section here.
  • Hole LM-26-477 returned 142,770 g/t silver or 4,164 oz/t silver or 142.8 kg/t silver over 0.3 m from 70.0 m depth
  • Drilled as a follow-up hole to 477, hole LM-26-480 returned 5.0 m of 704 g/t silver, including 1.4 m of 2,479 g/t silver, including 6,460 g/t silver over 0.40 m from 69.15 m depth
  • At the Shaft 3 East area, hole LM-26-462 returned 4.0 m of 424.5 g/t silver from 153.0 m depth

Chairman and CEO, Gary R. Thompson, stated, "We are thrilled with this new brownfields discovery in the Shaft 4 area, our second new discovery and a record-topping intercept at Langis this year after hole LM-26-377. Hole 377 yielded 14.00 m of 7,150 g/t silver, including 0.65 m of 89,125 g/t silver. Hole LM-26-477 intercepted 4,164 oz/t silver, or 142,770 g/t silver, the highest-grade silver intercept ever drilled on the project. Based on the publicly available data, hole 477 ranks as the highest-grade silver drill intercept reported globally."

Figure 1. Langis Silver Project location map of drilling area and mineral claims.  

Figure 1_16Nov2026

Figure 2. HQ core photographs of the cut surface from hole LM-26-477 at 70.08–70.33 m depth showing abundant native silver and lesser cobaltite in a carbonate vein, Shaft 4 (S4) area.

Figure 2_16Nov2026 477

Figure 3. HQ core photograph of hole LM-26-480 at 69.20-69.45 m depth showing cobaltite and lesser native silver in a carbonate vein, Shaft 4 (S4) area. Native silver shows a bright white.

Figure 3_16Nov2026 480

Discussion

Shaft 4 (S4)

Shaft 4 (S4) is a new brownfields discovery area at Langis where no historic mine workings exist (Figure 4). Drilling at S4 has intersected native silver in veins at shallow vertical depths of approximately 50 to 55 m, within the upper section of the Huronian conglomerate (Figures 2 and 3). Most known mineralization on the project sits at the lower contact of the conglomerate, on the Huronian Unconformity. The S4 veins matter for two reasons: they give shallower silver intercepts than are typical at Langis, and they raise the possibility that the lower contact beneath S4 is also mineralized. The Company is actively drilling the lower contact beneath the shallow S4 veins.

The very high-grade silver intersected in hole LM-26-477 is an encouraging result for this area. Silver observed at S4 occurs mainly as native silver, locally associated with arsenide and nickel minerals. This mineralization style has also been observed elsewhere on the property, including at Shaft 6. The Company targeted this area based on a gravity (HGRAV) anomaly with a geometry and geophysical response similar to that at Shaft 6. A similar geophysical response does not necessarily indicate similar mineralization. The Company is drilling this target on a tight grid, and several additional holes have intersected visible silver mineralization. Visual observations are not a substitute for laboratory assays, which are pending and will be reported once received and validated.

Figure 4. Plan map of Langis showing the drill hole collars and traces reported in this news release, other 2026 drill collars, and historic and Brixton silver assays projected to surface. Dashed lines show long sections A–A' and B–B' (Figure 5).

Figure 4_16Nov2026_plan_map_dark

Symbols show individual drill core samples ≥30 g/t Ag projected to surface; larger outlined symbols are samples from holes reported in this news release. They are a visual aid only. They are not a geological model, a mineral resource or a mineral reserve, and they do not imply continuity of mineralization between drill holes. Reported intercepts are core lengths; true widths are not yet known.

Table 1. Selected assay intervals from drill holes in the Shaft 4 (S4) area.

Hole ID From (m) To (m) Length (m) Ag (g/t)
LM-26-477 68.50 71.50 3.00 14,558.90
including 69.50 70.60 1.10 39,675.00
including 70.00 70.30 0.30 142,770.00
LM-26-477 92.50 93.00 0.50 103.00
LM-26-480 67.00 72.00 5.00 704.49
including 68.65 70.05 1.40 2,478.93
including 69.15 69.55 0.40 6,460.00


Note for all assay tables: All assay values are weighted averages. Reported intervals are drilling lengths, and the true widths of the mineralized intervals have not yet been determined. Reported intervals are length-weighted composites calculated at a 5 g/t Ag cut-off over contiguous samples, with limited internal dilution. A hole is reported as a significant intercept only where it contains a sub-interval exceeding 50 g/t Ag; otherwise, it is reported as no significant intercepts. Higher-grade "including" intervals reflect geological interpretation.

Shaft 6 South East (S6-SE)

Drilling in the S6-SE area (Table 2) continued to test this zone. Hole LM-26-457 returned 7.00 m of 135.47 g/t silver from 208.00 m depth, including 4.50 m of 205.11 g/t silver, hosted in Keewatin mafic volcanic rocks below the conglomerate. Holes LM-26-411 and LM-26-413 intersected narrower mineralization in the conglomerate at depths of approximately 226 m to 239 m, and hole LM-26-453 returned 0.70 m of 242.00 g/t silver from 66.15 m depth.

Table 2. Selected assay intervals from drill holes in the Shaft 6 South East (S6-SE) zone.

Hole ID From (m) To (m) Length (m) Ag (g/t)
LM-26-411 226.00 226.65 0.65 182.00
LM-26-411 233.75 237.30 3.55 38.78
including 233.75 234.25 0.50 85.20
including 236.80 237.30 0.50 141.00
LM-26-413 230.45 231.60 1.15 60.00
LM-26-453 66.15 66.85 0.70 242.00
LM-26-457 208.00 215.00 7.00 135.47
including 209.00 213.50 4.50 205.11
LM-26-457 216.50 217.00 0.50 80.30
LM-26-463 220.00 222.00 2.00 170.63
including 220.00 221.00 1.00 330.00
LM-26-463 227.00 229.00 2.00 76.30

No significant intercepts were returned from holes LM-26-397, LM-26-409, LM-26-415, LM-26-447, LM-26-451, LM-26-459, and LM-26-461.


Shaft 6 (S6)

In the Shaft 6 (S6) area (Table 3), hole LM-26-434 returned 6.75 m of 56.97 g/t silver from 132.25 m depth, including 1.20 m of 234.08 g/t silver, and hole LM-26-452 returned 1.00 m of 57.40 g/t silver from 124.00 m depth.

Table 3. Selected assay intervals from drill holes in the Shaft 6 (S6) zone.

Hole ID From (m) To (m) Length (m) Ag (g/t)
LM-26-434 132.25 139.00 6.75 56.97
including 136.65 137.85 1.20 234.08
LM-26-452 124.00 125.00 1.00 57.40

No significant intercepts were returned from holes LM-26-448, LM-26-450, and LM-26-454.


Shaft 6 West (S6-W)

Drilling in the Shaft 6 West (S6-W) area (Table 4) followed up on the initial results reported in the news release dated September 2, 2026, which confirmed mineralization around the historic mine workings. Hole LM-26-410 returned 4.00 m of 159.20 g/t silver from 127.00 m depth, including 2.00 m of 247.00 g/t silver.

Brixton is looking to potentially expand this mineralization at S6-W to demonstrate continuity, as the Company has been doing in the Shaft 6 South East (S6-SE) area.

Table 4. Selected assay intervals from drill holes in the Shaft 6 West (S6-W) zone.

Hole ID From (m) To (m) Length (m) Ag (g/t)
LM-26-410 127.00 131.00 4.00 159.20
including 127.00 129.00 2.00 247.00

No significant intercepts were returned from hole LM-26-414 and LM-26-418.


Shaft 3 East (S3E)

In the Shaft 3 East (S3E) area (Table 5), hole LM-26-456 returned 4.10 m of 61.23 g/t silver from 164.50 m depth, including 0.55 m of 182.00 g/t silver, and 3.30 m of 49.52 g/t silver from 172.00 m, including 0.60 m of 193.00 g/t silver. Hole LM-26-462 returned 4.00 m of 424.50 g/t silver from 153.00 m depth.

Table 5. Selected assay intervals from drill holes in the Shaft 3 East (S3E) zone.

Hole ID From (m) To (m) Length (m) Ag (g/t)
LM-26-456 164.50 168.60 4.10 61.23
including 165.00 165.55 0.55 182.00
LM-26-456 172.00 175.30 3.30 49.52
including 174.70 175.30 0.60 193.00
LM-26-462 153.00 157.00 4.00 424.50

No significant intercepts were returned from holes LM-26-455, LM-26-458, LM-26-464 and LM-26-466.


Figure 5. Long sections A–A' (west–east along 5,270,760 m N, looking north, holes within ±170 m) and B–B' (Shaft 4 to Shaft 6, looking 027°, holes within ±50 m); section traces shown in Figure 4. Drill holes reported in this news release are shown in black with reported intercepts as thick bars, and previously reported holes in grey. Silver assays ≥30 g/t Ag from historic and Brixton drilling are projected to the section planes.

Figure 5_16Nov2026_long_sections

Shaded zones are envelopes around samples ≥30 g/t Ag. Background lithology (Huronian conglomerate and sediments, Nipissing diabase, Keewatin mafic volcanics) is interpolated from drill logs. No vertical exaggeration. Projection: samples up to 170 m (A–A') or 50 m (B–B') from the section line appear together, so intercepts that look close on the section may be separated in three dimensions. Shaded zones are a visual aid only, with the same limitations as noted under Figure 4. Reported intercepts are core lengths; true widths are not yet known.

Figure 6. Plan map of the Shaft 4 and Shaft 6 areas showing the ten best drill intervals reported by Brixton in 2026, including results from this news release.

Figure 6_16Nov2026_top10_2026_intercepts

Intervals are ranked by grade × length (g/t Ag × m), one interval per hole, as previously reported in Brixton's 2026 news releases or in Tables 1 to 5 of this release. Only 2026 holes with reported assays are drawn. Symbols show individual drill core samples ≥30 g/t Ag projected to surface: outlined symbols are from 2026 drilling, faint symbols are from earlier Brixton and historic (pre-Brixton) drilling, shown for context only. They are a visual aid only and do not imply continuity of mineralization between drill holes. Reported intercepts are core lengths; true widths are not yet known.

Table 6. Drill hole collar information for reported holes.

Hole ID Pad ID Easting
(m)
Northing
(m)
Elevation
(m)
Azimuth Dip Depth
(m)
Zone
LM-26-397 LM-2026-070 607530 5270763 217.7 80 -50 300.00 Shaft 6-SE
LM-26-409 LM-2026-071 607540 5270745 217.5 80 -60 300.00 Shaft 6-SE
LM-26-410 LM-2026-039 607213 5270823 213.0 300 -45 219.00 Shaft 6-W
LM-26-411 LM-2026-072 607550 5270725 217.3 80 -55 300.00 Shaft 6-SE
LM-26-413 LM-2026-072 607550 5270725 217.3 80 -50 300.00 Shaft 6-SE
LM-26-414 LM-2026-039 607216 5270827 213.0 90 -55 195.00 Shaft 6-W
LM-26-415 LM-2026-072 607550 5270725 217.3 80 -45 297.00 Shaft 6-SE
LM-26-418 LM-2026-092 607230 5270823 213.1 305 -60 180.00 Shaft 6-W
LM-26-434 LM-2026-102 607434 5270886 219.4 230 -62 177.00 Shaft 6
LM-26-447 LM-2026-094 607559 5270725 217.4 90 -56 300.00 Shaft 6-SE
LM-26-448 LM-2026-104 607436 5270910 219.1 230 -70 180.00 Shaft6
LM-26-450 LM-2026-105 607462 5270854 218.7 230 -70 180.00 Shaft6
LM-26-451 LM-2026-094 607559 5270725 217.4 96 -50 300.00 Shaft 6-SE
LM-26-452 LM-2026-105 607463 5270853 218.7 220 -70 192.00 Shaft6
LM-26-453 LM-2026-094 607559 5270725 217.4 100 -58 213.00 Shaft 6-SE
LM-26-454 LM-2026-105 607462 5270854 218.7 240 -70 177.00 Shaft6
LM-26-455 LM-2026-100 606935 5270656 212.3 90 -50 204.00 Shaft 3
LM-26-456 LM-2026-100 606935 5270656 212.3 95 -50 205.00 Shaft 3
LM-26-457 LM-2026-094 607559 5270725 217.4 100 -62 282.00 Shaft 6-SE
LM-26-458 LM-2026-100 606935 5270656 212.3 95 -45 261.00 Shaft 3
LM-26-459 LM-2026-094 607559 5270725 217.4 90 -56 300.00 Shaft 6-SE
LM-26-461 LM-2026-094 607559 5270725 217.4 76 -57 303.00 Shaft 6-SE
LM-26-462 LM-2026-100 606935 5270656 212.3 80 -50 231.00 Shaft 3
LM-26-463 LM-2026-094 607559 5270725 217.4 68 -56 300.00 Shaft 6-SE
LM-26-464 LM-2026-010 606940 5270620 212.9 90 -45 255.00 Shaft 3
LM-26-466 LM-2026-010 606940 5270620 212.9 90 -50 252.00 Shaft 3
LM-26-477 LM-2026-044 606900 5271100 189.5 90 -50 201.00 Shaft 4
LM-26-480 LM-2026-044 606900 5271100 190.1 90 -45 201.00 Shaft 4


Quality Assurance & Quality Control

Quality assurance and quality control protocols for drill core sampling were developed by Brixton. Core samples were mostly taken at 2.0 m intervals. High-grade intervals were taken at 0.50 m to 1.00 m intervals. Blanks, duplicates (lab pulp), and certified reference materials were inserted at a combined rate of up to 15%. Core samples were cut in half, bagged, zip-tied, and sent directly to the ALS Minerals preparation facility in Sudbury, Ontario. ALS Minerals Laboratories is registered to ISO 9001:2015 and accredited to ISO/IEC 17025:2017 for laboratory procedures. Samples were analyzed at ALS Laboratory Facilities in North Vancouver, British Columbia, for gold by fire assay with an atomic absorption finish. Ag, Pb, Cu, and Zn, as well as 48 additional elements, were analyzed using a four-acid digestion with an ICP-MS finish. Overlimit silver samples were analyzed using fire assay and gravimetric finish, and/or fire assay and gravimetric finish on concentrates. The certified reference materials were acquired from CDN Resource Laboratories Ltd. of Langley, British Columbia, and the standards inserted varied with the type and abundance of mineralization observed in the primary sample. Blank material used consisted of non-mineralized siliceous landscaping rock. A copy of the QAQC protocols is available on the Company's website.

About the Langis Project

An Exploration Target of 1.0 to 2.0 million tonnes grading 400 to 800 g/t silver has been conceptualized for the project. Note: The potential quantity and grade of the Exploration Target are conceptual. Insufficient exploration has been completed to define a mineral resource, and there is no certainty that further exploration will result in the target being delineated as a mineral resource.

The wholly owned Langis Silver Project, located approximately 500 km north of Toronto, Ontario, Canada, includes a former producing mine and benefits from excellent infrastructure, including all-season road access, power, rail connections, and a refiner. Silver mineralization occurs as native silver and in steeply to moderately dipping veins, veinlets, disseminations, rosettes, and fracture infill, often associated with minerals such as calcite, hematite, pyrite, cobaltite, chalcopyrite, niccolite, and gold. Mineralization is hosted across three principal rock types: Archean Keewatin volcanic and metasedimentary rocks, Proterozoic Coleman Member sedimentary rocks of the Huronian Supergroup, and Proterozoic Nipissing diabase. The geological deposit model for the area is a continental-rift extensional depositional environment. The Langis Mine produced 10.4 million ounces of silver intermittently between 1908 and 1989 at a head grade of 20 to 25 opt, with reported recoveries of 88% to 98%. Previous operators developed over 10 km of underground workings; however, shafts and openings have been capped and sealed. Historically, reported silver mines in the Cobalt Camp have collectively produced over 445 million ounces of silver. We also understand, through personal communication with mine workers in the camp, that ultra-high-grade native silver collector pieces did not make it through the mills, suggesting that the camp's actual silver production is significantly higher than the reported numbers. The historic production figures referenced above are sourced from third-party records and personal communications, have not been verified by Brixton or by the Qualified Person, and should not be relied upon.

Qualified Person (QP)

Mr. Gary Thompson, P.Geo., is the Chairman and CEO and a senior geologist for the Company who is a Qualified Person as defined by National Instrument 43-101. Mr. Thompson has verified the referenced data and analytical results disclosed in this press release and has approved the technical information presented herein.

About Brixton Metals Corporation

Brixton Metals is a Canadian exploration company focused on advancing its mining projects. Brixton wholly owns five exploration projects: the Thorn copper-gold-silver-molybdenum Project in NW British Columbia; the Hog Heaven copper-silver-gold Project in NW Montana, USA, which is optioned to Ivanhoe Electric Inc.; the Langis and Hudson Bay silver Projects in Ontario; and the Atlin Goldfields Project in northwest BC. Brixton holds an option to acquire a 100% interest in the silver-focused Silvergruvan Project in Sweden. Brixton Metals Corporation shares trade on the TSX-V under the ticker symbol BBB, and on the OTCQX under the ticker symbol BBBXF. For more information about Brixton, please visit our website at www.brixtonmetals.com.

On Behalf of the Board of Directors

Mr. Gary R. Thompson, Chairman and CEO
info@brixtonmetals.com

For Investor Relations inquiries please contact: Mr. Michael Rapsch, Vice President Investor Relations. email: michael.rapsch@brixtonmetals.com or call Tel: 604-630-9707
Follow us on:
LinkedIn | Twitter/X | Facebook | Instagram

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact, included herein are forward-looking statements, including, without limitation, statements regarding the potential for silver mineralization at the lower contact beneath Shaft 4, planned drilling, the timing of pending assays, the Exploration Target, and the planned maiden Mineral Resource Estimate at Langis. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements. 

Figures accompanying this announcement are available at

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-1_16Nov2026-scaled.png

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-2_16Nov2026-477-scaled.png

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-3_16Nov2026-480-scaled.png

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-4_16Nov2026_map-scaled.png

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-5_16Nov2026-scaled.png

https://brixtonmetals.com/wp-content/uploads/2026/11/Figure-6_16Nov2026-scaled.png


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

BBB:CC
Brixton Metals

Brixton Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Brixton Metals

Brixton Metals

Diversified exposure to copper, gold and silver with projects in North America

Diversified exposure to copper, gold and silver with projects in North America Keep Reading...

Enjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube.

Overview

Brixton Metals (TSXV:BBB,OTCQB:BBBXF,FRA:8BX1) is a Canadian mineral exploration company focused on silver, copper, gold and critical minerals across North America.

The company is currently transitioning from explorer to developer as it advances its Langis Silver Project in Ontario towards maiden mineral and tailings resource estimates. Thorn, its district-scale project in British Columbia’s Golden Triangle, remains a shared focus with three individual resource estimates expected in Q1 2027

In addition, Brixton Metals is strategically advancing non-core projects through partnerships and option agreements with companies such as Ivanhoe Electric (NYSE American:IE;TSX:IE). These partnerships provide partner-funded exploration, allowing Brixton Metals to retain upside exposure while conserving capital and strengthening its balance sheet. This approach enables the company to focus on high-impact targets while mitigating exploration risk.

Brixton Metals' mineral exploration projects overview map

Brixton Metals’ management team, led by Chairman & CEO Gary R. Thompson, brings decades of experience in resource exploration, project development, and capital markets. The team’s expertise allows the company to efficiently advance multiple projects while maintaining exposure to a diversified portfolio of metals.

In October 2026, Brixton announced the closing of its option agreement with McKnight Resources AB to acquire a 100 percent interest in the silver-focused Silvergruvan Project in Hällefors Municipality, south-central Sweden. The 1,460-hectare property sits on the western margin of the Bergslagen province. Brixton can exercise the option by issuing C$1.5 million in shares and funding C$3.3 million in exploration, with a 2 percent NSR royalty granted to McKnight upon exercise.

With global demand for copper and critical minerals set to surge over the next 25 years—driven by renewable energy, electrification, and industrial decarbonization—Brixton Metals is well positioned to capitalize on the green revolution. By combining discovery potential at its flagship project, strategic monetization of non-core assets, and disciplined exploration, Brixton Metals is advancing toward its next growth milestones while delivering significant value for investors.

Company Highlights

  • High-Grade Silver Project: Langis Silver Project in the historic Cobalt Mining District of Ontario, which combines the past-producing, high-grade Langis and Hudson Bay mines.
  • Pipeline Projects: Includes Thorn (BC, Canada), Hog Heaven (Montana, USA) and Atlin Goldfields (BC, Canada), providing diversified exposure to copper, gold and silver.
  • Partnerships: Strategic option agreements with tier-one partners BHP and Ivanhoe Electric provide technical validation and fund exploration on non-core projects.
  • Shareholder Base: Strategic investors include BHP (approx. 10.4percent) and Ivanhoe Electric.
  • Management Expertise: Led by co-founder Gary Thompson, the management team has an average tenure of over 25 years, showing significant stability.
  • Fully funded 2026 program: The company closed a C$9.1 million financing in August to ramp up its ongoing drill campaign at the Langis Silver Project to capitalize on record-high silver prices. Brixton also announced a non-brokered flow-through private placement of up to C$6 million in October, with proceeds directed to exploration and drilling at the Thorn and Langis projects.
  • Near-term catalyst: Brixton is anticipating a maiden mineral resource estimate on the historic tailings at Langis in Q4 2026, three mineral resource estimate on the Thorn project in Q1 2027, and a maiden mineral resource estimate at Langis in Q2 2027.

Key Projects

Langis Silver Project (Ontario, Canada)

Brixton Metals' Langis Silver Project location map

The Langis Silver Project combines the past-producing, high-grade Langis and Hudson Bay mines, which are primary silver-cobalt-nickel brownfield opportunities located in the historic Cobalt Mining District of Ontario, which has a regional production history of over 600 million ounces of silver.

Brixton Metals has actively explored these sites, with drilling at Langis yielding over 220 intervals exceeding 100 g/t silver, including high-grade intercepts such as 15,436 g/t silver and 1.98 percent cobalt between 2016 - 2022. Recent drill results included 20 m of 5,015 g/t silver, including 0.65 m of 89,125 g/t. The projects benefit from year-round road access and proximity to existing infrastructure, including a railway and the Electra Battery Metals cobalt refinery 10 km away.

Project Highlights:

  • Historic Mineralization: High-grade silver and cobalt intercepts in historical drilling.
  • Strategic Opportunity: Near term cash-flow by reprocessing historic tailings
  • Exploration Upside: Property hosts brownfield exploration targets with known mineralization.
  • Critical Minerals Exposure: Adds battery metals to Brixton Metals’ diversified portfolio.

Thorn Project (BC, Canada)

Brixton Metals Thorn Project geological property map

The Thorn Project covers approximately 2,945 sq km on the same geological trend as British Columbia’s Golden Triangle, a region renowned for world-class porphyry and epithermal systems. The project hosts porphyry-style alteration with copper, gold, silver, and molybdenum, with significant exploration potential. Its proximity to regional infrastructure and road access reduces logistical challenges and supports accelerated exploration programs.

Project Highlights:

  • Camp Creek Corridor: An 80-kilometer-long northeast-southwest trending corridor that hosts multiple underexplored porphyry-style prospects.
  • Trapper Target: High-grade gold intercepts demonstrate multiple vein systems with near-term resource potential.
  • Catalyst Target: First-ever drilling confirms copper-gold porphyry mineralization, advancing the exploration pipeline.
  • Tempest Target: Initial drilling reveals a multiphase porphyry system with copper-gold-silver-molybdenum mineralization and strong hydrothermal alteration.

Hog Heaven Project (Montana, USA)

Located in western Montana, Hog Heaven is a historical silver-gold-copper property with significant porphyry potential. Hog Heaven is currently under an earn-in agreement where Ivanhoe Electric can earn up to 75 percent interest through staged cash payments and exploration expenditures. This arrangement provides funding for exploration while retaining Brixton Metals’ upside exposure.

The property contains multiple mineralized zones, including historical drill targets with notable copper, gold, and silver intercepts. Ivanhoe’s initial drilling has confirmed mineralization and highlighted the project’s potential for large-scale porphyry systems. Brixton retains exposure to exploration success while de-risking development costs.

Project Highlights:

  • Option Agreement: Ivanhoe Electric can earn up to 75 percent through US$4.5 million in cash and US$40 million in work over 11 years. US$3.5M cash payments have been made, and approximately US$21 million has been spent on the project to date.
  • Mineralization: Historical drilling confirms copper, gold, and silver mineralization across multiple targets.
  • Exploration Focus: Targets include porphyry-style and epithermal systems.

Atlin Goldfields Project (British Columbia, Canada)

The Atlin Goldfields Project is located in northwestern British Columbia, an area historically known for placer gold production, offering strong potential for hard-rock gold discoveries.

Exploration at Atlin focused on identifying orogenic and intrusion-related gold targets, with early work confirming mineralization continuity in key areas. The property benefits from proximity to historic mining infrastructure and geology conducive to high-grade gold zones, providing an attractive exploration and growth opportunity.

Project Highlights:

  • Historic Production: Located near areas of historic placer gold production, indicating strong geological potential.
  • Exploration Targets: Focused on orogenic and intrusion-related gold deposits with high-grade potential.

Management Team

Gary R. Thompson - Chairman and CEO, President, Director

Gary Thompson is a co-founder of Brixton Metals with over 25 years of experience in the resources sector, spanning precious and base metals, oil & gas, and geothermal energy. He has led public companies since 2006 and has held senior roles in both junior and major mining companies, including Newmont Mining, NovaGold Resources, and Encana Corporation. Thompson took Cayley Geothermal public in 2006 through the acquisition of Sierra Geothermal Power and served as CEO until its acquisition by Ram Power in 2010.

Cale Moodie – CFO and Director

Cale Moodie, a co-founder of Brixton Metals, has over 15 years of public markets experience. A CPA and serial entrepreneur, he has served as founder, CEO, CFO, director, and audit committee chair for multiple publicly traded companies on the TSXV and CSE. Moodie holds a Bachelor of Science from UBC and earned his CPA designation while working at KPMG in Vancouver. He has been involved in over $150 million in financings for resource and technology companies.

Michael Rapsch – Vice President, Investor Relations

Michael Rapsch has 20 years of capital markets experience in the resource sector, including senior roles in corporate communications and corporate development. He led investor relations and marketing programs for SilverCrest Mines until its acquisition by First Majestic in 2015, and from 2015 to 2018 managed investor relations for SilverCrest Metals, owner of the Las Chispas silver-gold project in Mexico. In 2019, he founded Cologne Communications, providing investor relations consulting to publicly traded resource companies, and has been instrumental in capital raises and market communications throughout his career.

LaFleur Minerals Continues to Expand Swanson Gold Deposit Mineralization Near Surface and Along Strike with 2.52 g/t Au over 14.35 Metres

LaFleur Minerals Continues to Expand Swanson Gold Deposit Mineralization Near Surface and Along Strike with 2.52 g/t Au over 14.35 Metres

LaFleur Minerals Inc. (CSE: LFLR) (OTCQB: LFLRF) (FSE: 3WK0) ("LaFleur Minerals" or the "Company") is pleased to report assay results from the Fall 2026 Swanson Gold Deposit drill program, which is within the much larger Swanson Gold Project ("Swanson" or the "Project") drill program. This... Keep Reading...
Sranan Gold Discovers New Gold Zone at Lawatino 300 m Northeast of the 101 Zone

Sranan Gold Discovers New Gold Zone at Lawatino 300 m Northeast of the 101 Zone

Sranan Gold Corp. (CSE: SRAN) (OTCQB: SRANF) (FSE: P84) (Tradegate: P84) ("Sranan" or the "Company") announces the discovery of a new showing of gold mineralization, the RB Zone, located approximately 300 metres northeast of the 101 Zone within its 18,468-hectare Lawatino Gold Project in... Keep Reading...
Brixton Metals Announces Closing of Final Tranche of Non-Brokered Private Placement

Brixton Metals Announces Closing of Final Tranche of Non-Brokered Private Placement

Not for distribution to United States Newswire Services or for dissemination in the United States Brixton Metals Corporation (TSX- V: BBB, OTCQX: BBBXF) (the "Company" or "Brixton") is pleased to announce that it has closed a third and final tranche of a non-brokered private placement offering... Keep Reading...
Canadian Investment Regulatory Organization Trade Resumption - TDG

Canadian Investment Regulatory Organization Trade Resumption - TDG

Trading resumes in: Company: TDG Gold Corp.TSX-Venture Symbol: TDGAll Issues: YesResumption (ET): 2:15 PMCIRO can make a decision to impose a temporary suspension (halt) of trading in a security of a publicly-listed company. Trading halts are implemented to ensure a fair and orderly market. CIRO... Keep Reading...
One Bullion Advances Maitengwe Gold Project Toward Field Verification and Planned Drill Testing

One Bullion Advances Maitengwe Gold Project Toward Field Verification and Planned Drill Testing

One Bullion Ltd. ("One Bullion" or the "Company") (TSXV: OBUL), a gold exploration company holding complete ownership of three prospective exploration projects in Botswana, today announced an exploration update on its wholly owned Maitengwe Gold Project in northeastern Botswana and outlined the... Keep Reading...
Cerrado Gold Acquires the Past-Producing Manantial Espejo Mine in Santa Cruz, Argentina, from Pan American Silver

Cerrado Gold Acquires the Past-Producing Manantial Espejo Mine in Santa Cruz, Argentina, from Pan American Silver

Mine produced 110,000 to 137,500 Gold Equivalent Ounces ("GEOs") between 2009 and 2016 annually and produced 52,000-88,000 GEOs between 2017 and 2022 annually. Mining and processing activities concluded at the end of 2022, after the operation produced 68,000 GEOs in 2022, with mineralized... Keep Reading...
Brixton Metals

Brixton Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News