- AustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Continental Gold Drills 29.1 Metres at 23.7 g/t Gold at the Buriticá Project
Continental Gold Limited (TSX:CNL,OTCQX:CGOOF) announced the most recent drill results from their Buriticá project in Antioquia, Colombia.
Continental Gold Limited (TSX:CNL,OTCQX:CGOOF) announced the most recent drill results from their Buriticá project in Antioquia, Colombia.
As quoted in the press release:
Drilling in BUSY291 and BUSY299 and previously announced BUSY231 (5.95 m @ 125.9 g/t Gold and 66 g/t Silver) are now interpreted to be a northern extension of the Veta Sur vein system. These veins are situated outside of the current mineral resource estimate block model prepared in accordance with NI 43-101 as announced on October 1, 2012.
Continental Gold Limited’s CEO, Ari Sussman, said:
Drilling continues to deliver superb results in expanding the envelope at Veta Sur. Development equipment is already at the location of both the proposed Veta Sur ramp and Yaraguá tunnel, with the first blast for both development faces anticipated to occur on schedule towards the end of November 2012.
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.