The Conversation (0)
Landore Resources Limited (LSE:LND) announced a drilling update on its Junior Lake nickel project B4-7 deposit.
Landore Resources Limited (LSE:LND) announced a drilling update on its Junior Lake nickel project B4-7 deposit.
As quoted in the press release:
- The current drilling campaign on the eastern section of the B4-7 deposit has significantly enhanced the volume of B4-7 massive sulphide mineralisation within the upper 150-metre portion of the deposit along 475 metres of strike.
- Drilling has consistently intersected massive sulphide mineralisation, including drill-hole 0412-378 reporting 23.97 metres with grades of 0.80% Nickel, 0.57% Copper, 0.07% Cobalt, 737ppb Palladium, and 124ppb Platinum.
- The drilling has also successfully established continuity on the adjacent polymetallic zone (‘alpha zone’) along 375 metres of strike to date, including drillhole 0412-370 reporting 3.00 metres at 2,134ppb Palladium, 171ppb Platinum, and 0.29% Nickel.
Click here to read the Landore Resources Limited (LSE:LND) press release.