Osisko Intersects 2.51 g/t Au Over 73.0 Metres at Garrison

Gold Investing

Osisko Mining (TSX:OSK) (“Osisko” or the “Corporation”) is pleased to announce the final results from the 2017 drill program at its 100% owned Garrison gold project located in Garrison Township, Ontario. Over 85,000 metres of new drilling have been conducted by Osisko on the Garrison Project since its acquisition in late 2015. A total of …

Osisko Mining (TSX:OSK) (“Osisko” or the “Corporation”) is pleased to announce the final results from the 2017 drill program at its 100% owned Garrison gold project located in Garrison Township, Ontario. Over 85,000 metres of new drilling have been conducted by Osisko on the Garrison Project since its acquisition in late 2015. A total of fifteen new intercepts in seven holes are reported in this release, with significant assay results presented in the table below.

Significant new results include: 2.51 g/t Au over 73.0 metres in OSK-G17-453; 1.98 g/t Au over 14.5 metres and 1.76 g/t Au over 25.5 metres in OSK-G17-461; 2.18 g/t Au over 9.0 metres in OSK-G17-445; and 1.27 g/t Au over 22.3 metres in OSK-G17-467.

About the Garrison Project

The Garrison Project area is comprised of 214 mineral claims, 25 mining leases, and 87 patent claims encompassing approximately 8,000 hectares.

Click here to read the full text release.

The Conversation (0)
×