• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • WORLD EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • WORLD EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Rare Earth Market
    Rare Earth News
    Rare Earth Stocks
    • Rare Earth Market
    • Rare Earth News
    • Rare Earth Stocks

    MBAC Fertilizer to Start Production at Araxa Project in Q1 2016

    Charlotte McLeod
    Sep. 17, 2012 10:54AM PST
    Rare Earth Investing

    MBAC Fertilizer Corp. (TSX:MBC,OTCQX:MBCFF) announced the results from the preliminary economic assessment for its wholly-owned, Brazil-based Araxa rare earth oxide (REO)/niobium/phosphate project, commenting that the project is expected to start production in the first quarter of 2016 and will initially produce 8,750 tonnes of REO per year.

    MBAC Fertilizer Corp. (TSX:MBC,OTCQX:MBCFF) announced the results from the preliminary economic assessment for its wholly-owned, Brazil-based Araxa rare earth oxide (REO)/niobium/phosphate project, commenting that the project is expected to start production in the first quarter of 2016 and will initially produce 8,750 tonnes of REO per year.

    According to the press release, highlights include:

    • The PEA is based on the current mineral resource estimate for the Araxá Project contained in the amended and restated technical report filed on August 31, 2012, comprising a combined measured and indicated mineral resource of 6.34 Mt at 5.01% TREO and an inferred mineral resource of 21.94 Mt at 3.99% TREO.
    • Estimated production of 740 tonnes per annum of niobium oxide as a by-product in the first five years, growing to 1,832 tonnes per annum during Phase 3.
    • Mine life of 40 years with significant resource expansion potential.
    • Capital costs of US$406.05 million estimated for Phase 1, with an additional US$214.48 million estimated for the expansion required after the fifth year of operation.

    Click here to read the full MBAC Fertilizer Corp. (TSX:MBC,OTCQX:MBCFF) press release.

    mine lifebrazilmbac fertilizer corptsx:mbc
    The Conversation (0)

    Go Deeper

    AI Powered
    Periodic table symbols for 17 rare earth elements.

    Rare Earths Stocks: 9 Biggest Companies in 2025

    Tractor on farm field.

    9 Phosphate Stocks to Watch

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×