5.27 g/t Platinum Over 3 Meters Intersected During the First Round of Drilling on Golden Touch Platinum Project

Precious Metals

5.27 grams per tonne of platinum over three meters and up to 2.06 g/t Pt over four meters have been obtained in the first round of drilling in the Golden Touch Resources Corp. (TSXV:GOT,FWB:0GT) Platinum Project (PEL1376) in north-eastern Albania.

5.27 grams per tonne of platinum over three meters and up to 2.06 g/t Pt over four meters have been obtained in the first round of drilling in the Golden Touch Resources Corp. (TSXV:GOT,FWB:0GT) Platinum Project (PEL1376) in north-eastern Albania.

As quoted in the press release:

Five holes were drilled in the first round drilling program for a total of 480.65 meters. All of these holes tested the Bregu I Bibes Prospect, down-dip from where channel sampling of trenches excavated in an outcrop, located zones of 1.5 g/t Pt over 14.0 meters, 1.9 g/t Pt over 11.0 meters and 2.1 g/t Pt over 5 meters.
A total of 496 drill core samples (one metre intervals) were prepared and despatched for assay. Samples were analysed for platinum group elements (platinum and palladium), gold and chromite (Cr2O3).
Results are encouraging with 8 intersections (ranging in length from 1.0 to 4.0 meters) in excess of 1.0 g/t Pt developed within thick widespread intersections (up to 15.0 meters) of low grade Pt over 0.25 g/t. Of particular encouragement are intersections of 5.27 g/t Pt over three meters in Hole BB-4 (including an interval of 1.0m @ 7.60 g/t Pt) and 2.06 g/t Pt over four meters in Hole BB-3.

Click here to read theGolden Touch Resources Corp. (TSXV:GOT,FWB:0GT) press release


Click here to see the Golden Touch Resources Corp. (TSXV:GOT,FWB:0GT) profile.

The Conversation (0)
×