• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Gem Market
Gem News
Gem Stocks
  • Gem Market
  • Gem News
  • Gem Stocks

Jade Leader Begins DJ Project Drilling

Ashley Cowell
Nov. 02, 2018 06:07AM PST
Gem Investing

Jade Leader Corp. (TSXV:JADE) (“Jade Leader” or “the Company”) is pleased to announce that the first ever drilling program on its DJ project in Washington State, for which Jade Leader has an option to earn a 100% interest, is now underway.

Jade Leader Corp. (TSXV:JADE) (“Jade Leader” or “the Company”) is pleased to announce that the first ever drilling program on its DJ project in Washington State, for which Jade Leader has an option to earn a 100% interest, is now underway. Drilling started with a portable core rig on October 30th, 2018 to test the full interpreted width and length of the Lode 1 Jade zone. Lode 1 was initially identified at surface through intermittent Jade outcrop and subcrop over a strike length of some 140 meters, but pre-drilling field work extended it to over 170 meters. Drill testing of the Lode 2 target is planned to immediately follow first pass Lode 1 drilling. The Company expects to report progress as drilling of each target is completed, core logged and the geological information plotted and interpreted.

The first two short drill holes completed to date on Lode 1 total 34.10 meters and have returned the information required to refine target geometry for the balance of Lode 1 drilling. The plan consists of a total of 8 holes drilled to depths of 50-60 meters on 4 sections spaced 20 to 30 meters apart. While the initial plan was to test 50 meters of strike length on Lode 1, the current plan is to extend testing over a minimum of 90 meters of strike length.

Mr. Jean-Pierre Jutras, P.Geol., President of the Company, is the Qualified Person for the Company’s Jade projects as defined by National Instrument 43-101 and has approved the technical disclosure contained in this news release.

On Behalf of the Board of Directors,

“Jean-Pierre Jutras”

Jean-Pierre Jutras
President/Director

The TSX Venture Exchange has neither approved nor disapproved of the contents of this press release.

Except for the historical and present factual information contained herein, the matters set forth in this news release, including words such as “expects”, “projects”, “plans”, “anticipates” and similar expressions, are forward-looking information that represents management of Jade Leader’s internal projections, expectations or beliefs concerning, among other things, future operating results and various components thereof or the economic performance of Jade Leader. The projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Jade Leader’s actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, those described in Jade Leader’s filings with the Canadian securities authorities. Accordingly, holders of Jade Leader shares and potential investors are cautioned that events or circumstances could cause results to differ materially from those predicted. Jade Leader disclaims any responsibility to update these forward-looking statements.

Source: www.accesswire.com

dj project jade leader corp. tsxv:jade washington state jean-pierre jutras
The Conversation (0)

Go Deeper

AI Powered
Foremost Clean Energy Reports High-Grade Gold Results from First Two Holes of 2025 Jean Lake Drill Program Highlighted by 10.7 g/t Au over 5.6 m Including 82 g/t Au over 0.7 m

Foremost Clean Energy Reports High-Grade Gold Results from First Two Holes of 2025 Jean Lake Drill Program Highlighted by 10.7 g/t Au over 5.6 m Including 82 g/t Au over 0.7 m

Drilling Update at Laguna Verde

Drilling Update at Laguna Verde

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Gem Investing Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES