• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Battery Metals Market
    Battery Metals News
    Battery Metals Stocks
    • Battery Metals Market
    • Battery Metals News
    • Battery Metals Stocks

    DNI Metals Releases Final Assays from Phase I Program at Vohitsara

    Written by Charlotte McLeod
    |
    Sep. 24, 2015 10:14AM PST

    DNI Metals Inc. (TSXV:DNI) announced final assay (head grade) results from an initial Phase I development program at its Madagascar-based Vohitsara graphite project.

    DNI Metals Inc. (TSXV:DNI) announced final assay (head grade) results from an initial Phase I development program at its Madagascar-based Vohitsara graphite project.
    Work consisted of ground geophysics over and nearby historic French mine workings, as well as the excavation of a number of trenches over selected targets in the same areas.
    As quoted in the press release:

    The defined mineralized zone (i.e. from trench 4 to the north to trench 5 in the south) covers a strike length of over 700 metres; averaging 300-400 metres width.  The average mineralization tenor ranged from 3 to 13.14% Cgr with overburden averaging less than one meter thickness.

    Highlights include:

    Tr04 – Ridge to the North
    8m averaging 6.75%
    Including 1m @ 19.7% Cgr & 1m @ 11.70% Cgr
    Tr02 – Hilltop – 86m AMSL:
    21m averaging 3.41% Cgr:
    Including 2m @ 6.95% Cgr & 3m @ 5.40% Cgr
    Tr03 – Side-cut of local topographic high – 25m below peak and 66m AMSL:
    21m averaging 13.14% Cgr;
    Including 5m @ 18.48% Cgr (incl. 1m @ 25.3% Cgr) & 4m @ 13.75 Cgr)
    Tr05 – Trench to the south:
    10m averaging 3.021% Cgr;
    Including 2m @ 4.35% Cgr and 2m @ 4.50%

    Click here to read the full DNI Metals Inc. (TSXV:DNI) press release.

    The Conversation (0)

    Go Deeper

    AI Powered
    Final 2023 Drill Hole Results for CV5 at Corvette including 133.9 m at 1.21% Li2O and Extending Strike to 4.6 km

    Final 2023 Drill Hole Results for CV5 at Corvette including 133.9 m at 1.21% Li2O and Extending Strike to 4.6 km

    Updated Mineral Resource Estimate Doubles Measured & Indicated Resources at Canada Nickel's Crawford Nickel Sulphide Project

    Updated Mineral Resource Estimate Doubles Measured & Indicated Resources at Canada Nickel's Crawford Nickel Sulphide Project

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES