Balmoral Resources Drills 19.55 G/t Gold over 44.45 Meters at Bug Lake

Resource Investing News

Balmoral Resources (TSX:BAR) reported results from the first 9 holes of its recently completed 2015 winter drill program. Highlights of results included intercepts of 19.55 grams per tonne of gold over 44.45 meters, including 34.84 grams per tonne of gold over 24.14 meters and 4.28 grams per tonne of gold over 53.78 meters including 7.01 grams per tonne of gold over 22.48 meters.

Balmoral Resources (TSX:BAR) reported results from the first 9 holes of its recently completed 2015 winter drill program. Highlights of results included intercepts of 19.55 grams per tonne of gold over 44.45 meters, including 34.84 grams per tonne of gold over 24.14 meters and 4.28 grams per tonne of gold over 53.78 meters including 7.01 grams per tonne of gold over 22.48 meters.

As quoted in the press release:

Drilling focused on infill and expansion of the known gold zones across a 225 long x 150 metre deep section of the 1,200 metre long x 400 metre deep, open ended Bug Lake Gold Trend. Today’s results continue to demonstrate the continuity of high-grade gold mineralization within the numerous zones located along the north-south oriented Bug Lake Gold Trend, and in particular the very high-grade nature of the Footwall and Hanging Wall Zones (see Figures 1, 2 and 3).

Balmoral president and CEO, Darin Wagner, said:

We are pleased to see our initial winter assays meet, or in several cases exceed, results from our previous work in this portion of the Bug Lake Gold Trend and pleasantly surprised with the identification of high-grade base metal sulphides potentially associated with the Martiniere East VMS system.

Click here to read the Balmoral Resources (TSX:BAR) press release

The Conversation (0)
×