Firestone Ventures Inc. (TSX VENTURE:FV)(FRANKFURT:F5V) announced results from 19 drill holes at the Company’s Quetzal zinc-lead-silver project and results from four drill holes at the Company’s Torlon Hill zinc-lead-silver deposit.
Firestone Ventures Inc. (TSX VENTURE:FV)(FRANKFURT:F5V) announced results from 19 drill holes at the Company’s Quetzal zinc-lead-silver project and results from four drill holes at the Company’s Torlon Hill zinc-lead-silver deposit.
The press release is quoted as saying:
Sixteen of the holes were drilled at angles between -50 to -70 degrees. Three of the holes were vertical. Core recovery was generally in the range of 70 to 100% with lower recoveries tending to occur in highly oxidized ferruginous rocks. Hole QS10-4 was terminated before reaching its target depth. The best two holes, QS10-16 and QS10-17 were drilled to the east at -60 degrees and -70 degrees respectively, from the same platform to intersect high-grade mineralization exposed in underground workings
Click here to access the entire press release
Click here to access Firestone Ventures Inc. Corporate Site
The Conversation (0)
Latest News
Outlook Reports world
Featured Stocks
Browse Companies
MARKETS
COMMODITIES
CURRENCIES