• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Base Metals Market
    Base Metals News
    Base Metals Stocks
    • Base Metals Market
    • Base Metals News
    • Base Metals Stocks

    Silver Bull Intersects High Grade Silver and Zinc on the Sierra Mojada Project

    Written by Investing News Network
    |
    Sep. 26, 2012 07:44AM PST

    Silver Bull Resources, Inc. (TSX:SVB) announced the fifth instalment of drill results for the Shallow Silver Zone on the Sierra Mojada Project in Northern Mexico, with high intercepts of 151.6g/t Silver Over 57.30 Meters Including 600.6g/t Over 5.95 Meters.

    Silver Bull Resources, Inc. (TSX:SVB) announced the fifth instalment of drill results for the Shallow Silver Zone on the Sierra Mojada Project in Northern Mexico, with high intercepts of 151.6g/t Silver Over 57.30 Meters Including 600.6g/t Over 5.95 Meters.

    As quoted in the press release:

    Highlights from the fifth batch of 10 holes include:

    • High grade silver intercepts including: 57.30 meters @ 151.6g/t Ag (including 5.95m @ 600.6g/t Ag, 5.05m @ 466.7g/t Ag & 2.1m @ 695.7g/t Ag), 32.00 meters @ 145.1g/t Ag (including 14.65m @ 248.7g/t Ag), 32.50 meters @ 81.7g/t Ag (including 3m @ 233.9g/t Ag & 2.5m @ 248.3g/t Ag) and 7 meters @ 140.8g/t Ag (including 1.75m @ 437g/t Ag).
    • High grade zinc intercepts including: 14 meters @ 7.84% Zn (including 1.9m @ 31.52% Zn), 11.8 meters @ 6.90% Zn, 4.5 meters @ 20.17% Zn and 2 meters @ 31.43% Zn.
    • Mineralization remains open in the north, south, east and westerly directions.

    In addition to confirming the grade and tenor of the silver and zinc mineralization with the twinning program, much of the historical long hole data set ended in significant mineralization, so the program will also look to extend the mineralization by drilling longer holes. Due to the limited range of the Termite drills, and despite extending some holes by as much as 25 meters, some holes still end in mineralization.

    Click here to read the Silver Bull Resources (TSX:SVB) press release

    See this press release on Marketwire
    Click here to see the Silver Bull Resources (TSX:SVB) profile

    tsx:svbdrill results
    The Conversation (0)

    Go Deeper

    AI Powered
    Silver47 Intersects High-Grade Mineralization in Step-Out Holes at Red Mountain, Alaska, and Hughes, Nevada

    Silver47 Intersects High-Grade Mineralization in Step-Out Holes at Red Mountain, Alaska, and Hughes, Nevada

    First Majestic Provides Positive Exploration Results at San Dimas

    Latest News

    Outlook Reports world

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES