• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • NORTH AMERICA EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • NORTH AMERICA EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Battery Metals Market
    Battery Metals News
    Battery Metals Stocks
    • Battery Metals Market
    • Battery Metals News
    • Battery Metals Stocks

    Neometals Points to Positive Results From Expansion Drilling at Mt Marion

    Teresa Matich
    Feb. 01, 2016 09:05AM PST
    Battery Metals Investing

    Neometals (ASX:NMT) pointed to positive drill results released by Mineral Resources (ASX:MIN) for infill and expansion drill program at the Mt Marion lithium project on September 29.

    Neometals (ASX:NMT) pointed to positive drill results released by Mineral Resources (ASX:MIN) for infill and expansion drill program at the Mt Marion lithium project on September 29.
    As quoted in the press release:

    During the December Quarter, 46 RC holes were drilled at the No.6 Deposit, for a total of 2,324 metres and 9 (83mm‐PQ) Diamond holes were drilled for a total of 693.2 metres on Deposits 1,2 and 2West.
    The first phase of the resource infill and extension project is targeted at extending the size and increasing the classification of the existing resources at Deposits 1,2,2West and 6, and newly acquired lithium, rights on part of Hampton Location 53 (see plan below).  Mt Marion’s current   total Indicated and Inferred Mineral Resources are 23.24Mt at 1.39% Li2O and 1.43% Fe2O3, at a cut‐off grade of 0% Li2O (Appendix A).
    A 30‐hole diamond drilling program for metallurgical and geotechnical purposes has been completed in January and the RC drill program continues with completion expected around the end of the March.   New mineral resource and ore reserve estimates are planned for completion in the June and September Quarters respectively.

    Click here for the full press release.

    asx:mindrill results
    The Conversation (0)

    Go Deeper

    AI Powered
    Canada Nickel Announces New Nickel Discovery at Midlothian Property with Larger Potential Footprint than Flagship Crawford Property

    Canada Nickel Announces New Nickel Discovery at Midlothian Property with Larger Potential Footprint than Flagship Crawford Property

    Mclaren Minerals

    Phase 1 Drill Program – Operational and Geological Progress Update

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
      • Electric Vehicles
    • Agriculture
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Energy
      • Uranium
      • Oil and Gas
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Robotics
      • Crypto
      • Cleantech
    Life Science
      • Biotech
      • Cannabis
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES