Bayswater: $2.5 Million Drilling Program Planned at Kilgore gold project

Company News

Bayswater Uranium Corporation reports that a $2.5 million drilling program is planned at the Kilgore gold project in Clark County, Idaho.
Otis has signed an agreement with Timberline Drilling Inc, of Coeur d’Alene, Idaho to supply two core rigs to drill at Mine Ridge. Drilling will be on a 24-hour basis, with approximately 6,000 metres spread between a […]

Bayswater Uranium Corporation reports that a $2.5 million drilling program is planned at the Kilgore gold project in Clark County, Idaho.

Otis has signed an agreement with Timberline Drilling Inc, of Coeur d’Alene, Idaho to supply two core rigs to drill at Mine Ridge. Drilling will be on a 24-hour basis, with approximately 6,000 metres spread between a minimum of 30 holes located throughout four quadrants encircling the deposit’s central Mine Ridge area. Drilling is designed, in part, to convert inferred resource material into the indicated category and to drill in-fill and step-out holes to both upgrade the current resource and to test for further resource expansion, as well as closure, where the deposit remains open.

For complete news release, click here.

For Bayswater Uranium’s company profile, click here.

The Conversation (0)
×