• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Battery Metals Market
    Battery Metals News
    Battery Metals Stocks
    • Battery Metals Market
    • Battery Metals News
    • Battery Metals Stocks

    Pure Energy Completes Pumping Tests at Clayton Valley

    Investing News Network
    Apr. 08, 2015 08:01AM PST
    Battery Metals Investing

    Pure Energy Minerals (TSXV:PE) reported the completion of a series of pumping tests on Borehole CV-1 at the Clayton Valley, Nevada lithium brine prospects.

    Pure Energy Minerals (TSXV:PE) reported the completion of a series of pumping tests on Borehole CV-1 at the Clayton Valley, Nevada lithium brine prospects.

    A high-capacity electric submersible pump was installed in CV-1 and was used to conduct a preliminary step-test that produced flow rates from 40 to 180 gallons per minute (gpm) or 2.5-11 litres/second. During this test, the maximum output of the pump was reached (180 gpm) and higher flow rates of lithium-bearing brine could have been produced. Following recovery, a long-term, constant-discharge test was performed in CV-1 at a rate of 150 gpm (9.5 litres/second) for a period of 8 hours. During this test, the brine level in CV1 reached a steady-state drawdown of 174′ (53 m), demonstrating that higher production pumping rates of lithium-bearing brine are possible from this well. Data collected from these two successful pumping tests are being interpreted by hydrogeologists from BGC Engineering Inc. in Vancouver, and will be used to provide key input information for an Inferred Resource estimate (NI 43-101 compliant) that is being written for the lithium brines present beneath Pure’s Clayton Valley prospects.

    Pure Energy CEO, Robert Mintak, said:

    We are very pleased with the results from the pumping tests as they demonstrate constant flow with minimal draw down, an important milestone in confirming the productive potential of the Clayton Valley project.

    Click here to read the Pure Energy Minerals (TSXV:PE) press release
    Click here to see the Pure Energy Minerals (TSXV:PE) profile.

    nevada lithiumtsxv:pelithium brinespure energy mineralsenergy minerals
    The Conversation (0)

    Go Deeper

    AI Powered

    September 2012 News Catalysts

    Drill Tracker Weekly: Step-out Drilling Expands 780 Zone at Fission’s PLS Project

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES