- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Atico Produces 5.10 Million Pounds of Cu and 2,831 Ounces of Au in Third Quarter 2017
Atico Mining Corporation (the “Company” or “Atico”) (TSX VENTURE:ATY) (OTC PINK:ATCMF) announces its operating results for the three months ended September 30, 2017 from its El Roble mine. Production for the quarter totaled 5.10 million pounds of copper and 2,831 ounces of gold in concentrates, an increase of 13% for copper and no significant change …
“We are very pleased to report a strong operating quarter maintaining steady state production levels and remaining in line to reach operational objectives for 2017.” said Fernando E. Ganoza, CEO. “For the remainder of the year, the Company will continue focusing on the regional and mine vicinity exploration programs with rigs currently drilling on surface and underground.”
Third Quarter Operational Highlights
- Production of 5.10 million pounds of copper contained in concentrates; an increase of 13% over Q3 2016.
- Production of 2,570 ounces of gold contained in concentrates; no significant change over Q3 2016.
- Average processed tonnes per day of 794, an increase of 4% over Q3 2016.
- Copper head grade of 3.68%, an increase of 6% over Q3 2016.
- Gold head grade of 2.16 grams per tonne; an increase of 3% over Q3 2016.
- Copper and gold recovery of 94.3% and 61.8%; no significant change for copper and a decrease of 10% for gold over Q3 2016.
Third Quarter Operational Review
Processed ore was in line with Company budget for the third quarter. The increase in higher copper output for the quarter relative to Q3-2016 is explained by a higher copper head grade. In the case for gold production, the output was in line with Company budget with no significant change over Q3-2016.
Copper recoveries maintained their high comparable to the same period last year, while gold recoveries during the quarter were in line with Company projections. Gold recovery decreased as expected driven by a 10% increase in the copper content in the concentrate to 21.90% (19.96% in Q3-2016). This increase in the copper content in the concentrate provides a net economic benefit offsetting the resulting decrease in gold recovery. The Company will continue to explore increasing the copper content in the concentrate in the following quarters while increasing the gold recovery.
The operation remains on track to deliver on set guidance throughout the remainder of the year.
Third Quarter Operational Details | |||
Q3 2017 Total | Q3 2016 Total | % Change | |
Production (Contained in Concentrates) | |||
Copper (000s pounds) | 5,099 | 4,515 | 13% |
Gold (ounces) | 2,831 | 2,813 | nil |
Mine | |||
Tonnes of ore mined | 74,919 | 63,112 | 19% |
Mill | |||
Tonnes processed | 66,443 | 48,015 | 38% |
Tonnes processed per day | 794 | 766 | 4% |
Copper grade (%) | 3.68 | 3.48 | 6% |
Gold grade (g/t) | 2.16 | 2.08 | 4% |
Recoveries | |||
Copper (%) | 94.3 | 94.6 | nil |
Gold (%) | 61.1 | 67.9 | -10% |
Concentrates | |||
Copper and Gold Concentrates (dmt) | 10,551 | 10,221 | 3% |
Payable copper produced (000s lbs) | 4,844 | 4,312 | 12% |
Note: Metal production figures are subject to adjustments based on final settlement. |
El Roble Mine
The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 800 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.
El Roble has a measured and indicated resource of 1.87 million tonnes grading 3.46% copper and 2.27 g/t gold, at a cut-off grade of 0.93% copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.
Qualified Person
Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.
About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza, CEO
Atico Mining Corporation
Trading symbols: (TSX VENTURE:ATY) (OTC PINK:ATCMF)
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a “U.S. person” (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.
Cautionary Note Regarding Forward Looking Statements
This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the heading “Risk Factors” in the prospectus of the Company dated March 2, 2012 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com
The Company has not based its production decisions and ongoing mine production on mineral reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Non-GAAP Financial Measures
The items marked with a “(1)” are alternative performance measures and readers should refer to Non-GAAP Financial Measures in the Company’s Management’s Discussion and Analysis for the nine months ended September 30, 2016 as filed on SEDAR and as available on the Company’s website for further details.
Investor Relations
Igor Dutina
+1.604.633.9022
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.