• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Battery Metals Market
    Battery Metals News
    Battery Metals Stocks
    • Battery Metals Market
    • Battery Metals News
    • Battery Metals Stocks

    Cypress Begins Phase 3 Exploration at Clayton Valley Lithium Brine/Clay Project in Nevada

    Matthew Spizziri
    Sep. 27, 2016 11:40AM PST
    Battery Metals Investing

    Vancouver, BC – Cypress Development Corp. (TSXV:CYP) is pleased to announce that the Company, in close conjunction with its project partner Pure Energy Minerals, has commenced a Phase 3 property wide surface sampling program at Cypress’ 1520 acre Clayton Valley Lithium Brine/Clay Project located in the heart of the Clayton Valley lithium exploration area of Esmeralda County, Nevada.

    Vancouver, BC – Cypress Development Corp. (TSXV:CYP) is pleased to announce that the Company, in close conjunction with its project partner Pure Energy Minerals, has commenced a Phase 3 property wide surface sampling program at Cypress’ 1520 acre Clayton Valley Lithium Brine/Clay Project located in the heart of the Clayton Valley lithium exploration area of Esmeralda County, Nevada.
    ypress’ Clayton Valley Project is within a 0.5 mile of lithium brine wells belonging to the Albemarle Silver Peak Mine and the property shares its western boundary with the lithium resource area of Pure Energy’s Clayton Valley South project.
    The sampling program is being carried out on a systematic grid program of 100 metre sample spacing. Cypress anticipates collecting in excess of 500 samples over the next few weeks. These additional surface samples are intended to compliment previous sampling conducted by Cypress (see news releases Feb. 22nd and May 10th) which encountered a strongly mineralized zone which averages 1350 ppm lithium on average along a 1 kilometer strike length traversing from north to south on the west portion of the property.
    The intent of this Phase 3 program is to allow the Company a property wide view of lithium distribution contained in the surficial volcaniclastic, calcareous mudstone material that covers the property. This large volume of samples are being submitted for assaying with ALS Chemex in Reno Nevada, as they are collected. All samples submitted for assaying will be initially completed using a 33 element four acid ICP contained in an ME-ICP61 analytical procedure. In addition to lithium, boron assays will also be completed for the surface grid sample program.
    On August 24th, Cypress optioned its flagship Clayton Valley Project to Pure Energy Minerals with Cypress remaining the operator of the project until Pure Energy earns a 51% interest. The agreement allows the Company to advance its Clayton Valley Project while working with and utilizing the geological expertise of the Pure Energy team.
    On September 8th, Cypress announced an agreement to acquire a 100% interest in a 2nd Clayton Valley lithium project. The 2,700 acre “Dean” Lithium Brine/Clay Project is located immediately adjacent to the Albemarle’s Silver Peak Mine on the west boundary, Pure Energy Minerals project on its southwest boundary and Cypress’ existing Clayton Valley Project on its southern boundary.
    Cypress has already initiated a surface sampling program on the new Dean Project. Initial assay results for lithium from the abundant, green evaporite rich volcanoclastic claystone exposure on the property are pending and will help direct the Company on expanding its work program on this project in the near future.
    Connect with Cypress Development Corp. (TSXV:CYP) to receive an Investor Presentation.

    clayton valley lithiumlithium explorationlithium resourceenergy minerals
    The Conversation (0)

    Go Deeper

    AI Powered
    Century Lithium (TSXV:LCE)

    Century Lithium

    CYPRESS DEVELOPMENT ENGAGES THYSSENKRUPP NUCERA FOR DESIGN AND ENGINEERING OF CHLOR-ALKALI PLANT IN FEASIBILITY STUDY

    CYPRESS DEVELOPMENT ENGAGES THYSSENKRUPP NUCERA FOR DESIGN AND ENGINEERING OF CHLOR-ALKALI PLANT IN FEASIBILITY STUDY

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES