- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
Purpose Bitcoin ETF
Silver47 Exploration
CI Galaxy Bitcoin ETF
Rua Gold
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Galena Mining: Activities Report for Quarter Ended 31 December 2020
GALENA MINING LTD. (“Galena” or the “Company”) (ASX: G1A) reports on its activities for the quarter ending 31 December 2020 (the “Quarter”),
HIGHLIGHTS:
- Finalised US$100M in project financing debt facilities for the development of the Abra Base Metals Project, made up of:
- US$100M Project Finance Facility; and
- US$10M Cost Overrun Facility
- Received an A$20M investment tranche from Toho into AMPL
- Recommenced preparatory construction and site enabling works, with Project development works 12% complete at the end of the Quarter
- Successfully concluded the 2020 Abra Drilling Program with a total of 57 completed diamond drill-holes (~25km of drilling), taking total cumulative drilling on Abra to over 100km
- At the date of this report, assays have been published for 34 drill-holes, including the following highlights:
Five holes had cumulative significant lead-silver intersections >50m
- Best high-grade lead-silver drill hole ever at Abra (hole AB147), with
>86m of cumulative significant intersections, including:- 17.5m at 9.6% lead and 34g/t silver from 266.2m
- 20.9m at 7.3% lead and 20g/t silver from 288.1m
- 35.5m at 15.1% lead and 22g/t silver from 321.8m
- 8.9m at 17.1% lead and 26g/t silver from 366.2m
One of the last drill-holes drilled in the Program (AB195) was drilled to target the interpreted copper and gold zone – Assays remain pending for that hole but it passed through an approximately 45m zone of visual intermittent massive and disseminated copper-bearing chalcopyrite mineralisation from a down-hole depth of 752m
A number of holes targeting lead-silver coincidentally extended into copper and gold mineralisation, with notable significant intersections including:
- 3.0m at 2.0% copper, 2.3g/t gold and 29g/t silver from 401.6m in AB174
- 6.0m at 1.8% copper and 1.3g/t gold from 391.8m in AB179
- 4.9m at 1.0 g/t gold and 24g/t silver from 424.2m in AB166
GALENA MINING LTD. (“Galena” or the “Company”) (ASX: G1A) reports on its activities for the quarter ending 31 December 2020 (the “Quarter”), largely focused on advancing its 77.28%-owned Abra Base Metals Project (“Abra” or the “Project”) located in the Gascoyne region of Western Australia.
ABRA BASE METALS PROJECT (77.28%)
Abra comprises a granted Mining Lease, M52/0776 and is surrounded by the Exploration Licence E52/1455, together with several co-located General Purpose and Miscellaneous Leases. The Project is 100% owned by Abra Mining Pty Limited (“AMPL”), which in turn is currently 77.28% owned by Galena, with the remainder owned by Toho Zinc Co., Ltd. (“Toho”) (pursuant to an
Investment Agreement and Shareholders Agreement with Toho).
Abra is fully permitted and commenced initial construction works in September 2019.
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.