- WORLD EDITIONAustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Trevali Mining Reports Preliminary Q2 Production Results From Santander Mine
Trevali Mining Corporation (TSX:TV,BVL:TV,OTCQX:TREVF,FWB:4TI) announced preliminary production results for the second quarter of 2014 of roughly 12 million payable pounds of zinc, 4.4 million payable pounds of lead and 187,000 payable ounces of silver from its Santander Mine located in Peru. Trevali also reported that it remains well on track for its 2014 Santander production guidance, which is estimated at approximately 670,000 to 690,000 tonnes of mill throughput.
Trevali Mining Corporation (TSX:TV,BVL:TV,OTCQX:TREVF,FWB:4TI) announced preliminary production results for the second quarter of 2014 of roughly 12 million payable pounds of zinc, 4.4 million payable pounds of lead and 187,000 payable ounces of silver from its Santander Mine located in Peru. Trevali also reported that it remains well on track for its 2014 Santander production guidance, which is estimated at approximately 670,000 to 690,000 tonnes of mill throughput.
As quoted in the press release:
Average recoveries for the quarter were 88% for zinc, 84% for lead and 70% for silver. Q2-2014 throughput at the 2,000-tonne-per-day-rated Santander processing complex was 175,384 tonnes, delivering a mill utilization factor of 99.7%. Average head grades of 4.20% Zn, 1.42% Pb and 1.44 oz/ton Ag were realized to produce approximately 13,048 tonnes of zinc concentrate averaging 49% Zn and 3,680 tonnes of lead-silver concentrate averaging 57% Pb and 48.8 oz/ton Ag.
Click here to read the Trevali Mining Corp. (TSX:TV) press release
Click here to see the Trevali Mining Corp. (TSX:TV) profile.
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.Â