• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Silver Market
    Silver News
    Silver Stocks
    Silver Price
    • Silver Market
    • Silver News
    • Silver Stocks
    • Silver Price

    Trevali Mining Reports Preliminary Q2 Production Results From Santander Mine

    Teresa Matich
    Jul. 15, 2014 08:15AM PST
    Silver Investing

    Trevali Mining Corporation (TSX:TV,BVL:TV,OTCQX:TREVF,FWB:4TI) announced preliminary production results for the second quarter of 2014 of roughly 12 million payable pounds of zinc, 4.4 million payable pounds of lead and 187,000 payable ounces of silver from its Santander Mine located in Peru. Trevali also reported that it remains well on track for its 2014 Santander production guidance, which is estimated at approximately 670,000 to 690,000 tonnes of mill throughput.

    Trevali Mining Corporation (TSX:TV,BVL:TV,OTCQX:TREVF,FWB:4TI) announced preliminary production results for the second quarter of 2014 of roughly 12 million payable pounds of zinc, 4.4 million payable pounds of lead and 187,000 payable ounces of silver from its Santander Mine located in Peru. Trevali also reported that it remains well on track for its 2014 Santander production guidance, which is estimated at approximately 670,000 to 690,000 tonnes of mill throughput.

    As quoted in the press release:

    Average recoveries for the quarter were 88% for zinc, 84% for lead and 70% for silver. Q2-2014 throughput at the 2,000-tonne-per-day-rated Santander processing complex was 175,384 tonnes, delivering a mill utilization factor of 99.7%. Average head grades of 4.20% Zn, 1.42% Pb and 1.44 oz/ton Ag were realized to produce approximately 13,048 tonnes of zinc concentrate averaging 49% Zn and 3,680 tonnes of lead-silver concentrate averaging 57% Pb and 48.8 oz/ton Ag.

    Click here to read the Trevali Mining Corp. (TSX:TV) press release
    Click here to see the Trevali Mining Corp. (TSX:TV) profile.

    trevali-mining-corporationotcqx-trevftsx-tv
    The Conversation (0)

    Go Deeper

    AI Powered
    Trevali Mining

    Trevali Mining

    Trevali Mining’s African Acquisitions Boost Zinc Output in Q1

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES