• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Gold Market
    Gold News
    Gold Stocks
    Gold Price
    • Gold Market
    • Gold News
    • Gold Stocks
    • Gold Price

    Falco Drills 12.4 Metres at 5.14 g/t AuEq at Horne 5 West Extension

    Matthew Spizziri
    Sep. 13, 2016 10:15AM PST
    Gold Investing

    MONTREAL, QC –(Marketwired – September 13, 2016) – Falco Resources Ltd. (TSXV:FPC) is pleased to report the three (3) initial drill results from its 2016 exploration and development program at its 100% owned Horne 5 project located inRouyn-Noranda, Québec. The two (2) initial holes were drilled in the existing Horne 5 mineralized envelope.

    MONTREAL, QC –(Marketwired – September 13, 2016) – Falco Resources Ltd. (TSXV:FPC) is pleased to report the three (3) initial drill results from its 2016 exploration and development program at its 100% owned Horne 5 project located inRouyn-Noranda, Québec. The two (2) initial holes were drilled in the existing Horne 5 mineralized envelope. The third hole was drilled in the Horne 5 West Extension Target.
    Luc Lessard, President and CEO, comments: “We are very pleased with the initial result from the Horne 5 West drilling, this first result demonstrates the potential for further resource definition to the west of the currently defined Horne 5 deposit”.
    HORNE 5 DRILLING PROGRAM
    The first two (2) drill holes were completed within the existing Horne 5 deposit envelope. The drill holes tested specific areas of the Horne 5 deposit in order to increase the geological and metallurgical understanding of the Horne 5 deposit. Highlights from new drill holes include 43.2 metres at 2.73 g/t AuEq in drill hole H5-16-17 and 177.2 metres at 1.71 g/t AuEq in drill hole H5-16-18. Details of the new results are outlined in the attached table.
    Hole H5-16-17:
    Positive results from hole H5-16-17 have confirmed grade and thickness at the western edge of the deposit. Due to its location, hole H5-16-17 cannot be compared to the historical database given there is no data within a 15 metre radius of the encountered mineralization. The mineralized interval of hole H5-16-17 correlates well with the thickness of the envelope interpreted in the resource estimate — see January 25th, 2016 press release for details.
    Hole H5-16-18:
    Hole H5-16-18 tested an area specifically for metallurgical purposes, yet also improved our confidence level in the historical database. Given the location of hole H5-16-18 a comparison to the historical database was completed. The reported interval was of 177 metres, however in order to compare the results to the historical database, 37 metres of mineralization were not used. This additional mineralization of comparable grade could suggest an increase in thickness on the Horne 5 mineral envelope in this specific zone. Details of hole H5-16-18 are outlined in the table below.
    HORNE 5 WEST EXPLORATION DRILLING PROGRAM
    The Horne 5 Western Extenstion drilling program was initiated to test potential mineralization located west of the currently defined Horne 5 deposit. The Company initiated a 10,000 metre drilling program to test an area located between the western edge of the Horne 5 deposit and the Horne Creek fault, the tested zone being located between 600 metres and 1,300 metres below surface. The tested area was never specifically targeted previously.
    HOLE H5-16-17A
    Positive results from hole H5-16-17A have confirmed presence of grade and thickness in the western continuity of the Horne 5 deposit. This initial result is very encouraging. Highlights include 12.4 metres at 5.14 g/t AuEq.
    Connect with Falco Resources Ltd. (TSXV:FPC) to receive an Investor Presentation.

    drill-results
    The Conversation (0)

    Go Deeper

    AI Powered
    Heliostar Drills 88 m Grading 8.82 g/t Gold in Resource Conversion Drilling and Adds Third Drill Rig at Ana Paula

    Heliostar Drills 88 m Grading 8.82 g/t Gold in Resource Conversion Drilling and Adds Third Drill Rig at Ana Paula

    Brixton Metals Drills 1.5m of 9.5 g/t Gold, 13.8% Copper, 771.5 g/t Silver, 7.6% Lead, 609 g/t Tellurium, 7.1% Zinc, and >1% Antimony

    Brixton Metals Drills 1.5m of 9.5 g/t Gold, 13.8% Copper, 771.5 g/t Silver, 7.6% Lead, 609 g/t Tellurium, 7.1% Zinc, and >1% Antimony

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES