Barkerville Gold Reports Final Results from 2017 Drilling

Gold Investing

Barkerville Gold Mines Ltd. (TSXV:BGM) announced final drill results from the 160,000-meter 2017 Island Mountain and Valley zone exploration programs at its flagship Cariboo gold project.

Barkerville Gold Mines Ltd. (TSXV:BGM) announced final drill results from the 160,000-meter 2017 Island Mountain and Valley zone exploration programs at its flagship Cariboo gold project.

As quoted in the press release:

Detailed drilling results, a drill hole location plan map and vertical sections are presented at the end of this release. The exact geometry and hence true width of the mineralized zones cannot be assuredly concluded at this time therefore core lengths are reported. The company currently has 7 drill rigs exploring and delineating mineralized vein corridors on Island Mountain.

Drill highlights include:

  • IM-17-240: 28.99 g/t Au over 2.70 meters
  • IM-17-241: 8.25 g/t Au over 7.50 meters
  • IM-17-242: 8.30 g/t Au over 10.75 meters
  • IM-17-247: 13.09 g/t Au over 4.25 meters
  • IM-17-249: 48.17 g/t Au over 9.95 meters
  • IM-17-251: 33.22 g/t Au over 2.50 meters
  • IM-17-251: 9.15 g/t Au over 7.05 meters
  • CM-17-098: 11.09 g/t Au over 4.90 meters
  • CM-17-101: 13.45 g/t Au over 7.80 meters
  • CM-17-106: 12.22 g/t Au over 11.40 meters

Click here to read the full Barkerville Gold Mines Ltd. (TSXV:BGM) press release.

The Conversation (0)
×