The Conversation (0)
PMI Gold Corporation (TSXV:PMV) announced positive results from the first phase drilling program at the Fromenda Prospect in Ghana.
PMI Gold Corporation (TSXV:PMV) announced positive results from the first phase drilling program at the Fromenda Prospect in Ghana.
As quoted in the report:
Key Points:
- First phase of drilling has now been completed at the Fromenda Prospect, located 15km south-west of PMI Gold’s Obotan Project, intersects further high grade gold mineralization of up to 38.18g/t Au.
- A total of 68 RC drill holes have been drilled for 6,775m. Assay results from the remaining 55 holes have now been received.
- The Fromenda Prospect lies within the Asankrangwa Gold Belt and sits on the prospective regional, north-east trending Fromenda Shear, which is parallel to the regional Nkran Shear to the west, at the intersection with favourable east-northeast trending cross-cutting structures.
- Significant results received include (true width is 60-70% of the downhole intersection lengths):
- 26m @ 1.74g/t Au from 82m
- 40m @ 2.06g/t Au from 55m
- 17m @ 4.28g/t Au from 4m (including 3m @ 15.58g/t Au from 12m)
- Results further confirm the occurrence of a gold system over a strike extent in excess of 500m, which remains open down-dip.
PMI Gold’s Managing Director and CEO, Mr Collin Ellison, commented:
Further high grade values and broad intercepts received from the Fromenda Prospect confirm this area as a high priority target. Geological interpretations and modelling are ongoing to gain a greater understanding of the structural controls on mineralization and enable optimal planning of further drilling planned for later in the year.
Click here to read the full press release.