9.81% Zinc Intersected Over 46.4 Meters and 100g/t Silver Over 43 Meters on the Shallow Silver Zone at the Sierra Mojada Project, Coahuila, Mexico

Base Metals Investing

Significant zinc intercepts including 9.81% Zn over 46.4 meters, 17.47% Zn over 13.15 meters, and 9.03% Zn over 17.5 meters from the Shallow Silver Zone at the Sierra Mojada Project, Coahuila, Mexico were announced by Silver Bull Resources, Inc. (TSX:SVB,AMEX:SVBL).

Significant zinc intercepts including 9.81% Zn over 46.4 meters, 17.47% Zn over 13.15 meters, and 9.03% Zn over 17.5 meters from the Shallow Silver Zone at the Sierra Mojada Project, Coahuila, Mexico were announced by Silver Bull Resources, Inc. (TSX:SVB,AMEX:SVBL).

As quoted in the press release:

Highlights include:
Results from 75 diamond core drill holes into the “Shallow Silver Zone,” equating to 11,700 meters of the 36,800 meter drill campaign completed in 2011.
80% of the drill holes intersected zones of silver oxide mineralization >30g/t Ag, including; 100g/t Ag over 43 meters, 170g/t over 11 meters and 213.4g/t Ag over 36.25 meters.
Significant zinc intercepts including; 9.81% Zn over 46.4 meters, 17.47% Zn over 13.15 meters, and 9.03% Zn over 17.5 meters.

Click here to read the Silver Bull Resources, Inc. (TSX:SVB) press release

The Conversation (0)
×