Calibre Mining Trenches 58.0 Metres Grading 0.70 g/t Gold at the Primavera Gold-Copper Project, Nicaragua

Gold Investing

Calibre Mining Corp. (TSXV:CXB) announced that the Company has received complete assay results for Trenches PRTR11-012 and PRTR11-013 excavated on the newly discovered Primavera gold-copper prospect on the Borosi Project in Northeast Nicaragua.

Calibre Mining Corp. (TSXV:CXB) announced that the Company has received complete assay results for Trenches PRTR11-012 and PRTR11-013 excavated on the newly discovered Primavera gold-copper prospect on the Borosi Project in Northeast Nicaragua.

As quoted in the press release:

PRTR11-012 intersected continuous gold and copper mineralization over the entire excavated length of the trench and returned a weighted average grade of 0.70 g/t Au and 1313 ppm Cu over 58.0 metres (190 feet) with the mineralization being open for expansion in all directions (see Table 1 below). Trench PRTR11-012 was excavated in an east-west direction and is located approximately 100 m south of Trench PRTR11-005 that returned 1.53 g/t Au and 680 ppm Cu over 51.25 metres. (see Calibre News Release dated October 3, 2011). One additional trench has been completed on the Primavera gold-copper system with assay results pending. The six trenches have been excavated within an 850 metre by 300 metre gold and copper soil anomaly that remains open for expansion in a region that has very limited rock exposure and no documented previous exploration.

Click here to read the Calibre Mining Corp. (TSXV:CXB) press release


Click here to see the Calibre Mining Corp. (TSXV:CXB) profile.

The Conversation (0)
×