• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • NORTH AMERICA EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • NORTH AMERICA EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Silver Market
    Silver News
    Silver Stocks
    • Silver Market
    • Silver News
    • Silver Stocks

    Cyprium Mining: Shaft 3 Rehabilitation at Potosi Mine Finalized

    Teresa Matich
    May. 30, 2016 09:18AM PST
    Silver Investing

    Cyprium Mining (TSXV:CUG) has completed rehabilitation of shaft three of its Potosi silver mine in Santa Eulalia, Mexico. As quoted in the press release: The project, which began in February 2016, consisted in the rehabilitation and improvement of the extraction capability of shaft #3 as well as improvement of infrastructure, security and preparation of prospective …

    Cyprium Mining (TSXV:CUG) has completed rehabilitation of shaft three of its Potosi silver mine in Santa Eulalia, Mexico.
    As quoted in the press release:

    The project, which began in February 2016, consisted in the rehabilitation and improvement of the extraction capability of shaft #3 as well as improvement of infrastructure, security and preparation of prospective mining areas at levels 2 to 4 of the mine. The Company also announces that it has been informed by the TSX Venture Exchange Inc. that its common shares will resume trading on Tuesday May 31st, 2016.

    Alain Lambert, chairman and CEO of Cyprium, said in a statement:

    Over the last three months we have replaced almost 1.5 kilometers of railway tracks at level 0 and at level 4. This includes the installation of railway tracks between an existing raise from the level 4 proposed initial mining area to shaft #3 as well as the installation of railway tracks in the level 4 mining area where much of our near-term mining activities will take place. New air and water tubing has been installed and we have rehabilitated existing equipment including two air-loaders and a small electric locomotive. Once we have re-assembled the air compressor which was brought down into the mine last week, we will turn our focus on cleaning up old stopes in level 2, 3 and 4, retrieving existing mineralized material from past mining operations and initiating drilling and blasting.

    Click here for the full press release.

    cyprium mining
    The Conversation (0)

    Go Deeper

    AI Powered
    Cyprium Metals

    Cyprium Metals

    Copper North Mining

    Copper North Mining

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×