• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Silver Market
    Silver News
    Silver Stocks
    Silver Price
    • Silver Market
    • Silver News
    • Silver Stocks
    • Silver Price
    market news

    Sabina Gold & Silver Announces Commencement of the Review of its Water License Applications for the Back River Project

    Melissa Shaw
    Dec. 11, 2017 08:55AM PST
    Silver Investing

    Sabina Gold & Silver (TSX:SBB.T), (“Sabina” or the “Company”) is pleased to announce that the Nunavut Water Board (NWB) has commenced public review of the Type A and Type B water license applications related to initial development, mine construction and operation of the Back River Project (the “Project” or “Back River”). As announced on December …

    Sabina Gold & Silver (TSX:SBB.T), (“Sabina” or the “Company”) is pleased to announce that the Nunavut Water Board (NWB) has commenced public review of the Type A and Type B water license applications related to initial development, mine construction and operation of the Back River Project (the “Project” or “Back River”).

    As announced on December 6, 2017, the Minister of Indigenous and Northern Affairs Canada, on behalf of the five responsible federal Ministers, accepted Nunavut Impact Review Board’s recommendation for the Project to proceed to the regulatory and licensing phase.  The NIRB has advised that the final Project Certificate will be issued on or before January 4, 2018.

    The Type B water license would enable Sabina to commence certain initial pre-development activities in 2018 including onsite construction of service roads and laydown pads, and the mobilization of fuel, supplies and equipment at the Goose property and marine laydown area.  Sabina anticipates approval of the Type B water license in late Q1, 2018.

    Click here to read the full text release. 

    tsx:sbbmine constructionmarket newscanada
    The Conversation (0)

    Go Deeper

    AI Powered
    Cassiar highway, BC, Canada

    Navigating BC Mine Permitting

    Sabina Gold & Silver Corp.

    Latest News

    LaFleur Minerals Announces Brokered Private Placement of Gold-Linked Convertible Notes to Finance Restart of Gold Production at Beacon Gold Mill

    Prismo Metals Provided Extensions on Hot Breccia Copper Project

    Locksley Resources Limited Accelerates Path to U.S Antimony Production

    Red Mountain Mining Limited Set to Commence Trading on US Stock Exchange

    LaFleur Minerals Provides Update on Confirmation Drilling for PEA at Swanson Gold Deposit and Beacon Gold Mill, Val-d'Or, Québec

    More News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES