• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Silver Market
Silver News
Silver Stocks
Silver Price
  • Silver Market
  • Silver News
  • Silver Stocks
  • Silver Price

Cyprium Mining: Shaft 3 Rehabilitation at Potosi Mine Finalized

Teresa Matich
May. 30, 2016 09:18AM PST
Silver Investing

Cyprium Mining (TSXV:CUG) has completed rehabilitation of shaft three of its Potosi silver mine in Santa Eulalia, Mexico. As quoted in the press release: The project, which began in February 2016, consisted in the rehabilitation and improvement of the extraction capability of shaft #3 as well as improvement of infrastructure, security and preparation of prospective …

Cyprium Mining (TSXV:CUG) has completed rehabilitation of shaft three of its Potosi silver mine in Santa Eulalia, Mexico.
As quoted in the press release:

The project, which began in February 2016, consisted in the rehabilitation and improvement of the extraction capability of shaft #3 as well as improvement of infrastructure, security and preparation of prospective mining areas at levels 2 to 4 of the mine. The Company also announces that it has been informed by the TSX Venture Exchange Inc. that its common shares will resume trading on Tuesday May 31st, 2016.

Alain Lambert, chairman and CEO of Cyprium, said in a statement:

Over the last three months we have replaced almost 1.5 kilometers of railway tracks at level 0 and at level 4. This includes the installation of railway tracks between an existing raise from the level 4 proposed initial mining area to shaft #3 as well as the installation of railway tracks in the level 4 mining area where much of our near-term mining activities will take place. New air and water tubing has been installed and we have rehabilitated existing equipment including two air-loaders and a small electric locomotive. Once we have re-assembled the air compressor which was brought down into the mine last week, we will turn our focus on cleaning up old stopes in level 2, 3 and 4, retrieving existing mineralized material from past mining operations and initiating drilling and blasting.

Click here for the full press release.

cyprium mining
The Conversation (0)

Go Deeper

AI Powered
Cyprium Metals

Cyprium Metals

Candelaria Mining (TSXV:CAND)

Candelaria Mining

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES