Calibre Mining Drilling Continues to Expand Gold-Silver Vein Systems

Resource Investing News

Calibre Mining (TSXV:CXB) has announced the first set of results from the 2016 drilling program on the Eastern Borosi Project, Nicaragua. As quoted in the press release: Highlights Drilling to date in 2016 consists of 18 diamond drill holes for a total of 3,487.5 metres, with results received and reported here for the first 11 …

Calibre Mining (TSXV:CXB) has announced the first set of results from the 2016 drilling program on the Eastern Borosi Project, Nicaragua.
As quoted in the press release:

Highlights

  • Drilling to date in 2016 consists of 18 diamond drill holes for a total of 3,487.5 metres, with results received and reported here for the first 11 holes
  • Diamond drilling of the Blag Gold-Silver Vein System has further extended the defined mineralization on two targets, including; Main Blag Structure and the East Dome
  • Step out drilling on the East Dome has intersected 4.51 metres grading 1.82 g/t gold and 146.3 g/t silver including 1.56 metres grading 4.44 g/t gold and 142.9 g/t silver
  • Step out drilling on the Main Blag Structure has intersected 4.64 metres grading 1.51 g/t gold and 38.1 g/t silver including 0.85 metres grading 7.10 g/t gold and 62.6 g/t silver
  • Additional drilling in 2016 has tested extensions to the Guapinol and Vancouver Vein Structures, and first pass drilling on the Vein Swarm Target.

Greg Smith, president and CEO, said:

Drilling in 2016 at the Eastern Borosi Project continues to expand the gold-silver vein systems showing the robust nature of the mineralization. Drilling in 2016 has extended mineralization along strike and down dip at both the Main Blag and East Dome targets.

Click here to read the full press release.

The Conversation (0)
×