Force Energy Corp. Completes Phase 1 Due Diligence, Verifies Lithium Resource on Zoro 1 Property
Force Energy Corp. (OTCBB:FORC,FWB:FC2) announced that Phase 1 due diligence is now complete on the company’s Zoro 1 property.
Force Energy Corp. (OTCBB:FORC,FWB:FC2) announced that Phase 1 due diligence is now complete on the company’s Zoro 1 property.
As quoted in the press release:
Phase 1 consisted of locating, power washing and channel sampling spodumene-bearing pegmatite exposed in 16 trenches on the property. Force Energy’s field crews channel sampled 16 trenches at the target resulting in the collection of 165 samples each 0.5 m in length, 7 cms in width and 7 cms in depth. An additional 6 new trenches discovered by prospecting on the property were also sampled.
Force Energy’s President, Tim DeHerrera said:
“This verification of historical high grade lithium resource gives Force greater incentive to further investigate the Zoro 1 property.”
Click here to read the Force Energy Corp. (OTCBB:FORC press release.