• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Battery Metals Market
Battery Metals News
Battery Metals Stocks
  • Battery Metals Market
  • Battery Metals News
  • Battery Metals Stocks

Cancana to Expand Capacity at Manganese JV to 50,000 Tonnes per Year in 2016

Kristen Moran
Sep. 17, 2015 10:31AM PST
Battery Metals Investing

Cancana Resources (TSXV:CNY) announced that its joint venture Brazil Manganese Corp. has received the engineering report for Ausenco Ltd, based on an audit of its two plant operations, which recommended ways to optimize and increase production.

Cancana Resources (TSXV:CNY) announced that its joint venture Brazil Manganese Corp. has received the engineering report forĀ Ausenco Ltd, based on an audit of its two plant operations, which recommended ways to optimize and increase production.
As quoted in the press release:

The report recommended that the best way of optimizing and increasing production is to concentrate operations at the Jaburi plant. The goal is to achieve cost savings through streamlining the plant, as well as providing reliable conditions for the company to achieve its production and safety goals.
The improvements recommended include: the update of some equipment, such as jigs and crushers; revamping of some conveyor belts; upgrades in the water and tailings systems; connection to the local power grid; and a few additional infrastructure adjustments. Ā Some of these improvements have already been implemented to increase current efficiency and capacity.Ā  The revamped Jaburi plant will be able to process both colluvium and primary vein material present at the project. Based on the recommendations, plant production capacity in 2016 is targeted at 50,000 tonnes of high-grade, finished product per year.

Anthony Julien, president and CEO of Cancana, commented:

With this engineering plan we have a clear path to more than doubling current production capacity, and lower costs.Ā  We have exceeded our goals for improving the efficiency of our current operations and with first results from our underground exploration to appear soon, we have been able to demonstrate significant progress in both major parts of our project.

Click here to read the full Cancana Resources (TSXV:CNY) press release.

brazil brazil manganese joint venture tsxv:cny
The Conversation (0)

Go Deeper

AI Powered
Antilles Gold (ASX:AAU)

Results of Updated Scoping Study for Nueva Sabana Mine, Cuba

Work Accelerates on R11 Billion Integrated Manganese Venture

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES