• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • WORLD EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • WORLD EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Battery Metals Market
Battery Metals News
Battery Metals Stocks
  • Battery Metals Market
  • Battery Metals News
  • Battery Metals Stocks

Pure Energy Minerals Starts Next Stage of Permitting at Clayton Valley South

Written by Teresa Matich
|
Jun. 02, 2016 09:25AM PST

Pure Energy Minerals (TSXV:PE) has engaged SRK consulting to conduct baseline environmental monitoring at its Clayton Valley South lithium project. As quoted in the press release: The immediate purpose of this work is to support the filing of anticipated regulatory applications for the anticipated expansion of Pure Energy’s exploration program and future project development work. …

Pure Energy Minerals (TSXV:PE) has engaged SRK consulting to conduct baseline environmental monitoring at its Clayton Valley South lithium project.
As quoted in the press release:

The immediate purpose of this work is to support the filing of anticipated regulatory applications for the anticipated expansion of Pure Energy’s exploration program and future project development work. Longer term, the information collected through this process can also be used to support potential operating permit applications.
In addition, SRK will prepare a detailed permitting plan outlining the necessary regulatory instruments required for the entire Project life cycle. The permitting plan will identify the permits and approvals that would be required to advance the CVS Project through resource expansion, longer term pumping tests, pilot plant operation, feasibility study, and ultimately, to production. The work product from the permitting plan will include a detailed schedule of activities and elements that warrant attention going forward.

Pure Energy CEO, Patrick Highsmith, said:

This is an important first step in a process that will evolve through various phases with the regulatory agencies at the county, state and federal levels. It is exciting to lay this foundation by documenting the key environmental attributes of the project area. Pure Energy intends to develop one of the most sustainable lithium production facilities in the world, and we are committed to an efficient, professional, and rigorous permitting process to achieve that. It is also helpful to be working with SRK Consulting, who have an excellent permitting track record in Nevada.

Click here for the full press release.

tsxv:pe energy minerals pilot plant pure energy minerals
The Conversation (0)

Go Deeper

AI Powered
Electric Royalties (TSXV:ELEC)

Electric Royalties

Green Technology Metals

Green Technology Metals

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES