• Connect with us
  • Information
    • About Us
    • Contact Us
    • Careers
    • Partnerships
    • Advertise With Us
    • Authors
    • Browse Topics
    • Events
    • Disclaimer
    • Privacy Policy
  • NORTH AMERICA EDITION
    Australia
    North America
    World
Login
Investing News NetworkYour trusted source for investing success
  • NORTH AMERICA EDITION
    North America
    Australia
    World
  • My INN
Videos
Companies
Press Releases
Private Placements
SUBSCRIBE
  • Reports & Guides
    • Market Outlook Reports
    • Investing Guides
  • Button
Resource
  • Precious Metals
  • Battery Metals
  • Base Metals
  • Energy
  • Critical Minerals
Tech
Life Science
Base Metals Market
Base Metals News
Base Metals Stocks
  • Base Metals Market
  • Base Metals News
  • Base Metals Stocks

Poseidon Nickel Completes Drill Program at Emily Ann North

Charlotte McLeod
Mar. 21, 2016 04:24PM PST
Base Metals Investing

Poseidon Nickel Ltd. (ASX:POS) announced final results from a drill program completed at the Emily Ann North extension. According to the company, “significant nickel sulphide mineralisation” was intersected in all three diamond drill holes completed as part of the program.

Poseidon Nickel Ltd. (ASX:POS) announced final results from a drill program completed at the Emily Ann North extension. According to the company, “significant nickel sulphide mineralisation” was intersected in all three diamond drill holes completed as part of the program.
Other highlights are as follows:

  • Assays received from the third and final drill hole also intersected nickel sulphide mineralisation, finalising the Emily Ann Extension drill programme at Lake Johnston
  • Drill hole PLJD0003 intersected a zone of massive nickel sulphide mineralisation grading 1.13m at 3.35% Ni, including 0.26m at 8.67% Ni, as well as a lower stringer/disseminated zone comprising 0.62m @ 1.75% Ni
  • All three drill holes intersected nickel sulphide mineralisation increasing the potential for this zone to develop into a large economic deposit
  • DHEM generated large off hole anomalies defining the likely geometry of the nickel sulphide mineralisation and providing future drilling targets
  • Advancements in DHEM technology over the last 10yrs will further assist in the exploration for nickel sulphides
  • These intersections are located only 360m from the existing flooded decline in the Emily Ann underground mine which averaged a resource grade of 4.1% nickel and produced 46,000 tonnes nickel

Click here to read the full Poseidon Nickel Ltd. (ASX:POS) press release.

asx-pos
The Conversation (0)

Go Deeper

AI Powered
Pivotal Metals

Upcoming Exploration and Development Work Program Outlined for Quebec Battery Metals Project

Toro Energy

Diamond Drilling Recommences At Toro’s Dusty Nickel Project

Latest News

Outlook Reports

Resource
  • Precious Metals
    • Gold
    • Silver
  • Battery Metals
    • Lithium
    • Cobalt
    • Graphite
    • Electric Vehicles
  • Agriculture
  • Base Metals
    • Copper
    • Nickel
    • Zinc
  • Critical Metals
    • Rare Earths
  • Energy
    • Uranium
    • Oil and Gas
Tech
    • Artificial Intelligence
    • Cybersecurity
    • Robotics
    • Crypto
    • Cleantech
Life Science
    • Biotech
    • Cannabis
    • Pharmaceuticals

Featured Stocks

More featured stocks

Browse Companies

Resource
  • Precious Metals
  • Battery Metals
  • Energy
  • Base Metals
  • Critical Metals
Tech
Life Science
MARKETS
COMMODITIES
CURRENCIES